大理岩磨擦试验及隧道掘进机刀具磨损分析——锦屏二级水电站引水隧洞工程

Keywords: Cerchar磨擦试验,大理岩,滚刀磨损,引水隧洞,隧道掘进机

Full-Text   Cite this paper   Add to My Lib

Abstract:

作者对锦屏二级水电站隧道掘进机施工引水隧洞沿线各大理岩岩组取样后在室内进了岩石的Cerchar磨擦试验,对试验结果进行了分级评价.通过对现场施工中的滚刀磨损数据分析表明,各大理岩岩组对刀具的磨擦性普遍较低,对刀具的正常磨损少,与磨擦试验结果一致;但由于隧道掘进机开挖过程中掌子面不平整,造成了大量滚刀的异常破坏.

References

[1]  WEST G.Rock abrasiveness testing for tunneling[J].IntJ Rock Mech Min Sci&Geomech Abstr,1989,26(2):151-160.
[2]  BUCHI E,MATHIER J F,WYSS C.Rock abrasivity-asignificant cost factor for mechanical tunneling in loose andhard rock[J].Tunnel,1995(5):38-44.
[3]  AL-AMEEN A I,WALLER M D.The influence of rockstrength and abrasive mineral content on the Cercharabrasive index[J].Engineering Geology,1994,36(3/4):293-301.
[4]  PLINNINGER R,SPAUN G,THURO K.Prediction andclassification of tool wear in drill and blast tunneling[C]∥Engineering Geology for Developing Countries.Proceedingsof the 9th IAEG Congress.VAN ROOY J L,JERMY C A.[s.l.]:[s.n],2002:2226-2236.
[5]  SUANA M,PETERS T.The Cerchar abrasivity index andits relation to rock mineralogy and petrography[J].RockMechanics,1982,15(1):1-7.
[6]  MICHALAKOPOULOS T N,ANAGNOSTOU V G,BASSANOU M E,et al.The influence of steel stylihardness on the Cerchar abrasiveness index value[J].International Journal of Rock Mechanics and MiningSciences,2006,43(2):321-327.
[7]  ALBER M.Stress dependency of the Cerchar abrasivityindex(CAI)and its effects on wear of selected rockcutting tools[J].Tunnelling and Underground SpaceTechnology,2008,28(4):351-359.
[8]  中国水电顾问集团华东勘察设计研究院.锦屏辅助洞竣工报告工程地质篇[R].浙江:中国水电顾问集团华东勘察设计研究院,2009.Hydro-China Huadong Engineering Corporation.Projectcompletion report of auxiliary tunnels in Jinpinghydropower station:part of engineering geology[R].Hangzhou:Hydro-China Huadong EngineeringCorporation,2009.(in Chinese)
[9]  BRULAND A.Hard rock tunnel boring[D].Trondheim,Norway:Department of Civil and Transport Engineering ofNorwegian University of Science and Technology,1998.
[10]  ROSTAMI J,OZDEMIR L,BRULAND A,et al.Reviewof issues related to cerchar abrasivity testing and theirimplications on geotechnical investogations and cutter costestimates[C]∥Proceedings of the 2005 Rapid Excavationand Tunneling Conference(RETC)in Seatle.Littleton,Colorado,USA:Society for Mininy,Metallurgy andExploration,2005:27-29.
[11]  龚秋明,佘祺锐,王继敏,等.不同层厚层状岩体对TBM开挖的影响[J].岩石力学与工程学报,2010,29(7):1442-1449.GONG Qiu-ming,SHE Qi-rui,WANG Ji-min,et al.Theinfluence of difference thickness of the marble layers onTBM excavation[J].Chinese Journal of Rock Mechanicsand Engineering,2010,29(7):1442-1449.(inChinese)
[12]  吴世勇,龚秋明,王鸽,等.锦屏二级水电站深部大理岩板裂化破坏实验研究及其对TBM开挖的影响[J].岩石力学与工程学报,2010,29(6):1095-1104.WU Shi-yong,GONG Qiu-ming,WANG Ge,et al.Experimental study of slabbing failure for deep buriedmarble at Jinping II hydropower station and its influenceson TBM excavation[J].Chinese Journal of RockMechanics and Engineering,2010,29(6):1095-1104.(in Chinese)
[13]  ZHAO J,GONG Q M,EISENSTEN Z.Tunnelling througha frequently changing and mixed ground:A case history inSingapore[J].Tunnelling and Underground SpaceTechnology,2007,22(4):388-400.
[14]  张珂,王贺,吴玉厚,等.全断面硬岩TBM滚刀磨损关键技术分析[J].沈阳建筑大学学报:自然科学版,2009,25(2):351-354.ZHANG Ke,WANG He,WU Yu-hou,et al.Analysis onkey wear technology of the TBM disc cutter[J].Journal ofShenyang Jianzhu University:Natural Science,2009,25(2):351-354.(in Chinese)
[15]  GONG Qiu-ming.Development of a rock masscharacteristics model for TBM penetration rate prediction[D].Singapore:School of Civil and EnvironmentalEngineering of Nanyang Technological University,2005.
[16]  HOWARTH D H,ROWLANDS J C.Quantitativeassessment of rock texture and correlation with drillabilityand strength properties[J].Rock Mech Rock Eng,1987,第8期龚秋明,等:大理岩磨擦试验及隧道掘进机刀具磨损分析———锦屏二级水电站引水隧洞工程20(1):57-85.
[17]  NILSEN B,DAHL F,HOLZHAUSER J,et al.Abrasivitytesting for rock and soils[J].Tunnels and TunnellingInternational,2006(April):47-49.