鹿建阁.钢管混凝土拱桥吊杆的破损行为分析[D].天津:天津大学建筑工程学院,2005.LU Jian-ge.Research on the damage of hangers ofconcrete-filled steel tubular arch bridges[D].Tianjin:College of Architecture and Civil Engineering of TianjinUniversity,2005.(in Chinese)
[2]
吴定俊,王小松,项海帆.高速铁路尼尔森拱桥车桥动力特性[J].铁道学报,2003,25(3):96-100.WU Ding-jun,WANG Xiao-song,XIANG Hai-fan.Thebridge-vehicle dynamics characteristic of Nelson archbridge in high speed railway[J].Journal of the ChinaRailway Society,2003,25(3):96-100.(in Chinese)第6期杨建荣,等:钢管混凝土系杆拱桥车桥耦合振动分析
[3]
单德山,李乔.铁路提篮拱桥车桥耦合振动分析[J].西南交通大学学报,2005,40(1):53-57.SHAN De-shan,LI Qiao.Coupled vibration analysis of x-style arch bridge and vehicles[J].Journal of SouthwestJiaotong University,2005,40(1):53-57.(in Chinese)
[4]
ROEDER C W,MACRAE C,CROCKER P,et al.Dynamic response and fatigue of steel tied-arch bridge[J].Journal of Brdige Engineering,2000,5(1):14-21.
[5]
HENCHI K,FAFARD M.Dynamic behavior of multi-spanbeams under moving loads[J].Journal of Sound andVibration,1997,199(1):33-50.
[6]
ZHANG Yin,CAI C S,SHI Xiao-min,et al.Vehicle-induced dynamic performance of FRP versus concrete slabbridge[J].Journal of Bridge Engineering,2006,11(4):410-419.
[7]
CRAIG R C.Structural dynamics[M].New York:JohnWiley&Sons Inc,1995.
[8]
陈宝春.钢管混凝土拱桥实例集(一)[M].北京:人民交通出版社,2002:2-8.
[9]
FAFARD M,LAFLAMME M,SAVARD M,et al.Dynamic analysis of existing continuous bridge[J].Journal of Bridge Engineering,1998,3(1):28-37.
[10]
American Association of State Highway and Transportationofficials(AASHTO).LRFD Bridge Design Specifications[S].Washington D C:American Association of StateHighway and Transportation Officials,2005.
[11]
American Association of State Highway and TransportationOfficials(AASHTO).Standard Specifications forHighway Bridges[S].Washington D C:AmericanAssociation of State Highway and Transportation Officials,2004.
[12]
Ontario Ministry of Transportation and Communication.Ontario highway bridge design code[S].Toronto:theHighway Engineering Divistion,1983.
[13]
李乔,田学民,张清华.铁路大跨度提篮式系杆拱桥全桥模型试验[J].中国铁道科学,2003,24(1):88-93.LI Qiao,TIAN Xue-min,ZHANG Qing-hua.A model teston long-span x-style tied arch bridge on railway[J].ChinaRailway Science,2003,24(1):88-93.(in Chinese)
[14]
MALMA R,ANDERSSON A.Field testing and simulationof dynamic properties of a tied arch railway bridge[J].Engineering Structures,2006,28:143-152.
[15]
BHATT P.Programming the dynamic analysis ofstructures[M].London:Spon Press,2002.
[16]
DODDS C J,ROBSON J D.The description of roadsurface roughness[J].Journal of Sound and Vibration,1973,31(2):175-183.
[17]
ISO.ISO 8608:IDT.Mehcanical Vibration-Road SurfaceProfiles-Reporting of Measured Data[S].Geneva:International Organization for Standardization,1995.
[18]
中华人民共和国交通部.JTG D60—2004公路桥涵设计通用规范[S].北京:人民交通出版社,2004.Ministry of Transport of the People's Republic of China.JTG D60—2004 General Code for Design of HighwayBridges and Culverts[S].Beijing:ChinaCommunications Press,2004.(in Chinese)