[1] | 傅书逷.2008电网控制中心新技术综述[J].电网技术,2009,33(9):1-7. Fu Shuti.Summary on 2008 new technologies for power grid control centers[J].Power System Technology,2009,33(9):1-7(in Chinese).
|
[2] | CIGRE D2.24.EMS architecture of the 21th century:system requirement,part 1 common requirements[S].2009.
|
[3] | CIGRE D2.24.EMS architecture of the 21th century:system requirement,part 2 architecture guidelines[S].2009.
|
[4] | Milano F,Vanfretti L.State of the art and future of OSS for power systems[C].2009 IEEE PES General Meeting,Calgary,Canada.
|
[5] | Zhou M.InterPSS[EB/OL].http://www.interpss.org.
|
[6] | http://ewh.ieee.org/cmte/psace/CAMS_taskforce/index.htm.
|
[7] | Kafka R J.Review of PJM restoration practices and NERC restoration standards[C].2008 IEEE PES General Meeting,Pittsburgh,PA,USA.
|
[8] | Levesque F,Si Truc Phan Dumas A,Boisvert M.Restoration plan :the Hydro-Quebec experience[C].2008 IEEE PES General Meeting,Pittsburgh,PA,USA.
|
[9] | PJM Manuals:M-36 system restoration,M12 dispatching[EB/OL].http://pjm.com/contributions/pjm-manuals/manuals.html.
|
[10] | Willson J D,Operator Training Working Group.System restoration guidelines:how to set-up,conduct,and evaluate a drill[J].IEEE Trans on Power Systems,1996,11(3):1619-1629.
|