Maragak is E,Douglas B M,Chen Q,et al.Full-resonance tests of araiwlay bridge[C]//Structures Congress-Proceedings 1.ASCE,1996,183-190.
[2]
罗学海,朱葳,谢逢萱.铁路实体桥墩动力分析的简化方法[J].地震工程与工程振动,1982,2(3):87-95. Luo Xuehai, ZhuWei, Xie Fengxuan.A smiplified method for dynamic analysis of piers of railway bridges[J].Journal of Earthquake Engineering and Engineering Vibration,1982,2(3):87-95.
[3]
黄艳,阎贵平,刘林.轨道约束对铁路桥梁纵向地震反应特性的影响[J].铁道学报,2002,24(5):124-128. Huang Yan,Yan Guiping,Liu Lin.Effects of rail restraints onlongitudinal seismic response of railway bridges[J].Journal of The China Railway Society,2002,24(5):124-128.
[4]
马坤全,陈文艳.轨道交通高架桥合理抗震设计参数及抗震措施研究[J].中国铁道科学,2001,22(4):63-68. MA Kunquan,Chen Wenyan.The Research of the reasonable seismic design parameters and antiseismicm easures of mass transit viaducts[J].China Raiwlay Science,2001,22(4):63-68.
[5]
Ⅱ型板对桥梁地震反应的影响[R].兰州交通大学,2010. The influence of Ⅱ type slab on seismic response of the bridge[R].Lanzhou Jiaotong University,2010.
[6]
GB50111-2006铁路工程抗震设计规范[S].GB50111-2006,Code for Seismic Design of Railweug Engineering[S].
[7]
郑健.中国高速铁路桥梁[M].北京:高等教育出版社,2008. Zheng Jian. The Bridge of High-speed Railway in China[M].Beijing:Higher Education Press,2008.