[1] | 舒印彪,张文亮.特高压输电若干关键技术研究[J].中国电机工程学报,2007,27(31):1-6.
|
[2] | Shu Yinbiao,Zhang Wenliang.Research of key technologies for UHV transmission[J].Proceedings of the CSEE,2007,27(31):1-6(in Chinese).
|
[3] | 舒印彪,张文亮,周孝信,等.特高压同步电网安全性评估[J].中国电机工程学报,2007,27(34):l-6.
|
[4] | Shu Yinbiao,Zhang Wenliang,Zhou Xiaoxin,et al.Security evaluation of UHV synchronized power grid[J].Proceedings of the CSEE,2007,27(34):1-6(in Chinese).
|
[5] | 梁旭明,张国威,徐玲玲,等.1000kV交流特高压试验示范工程的生产准备工作与实施[J].电网技术,2008,32(5):12-16.
|
[6] | Liang Xuming,Zhang Guowei,Xu Lingling,et al.Investigation and implementation of production preparation for 1000kV AC test and pilot project[J].Power System Technology,2008,32(5):12-16(in Chinese).
|
[7] | 赵良,郭强,覃琴,等.特高压同步电网稳定特性分析[J].中国电机工程学报,2008,28(34):47-51.
|
[8] | Zhao Liang,Guo Qiang,Qin Qin,et al.Analysis on stability characteristics of UHV synchronized power grid[J].Proceedings of the CSEE,2008,28(34):47-51(in Chinese).
|
[9] | 叶俭,李明节,周济,等.特高压交流试验示范工程无功电压控制策略研究[J].中国电机工程学报,2008,29(22):25-29.
|
[10] | Ye Jian,Li Mingjie,Zhou Ji,et al.Research on reactive power and voltage control strategies for the UHV AC demonstration project[J].Proceedings of the CSEE,2008,29(22):25-29(in Chinese).
|
[11] | 易俊,孙华东,郭强,等.大型电源基地接入特高压输电系统方式研究[J].电网技术,2009,33(16):14-19.
|
[12] | Yi Jun,Sun Huadong,Guo Qiang,et al.Research on modes of connecting bulk power bases to power grids by UHV transmission systems[J].Power System Technology,2009,33(16):14-19(in Chinese).
|
[13] | 高林,戴义平,马庆中,等.特高压线路解列后区域互联电网一次调频稳定性研究[J].电网技术,2009,33(20):27-32.
|
[14] | Gao Lin ,Dai Yiping,Ma Qingzhong,et al.Research on stability of primary frequency regulation of interconnected power system after trip-out of ultra-high voltage transmission line[J].Power System Technology,2009,33(20):27-32(in Chinese).
|
[15] | 沈国辉,刘金波,陈光,等.特高压调度运行支持系统关键技术[J].电网技术,2009,33(20):33-37.
|
[16] | Shen Guohui,Liu Jinbo,Chen Guang,et al.Key technologies for UHV dispatching operation support system[J].Power System Technology,2009,33(20):33-37(in Chinese).
|
[17] | 尚学伟,李立新,卓峻峰,等.特高压交流示范工程投运后华北电网AGC策略的改进[J].电网技术,2010,34(9):31-34.
|
[18] | Shang Xuewei,Li Lixin,Zhuo Junfeng,et al.Improvement of strategies of AGC in north China power grid after UHVAC pilot project operation[J].Power System Technology,2010,34(9):31-34(in Chinese).
|
[19] | 张健,张文朝,肖扬,等.特高压交流示范工程系统调试仿真研究及验证分析[J].电网技术,2009,33(19):29-32.
|
[20] | Zhang Jian,Zhang Wenchao,Xiao Yang,et a1.Simulation and verification of system commissioning test for l000 kV AC pilot project[J].Power System Technology,2009,33(19):29-32(in Chinese).
|
[21] | 张伟,常青,张剑云.特高压互联系统联网初期动态稳定特性及控制措施[J].中国电机工程学报,2009,29(21):19-24.
|
[22] | Zhang Wei,Chang Qing,Zhang Jianyun.Dynamic stability characteristic and control strategies of the UHV system in initial operation period[J].Proceedings of the CSEE,2009,29(21):19-24(in Chinese).
|
[23] | 刘辉,吴涛,李群炬,等.特高压交流示范工程功率摆动机制分析[J].中国电力,2010,43(7):9-13.
|
[24] | Liu Hui,Wu Tao,Li Qunju,et al.Power swing mechanism analysis of UHV AC pilot project[J].Electric Power,2010,43(7):9-13(in Chinese).
|
[25] | 汤涌,孙华东,易俊,等.两大区互联系统交流联络线功率波动机制与峰值计算[J].中国电机工程学报,2010,30(19):1-6.
|
[26] | Tang Yong,Sun Huadong,Yi Jun,et al.AC tie-line power fluctuation mechanism and peak value calculation for two-area interconnected power systems[J].Proceedings of the CSEE,2010,30(19):1-6(in Chinese).
|
[27] | Anderson P M,Fouad A A.Power system control and stability[M].AMES,IOWA:The Iowa State University Press,1977:69-79.
|
[28] | 戴忠达.自动控制理论基础[M].北京:清华大学出版社,1991:186-189.
|