刘洪正,刘凯,孟海磊,等.±660 kV直流同塔双回输电线路带电作业试验研究[J].高电压技术,2011,37(12):2997-3004.Liu Hongzheng,Liu Kai,Meng Hailei,et al.Experimental research of live working on ±660 kV double circuit DC transmission line on the same tower[J].High Voltage Engineering,2011,37(12):2997-3004(in Chinese)..
[2]
蒋正龙,龚正雄,赵纯,等.500 kV湘云同塔双回线路带电作业安全性分析[J].湖南电力,2010,30(6):23-30.Jiang Zhenglong,Gong Zhengxiong,Zhao Chun,et al.Safety analysis of live working on 500 kV double-circuit transmission line of Xiangyun[J].Hunan Electric Power,2010,30(6):23-30(in Chinese).
[3]
胡毅,王力农,邵瑰玮,等.1000kV级交流输电线路带电作业的试验研究[J].电网技术,2007,31(6):8-13.Hu Yi,Wang Linong,Shao Guiwei,et al.Experimental investigation on live working for 1000kV AC transmission line [J].Power System Technology,2007,31(6):8-13(in Chinese).
[4]
舒印彪,胡毅.特高压交流输电线路的运行维护与带电作业[J].高电压技术,2007,33(6):1-5.Shu Yinbiao,Hu Yi.The operation maintenance and live working of UHV AC transmission line [J].High Voltage Engineering,2007,33(6):1-5(in Chinese).
王力农,胡毅,邵瑰玮,等.1 000 kV输电线路带电作业安全距离研究[J].高电压技术,2006,32(12):78-84.Wang Linong,Hu Yi,Shao Guiwei,et al.Research on safe distance for live working on 1 000 kV transmission line[J].High Voltage Engineering,2006,32(12):78-84(in Chinese).
[7]
胡毅,聂定珍,王力农.500 kV同塔双回紧凑型线路的带电作业安全距离[J].高电压技术,2003,29(8):3-5.Hu Yi,Nie Dingzhen,Wang Linong.The research of safe distance for live working on 500 kV compact double circuit transmission line [J].High Voltage Engineering,2003,29(8):3-5(in Chinese).
[8]
胡毅,王力农,邵瑰玮,等.紧凑型输电线路带电作业方式及安全防护[J].电网技术,2007,31(23):6-10.Hu Yi,Wang Linong,Shao Guiwei,et al.The live working method and safety protection of compact transmission line[J].Power System Technology,2006,30(21):354-359(in Chinese).
[9]
胡毅,王力农,邵瑰玮,等.750 kV输电线路带电作业的试验研究[J].电网技术,2006,30(2):8-14.Hu Yi,Wang Linong,Shao Guiwei,et al.Test research on live working of 750 kV transmission line [J].Power System Technology,2006,30(2):8-14(in Chinese).
[10]
胡毅,王力农,刘凯,等.750 kV输电线路带电作业组合间隙的研究[J].电力设备,2006,7(1):29-32.Hu Yi,Wang Linong,Liu Kai,et al.Research on combined gap of live line work for 750 kV power transmission line [J].Power Equipment,2006,7(1):29-32(in Chinese).
[11]
胡毅,王力农,刘凯,等.750 kV同塔双回输电线路带电作业技术研究[J].高电压技术,2009,35(2):373-378.Hu Yi,Wang Linong,Liu Kai,et al.Research of live working on 750 kV double circuit AC transmission line[J].High Voltage Engineering,2009,35(2):373-378(in Chinese).
[12]
肖宾,王力农,刘凯,等.750 kV同塔双回紧凑型线路带电作业技术试验分析[J].高电压技术,2010,36(11):2863-2868.Xiao Bin,Wang Linong,Liu Kai,et al.Experimental analysis of live working on 750 kV compact double circuits transmission line on the same tower[J].High Voltage Engineering,2010,36(11):2863-2868(in Chinese).
[13]
刘振,郭阳.750 kV单回紧凑型线路带电作业方式试验研究[J].高电压技术,2009,35(11):2876-2880.Liu Zhen,Guo Yang.Experimental research on hot-line work of 750 kV single compact power transmission line[J].High Voltage Engineering,2009,35(11):2876-2880(in Chinese).
[14]
王力农,胡毅,刘凯,等.500 kV高海拔紧凑型线路带电作业研究[J].高电压技术,2005,31(8):12-14.Wang Linong,Hu Yi,Liu Kai,et al.Research of live working on 500 kV compact transmission lines in high altitude area[J].High Voltage Engineering,2005,31(8):12-14(in Chinese).
[15]
郝旭东,龚延兴.500 kV紧凑型输电线路带电作业研究[J].电力设备,2005,6(2):29-32.Hao Xudong,Gong Yanxing.Study on 500 kV compact transmission line and its live line work[J].Power Equipment,2005,6(2):29-32(in Chinese).
[16]
胡毅,刘凯,王力农,等.1 000 kV同塔双回输电线路带电作业技术试验研究[J].高电压技术,2010,36(11): 2668-2673.Hu Yi,Liu Kai,Wang Linong,et al.Experimental research of live working on 1 000 kV double circuit AC transmission line on the same tower [J].High Voltage Engineering,2010,36(11): 2668-2673(in Chinese).
[17]
胡毅,王力农,刘凯,等.特高压交流输电线路带电作业现场应用试验[J].高电压技术,2009,35(9):2053-2058.Hu Yi,Wang Linong,Liu Kai,et al.On-site application test of live working of UHV AC transmission line[J].High Voltage Engineering,2009,35(9):2053-2058(in Chinese).
[18]
王力农,胡毅,刘凯,等.特高压输电线路带电作业组合间隙的放电机理[J].高电压技术,2011,37(5):1224-1231.Wang Linong,Hu Yi,Liu Kai,et al.Complex gap discharge mechanism of live working on Ultra High Voltage transmission lines[J].High Voltage Engineering,2011,37(5):1224-1231(in Chinese).
[19]
胡毅,肖宾,刘凯,等.±500 kV同塔双回直流线路带电作业试验研究[J].高电压技术,2010,36(2):318-321.Hu Yi,Xiao Bin,Liu Kai,et al.Experimental research of live working on ±500 kV double circuit DC transmission line on the same tower[J].High Voltage Engineering,2010,36(2):318-321(in Chinese).
[20]
舒印彪,赵丞华.研究实施中的500 kV同塔双回紧凑型输电线路[J].电网技术,2002,26(4):49-51.Shu Yinbiao,Zhao Chenghua.500 kV compact type double circuit transmission line on one tower under study and implementation[J].Power System Technology,2002,26(4):49-51(in Chinese).
[21]
刘洪正,刘凯,孟海磊,等.±660 kV直流输电带电作业安全距离的试验研究[J].电网技术,2011,35(11):183-189.Liu Hongzheng, Liu Kai, Meng Hailei, et al.Experimental research on safety distance for live-line working carried out on ±660 kV DC power transmission line[J].Power System Technology,2011,35(11):183-189(in Chinese).
[22]
廖蔚明,孙昭英,宿志一,等.高压直流输电线路V型串塔头间隙操作冲击放电电压的海拔校正[J].电网技术,2012,36(1):182-188.Liao Weiming,Sun Zhaoying,Su Zhiyi,et al.Altitude correction of switching impulse flashover voltage of tower gaps with V-shaped insulator strings for HVDC power transmission lines[J].Power System Technology,2012,36(1):182-188(in Chinese).
[23]
张刘春,张翠霞,张搏宇,等.±800 kV级联多端特高压直流输电工程的绝缘配合[J].电网技术,2012,36(12):60-65.Zhang Liuchun,Zhang Cuixia,Zhang Boyu,et al.Insulation coordination of ±800 kV cascaded multi-terminal DC transmission project[J].Power System Technology,2012,36(12):60-65 (in Chinese).
[24]
范建斌,廖蔚明,李庆峰,等.±800 kV直流输电线路带电作业方式的试验研究[J].电力建设,2009,30(7):7-12.Fan Jianbin,Liao Weiming,Li Qingfeng,et al.Experimental research on live-line operation for ±800 kV DC transmission line[J].Electric Power Construction,2009,30(7):7-12(in Chinese).