姚爱军,向瑞德,衡朝阳.地铁开挖过程与临近建筑地基变形的动态响应[J].地下空间与工程学报,2007,3(6):1574-1578.YAO Ai-jun,XIANG Rui-de,HENG Chao-yang.Dynamic fesponse of the foundation deformation of buildings nearby thesubway excavation[J].Chinese Journal of Underground Space and Engineering,2007,3(6):1574-1578.(in Chinese)
[2]
郭军,陶连金,边金.盾构施工地铁区间隧道的地表沉降[J].北京工业大学学报,2005,31(6):589-592.GUO Jun,TAO Lian-jin,BIAN Jin.Ground surface settlement analysis during the subway tunnel excavation by shielding[J].Journal of Beijing University of Technology,2005,31(6):589-592.(in Chinese)
[3]
芮勇勤,岳中琦,唐春安,等.隧道开挖方式对建筑物桩基影响的数值模拟分析[J].岩石力学与工程学报,2003,22(5):735-741.RUI Yong-qin,YUE Zhong-qi,TANG Chun-an,et al.Numerical simulation analysis on influence of tunnel excavation typeson pile foundation of building[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(5):735-741.(in Chinese)
[4]
陶龙光,刘波,丁城刚,等.盾构过地铁站施工对地表沉降影响的数值模拟[J].中国矿业大学学报,2003,32(3):236-240.TAO Long-guang,LIU Bo,DING Cheng-gang,et al.Numerical simulation of ground settlement due to constructing metro-station based onshield tunneling[J].Journal of China University of Mining&Technology,2003,32(3):236-240.(inChinese)
[5]
陶连金,边金.两种浅埋暗挖法开挖地铁车站的比较[J].北京工业大学学报,2004,30(2):180-184.TAO Lian-jin,BIAN Jin.Comparative analysis of two different excavation methods of subway station[J].Journal ofUniversity of Technology,2004,30(2):2809184.(in Chinese)
[6]
白明洲,许兆义,时静,等.复杂地质条件下浅埋暗挖地铁车站施工期地面沉降量FLAC~(3D)分析[J].岩石力学与工程学报,2006,25(2):4254-4260.BAI Ming-zhou,XU Zhao-yi,SHI Jing,et al.Analysis of ground settlement of a subway station undercut with shallowoverburden during construction with FLAC~(3D)under complex geological conditions[J].Chinese Journal of RockMechanics and Engineering,2006,25(2):4254-4260.(in Chinese)
[7]
李大勇,王晖,武亚军.盾构掘进对周围环境的影响分析[J].地下空间与工程学报,2005,11(7):1062-1064.LI Da-yong,WANG Hui,WU Ya-jun.Impact of shield tunneling on the environment around the tunnel[J].Chinese Journalof Underground Space and Engineering,2005,11(7):1062-1064.(in Chinese)
[8]
刘波,叶圣国,陶龙光,等.地铁盾构施工引起邻近基础沉降的FLAC元数值模拟[J].煤炭科学技术,2002,30(10):9-11.LIU Bo,YE Sheng-guo,TAO Long-guang,et al.Flac element numerical simulation of foundation settlement caused byadjacent metro shield construction[J].Coal Science&Technology,2002,30(10):9-11.(in Chinese)
[9]
张晓丽,王梦恕,张顶力.减小浅埋暗挖法施工对建构筑物影响的措施[J].中国安全科学学报,2005,15(11):69-72.ZHANG Xiao-li,WANG Meng-shu,ZHANG Ding-li.Measures reducing the effects on structure by underground cuttingwith shallow overburden[J].China Safety Science Journal,2005,15(11):69-72.(in Chinese)