Shu Yinbiao,Liu Zehong,Yuan Jun,et al.A survey on demonstration of UHV power transmission by State Grid Corporation of China in the year of 2005[J].Power System Technology,2006,30(5):1-12(in Chinese).
Shu Yinbiao,Liu Zehong,Gao Liying,et al.A preliminary exploration for design of ±800 kV UHVDC project with transmission capacity of 6400 MW[J].Power System Technology,2006,30(1):1-8(in Chinese).
Shi Yan,Han Wei,Zhang Min,et al.A preliminary scheme for control and protection system of UHVDC project[J].Power System Technology,2007,31(1):1-7(in Chinese).
Nordstr?m B,Tyskhagen H.The procurement on the converter station equipment for Three Gorges-Shanghai ±500kV DC transmission project[Z].Ludvika,Sweden:ABB Corporation,2004.
[16]
IEC 919-3-1999,Performance of high-voltage dc (HVDC) system part1:steady-state conditions[S].
[17]
IEC 919-3-1999,Performance of high-voltage dc (HVDC) systems part2:faults and switching[S].
[18]
IEC 919-3-1999,Performance of high-voltage dc (HVDC) systems part3:dynamic conditions[S].
Ren Zhen,He Changwei,Gao Mingzhen.Characteristic analysis of capacitor commutated converter in HVDC system(I):mechanism and characteristic[J].Proceedings of the CSEE,1999,19(3):55-58(in Chinese).