小净距盾构隧道施工管片附加应力监测与分析

Keywords: 盾构隧道,小净距隧道,附加应力,现场监测

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了研究在小净距隧道施工过程中新建隧道对先行隧道内力的影响,本文通过实际工程现场监测数据,总结了先行隧道管片附加内力大小及变化规律.采用振弦式表面应变计和频率读数仪对北京地铁某区间先行隧道管片环向和纵向的附加应力进行了现场监测,给出了环向附加应力和纵向附加应力历时变化曲线,并对不同测点附加应力在历时变化中最大值及稳定值进行了比较分析.监测结果表明:环向应力为压应力,其量值比纵向应力的量值大,且水平直径处受力最大,最大值达12.77MPa.所得结论定量评价了小净距盾构隧道施工相互影响程度,为盾构隧道设计施工监测提供参考依据.

References

[1]  周文波,郑宜枫,滕丽,等.双圆盾构隧道施工过程中管片力学性状的原位测试研究[J].力学季刊,2005,26(3):459-463.ZHOU Wen-bo,ZHENG Yi-feng,TENG Li,et al.Mechanics characteristics study of segment in double-O-tube tunnel under in-situ test method during itsconstruction process[J].Chinese Quarterly of Mechanics,2005,26(3):459-463.(in Chinese)
[2]  邵华,张子新.盾构近距离穿越施工对已运营隧道的扰动影响分析[J].岩土力学,2004,25(增刊2):545-549.SHAO Hua,ZHANG Zi-xin.Analysis of disturbing effecton running subway caused by adjacent shield-driven[J].Rock and Soil Mechanics,2004,25(sup2):545-549.(in Chinese)
[3]  陈越峰,张庆贺,张颖,等.近距离三线并行盾构隧道施工实测分析[J].地下空间与工程学报,2008,4(2):335-340.CHEN Yue-feng,ZHANG Qing-he,ZHANG Ying,et al.In-situ monitoring and analyzing on construction of threeclosely spaced parallel pipe shield tunnels[J].ChineseJournal of Underground Space and Engineering,2008,4(2):335-340.(in Chinese)
[4]  方勇,何川.平行盾构隧道施工对既有隧道影响的数值分析[J].岩土力学,2007,28(7):1402-1406.FANG Yong,HE Chuan.Numerical analysis of effects ofparallel shield tunneling on existent tunnel[J].Rock andSoil Mechanics,2007,28(7):1402-1406.(in Chinese)
[5]  陶连金,唐四海,金亮.隧道上穿既有车站结构的变形预测及安全评估[J].地下空间与工程学报,2008,4(3):442-447.TAO Lian-jin,TANG Si-hai,JIN Liang.Deformationprediction and risk evaluation of the existing subway stationstructure with above-traversed tunnel[J].Chinese Journalof Underground Space and Engineering,2008,4(3):442-447.(in Chinese)
[6]  林志,朱合华,夏才初.双线盾构隧道施工过程相互影响的数值研究[J].空间与工程学报,2009,5(1):85-89.LIN Zhi,ZHU He-hua,XIA Cai-chu.Numerical modelingstudy on interaction between twin shields tunneling[J].Chinese Journal of Undergro und Space and Engineering,2009,5(1):85-89.(in Chinese)
[7]  何川,苏宗贤,曾东洋.盾构隧道施工对已建平行隧道变形和附加内力的影响研究[J].岩石力学与工程学报,2007,26(10):2063-2069.HE Chuan,SU Zong-xian,ZENG Dong-yang.Research oninfluence of shield tunnel construction on deformation andsecondary inner force of constructed parallel tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2063-2069.(in Chinese)
[8]  陈俊生,莫海鸿.盾构隧道管片施工阶段力学行为的三维有限元分析[J].岩石力学与工程学报,2006,25(增2):3482-3489.CHEN Jun-sheng,MO Hai-hong.Three-dimensional finiteelement analysis of mechanical behaviors of shield tunnelsegment during construction[J].Chinese Journal of RockMechanics and Engineering,2006,25(sup2):3482-3489.(in Chinese)
[9]  朱合华,丁文其,李晓军.盾构隧道施工力学性态模拟及工程应用[J].土木工程学报,2000,33(3):98-103.ZHU He-hua,DING Wen-qi,LI Xiao-jun.Constructionsimulation for the mechanical behavior of shield tunnel andits application[J].China Civil Engineering Journal,2000,33(3):98-103.(in Chinese)
[10]  张昆,郭菊彬.新建与既有地铁隧道正交段施工力学行为研究[J].铁道工程学报,2010(2):81-84.ZHANG Kun,GUO Ju-bin.Research on the mechanicalbehaviors of new tunnel construction in the areaorthogonal to existing metro tunnel[J].Journal ofRailway Engineering Society,2010(2):81-84.(inChinese)