SHIM Chang-Su,LEE Pil-Goo,YOON Tae-Yang.Staticbehavior of large stud shear connectors[J].EngineeringStructures,2004,26(12):1853-1860.
[2]
LAM Dennis,EI-LOBODY Ehab.Behavior of headed studshear connectors in composite beam[J].Journal of StructuralEngineering,2005,131(1):96-107.
[3]
STEPHEN Hicks,GRAHAM Couchman.The shearresistance and ductility requirements of headed stud usedwith profiled steel sheeting[C]∥Composite Constructionin Steel and Concrete V Proceedings of the 5thInternational Conference,Kruger National Park,Berg-en-Dal,Mpumalanga,South Africa,July 18-23,2006:511-523.
[4]
薛伟辰,丁敏,王骅,等.单调荷载下栓钉连接件受剪性能试验研究[J].建筑结构学报,2009,30(2):95-100.XUE Wei-chen,DING Min,WANG Hua,et al.Experimental studies on behavior of stud shear connectorsunder monotonic loads[J].Journal of Building Structures,2009,30(2):95-100.(in Chinese)
[5]
郑山锁,邓国专,杨勇,等.型钢混凝土结构粘结滑移性能试验研究[J].工程力学,2003,20(5):63-69.ZHENG Shan-suo,DENG Guo-zhuan,YANG Yong,et al.Experimental study on bond-slip performance betweensteel and concrete in SRC structures[J].EngineeringMechanics,2003,20(5):63-69.(in Chinese)
OLLGAARD J,SLUTTER R G,FISHER J W.Strength ofstud shear connection in lightweight and normal-weightconcrete[J].AISC Engineering Journal,1971,8(2):55-64.
[9]
叶见曙,王斐峰,王建.钢板在混凝土中锚固性能的试验研究[J].东南大学学报,1998,28(6):117-122.YE Jian-shu,WANG Fei-feng,WANG Jian.Expermentalresearch on anchorage performance of steel plate inreinforced concrete[J].Journal of Southeast University,1998,28(6):117-122.(in Chinese)
[10]
周安,戴航,刘其伟.栓钉连接件极限承载力及剪切刚度的试验[J].工业建筑,2007,37(10):84-87.ZHOU An,DAI Hang,LIU Qi-wei.Experiment onultimate bearing capacity and shear rigidity of studconnectors[J].Industrial Construction,2007,37(10):84-87.(in Chinese)