[1] | 刘振亚,舒印彪.特高压交流输电技术研究成果专辑[M].北京:中国电力出版社,2009:2-11.
|
[2] | Kovalev V,Panibratets A,Volkova O,et al.The equipment for the AC 1150 kV transmission line[C]//International Workshop on UHV AC Transmission Technology.Beijing,China:Chinese Society for Electrical Engineering,2005:83-87.
|
[3] | EPRI(USA),Transmission line reference book-345 kV and above [M].EL-2500.Boston,America:The Institute,1987:566-602.
|
[4] | 中村秋夫,冈本浩,曹祥麟.东京电力公司的特高压输电技术应用现状[J].电网技术,2005,29(6):58-62.
|
[5] | Kazuo Nakamura Autumn,Okamoto Hao,Cao Xianglin.Tokyo Electric Power Company’s high voltage transmission technology application status[J].Power System Technology,2005,29(6):58-62(in Chinese).
|
[6] | 陆宠惠.日本1 000 kV特高压输电技术[J].高电压技术,1998,24(2):102-105.
|
[7] | Lu Chonghui.Japan 1 000 kV UHV transmission technology[J].High Voltage Technology,1998,24(2):102-105(in Chinese).
|
[8] | 朱德恒,严璋.高电压绝缘[M].北京:清华大学出版社,1996:156-177.
|
[9] | 邱昌容,曹晓珑.电气绝缘测试技术[M].北京:机械工业出版社,2002:148-165.
|
[10] | GB/T11022—1999,高压开关设备和控制设备的共用技术要求[S].
|
[11] | DL/T 593—2006,高压开关设备和控制设备的共用技术要求[S].
|
[12] | DL/T 402—2007,高压交流断路器订货技术条件[S].
|
[13] | GB 1984—2003,高压交流断路器[S].
|
[14] | IEC 60694—1996,高压开关设备和控制设备标准共用技术要求[S].
|
[15] | IEC 62271-100—2001,高压开关设备和控制设备—第100部分:高压交流断路器[S].
|
[16] | 李建基.高压开关设备实用技术[M].北京:中国电力出版社,2005:38-58.
|
[17] | 黎斌.SF6高压电器设计[M].北京:中国机械工业出版社,2003:36-40.
|
[18] | 徐国政,张节容,钱家骊,等.高压断路器原理和应用[M].北京:清华大学出版社,2000:128-176.
|
[19] | 苑顺,王承玉,海涛,等.配电网自动化开关设备[M].北京:中国电力出版社,2007:22-62.
|
[20] | 王章启,郭贤珊.高压断路器开断参数的监测与记录[J].电网技术,1996,20(10):129-133.
|
[21] | Wang Zhangqi,Guo Xianshan.Monitoring and recording the breaking parameters for high-voltage circuit breaker[J].Power System Technology,1996,20(10):129-133(in Chinese).
|
[22] | 罗学琛.SF6气体绝缘全封闭组合电器GIS[M].北京:中国电力出版社,1998:340-364.
|
[23] | 贺虎,韩书谟,邓德良.1100kV GIS设备现场交接试验的重点及难点[J].电网技术,2009,33(10):31-33.
|
[24] | He Hu,Han Shumo,Deng Deliang.Key problems and difficulty in field handover test of 1100 kV GIS [J].Power System Technology,2009,33(10):31-33(in Chinese).
|
[25] | 贺虎,韩书谟,王延豪.交流特高压晋东南变电站1100kV GIS设备的现场安装管理[J].电网技术,2009,33(4):11-16.
|
[26] | He Hu,Han Shumo,Wang Yanhao.Worksite installation management of 1 100kV GIS for UHVAC southeast-Shanxi substation[J].Power System Technology,2009,33(4):11-16(in Chinese).
|
[27] | 曹荣江,顾霓鸿.高压交流断路器的运行条件[M].北京:北京工业大学出版社,1997:51-75.
|