LU Huaijing, YU Dingwen, ZHANG Yufeng. Construction of assembly BOM for integration of PDM and MRPⅡ[J]. Machine Design and Manufacturing Engineering,2002,31(1):34-36(in Chinese).[卢怀静,郁鼎文,张玉峰.面向PDM/MRPⅡ集成的装配BOM[J].机械设计与制造工程,2002,31(1):34-36.]
[2]
CHEN Zongshun, LIU Fangrong, WU Chunyan. Mechanical assembly process planning and assembly CAPP[M]. Beijing:China Machine Press,2007(in Chinese).[陈宗舜,刘方荣,吴春燕.机械制造装配工艺设计与装配CAPP[M].北京:机械工业出版社,2007.]