[1] | IEC 61850-90-1 Use of IEC 61850 for the communication between substations[S].
|
[2] | IEC 61850-80-1 Exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104[S].
|
[3] | IEC 61850-7-410 Hydroelectric power plants:communication for monitoring and control[S].
|
[4] | IEC 61850-7-420 Basic communication structure:distributed energy resources logical nodes[S].
|
[5] | 赵上林,胡敏强,窦晓波,等.基于IEEE 1588的数字化变电站时钟同步技术研究[J].电网技术,2008,32(21):97-102.
|
[6] | Zhao Shanglin,Hu Minqiang,Dou Xiaobo,et al.Research of time synchronization in digital substation based on IEEE 1588[J].Power System Technology,2008,32(21):97-102(in Chinese).
|
[7] | 钟金,郑睿敏,杨卫红,等.建设信息时代的智能电网[J].电网技术,2009,33(13):12-18.
|
[8] | Zhao Jianghe,Wang Liyan.Information structure of smart distribution network[J].Power System Technology,2009,33(15):26-29(in Chinese).
|
[9] | Li Yongliang.Study of communication methods between digital substations and remote control centers[C].ICEE 2009,中国沈阳.
|
[10] | Standards identified for inclusion in the smart grid interoperability standards framework[EB/OL].http://www.nist.gov/smartgrid/ standards.html.
|
[11] | 林宇锋,钟金,吴复立.智能电网技术体系探讨[J].电网技术,2009,33(12):8-14.
|
[12] | Lin Yufeng,Zhong Jin,Fulix Wu.Discussion on smart grid supporting technologies[J].Power System Technology,2009,33(12):8-14(in Chinese).
|
[13] | IEC 61850-6 Ed.2(CDV) Configuration description language for communication in electrical substations related to IEDs[S].
|
[14] | Brunner C.IEC 61850:introduction[EB/OL].2009-04-24 [2009-08-12].http://pes.ieee.ch/downloads/09043iec61850.pdf.
|
[15] | IEC 61850-7-4 Ed.2(CDV) Basic communication structure:compatible logical node classes and data classes[S].
|
[16] | IEC 61850-7-3 Ed.2(CDV) Basic communication structure:common data classes[S].
|
[17] | Zhong Jin,Zheng Ruimin,Yang Weihong,et al.Construction of smart grid at information age[J].Power System Technology,2009,33(13):12-18(in Chinese).
|
[18] | 赵江河,王立岩.智能配电网的信息构架[J].电网技术,2009,33(15):26-29.
|