Cao Shiguang,Yang Yihuan,Yu Erkeng.Power outage cost and its estimation[J].Power System Technology,1996,20(11):72-74(in Chinese).
[4]
Gwacker R B.Customer cost of electric service[J].Proceeding of the IEEE,1989,77(6):919-930.
[5]
Kariuki K K,Allan R N.Assessment of customer outage costs due to electric service interruptions:residential sector[J].IEEE Proceedings of Generation Transmission Distribution,1996,142(2):163-170.
[6]
张焰.电网规划中的模糊可靠性评估方法[J].中国电机工程学报,2000,20(11):77-80.
[7]
Zhang Yan.The evaluation method of fuzzy reliability in electric power network planning[J].Proceedings of the CSEE,2000,20(11):77-80(in Chinese).
[8]
Allan R N,Billinton R.Bibliography on the application of probability methods in power systems reliability evaluation (1992—1996) [J].IEEE Trans on PAS,1999,14(1):51-57.
[9]
康重庆,陈启鑫,夏清.低碳电力技术的研究展望[J].电网技术,2009,33(2):1-7.
[10]
Kang Chongqing,Chen Qixin,Xia Qing.Prospects of low-carbon electricity[J].Power System Technology,2009,33(2):1-7(in Chinese).
Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
[13]
徐永禧.美国对供电扰动造成经济损失的研究[J].国际电力,2005,9(5):19.
[14]
侯义明,李蕊.重要电力用户应急供电保障技术研究报告[R].北京:中国电力科学研究院,2009.
[15]
陈晓,城市电网可靠性与计划的经济性研究[D].云南:昆明理工大学,2003.
[16]
Allan R N,Billinton R.Bibliography on the application of probability methods in power systems reliability evaluation (1992—1996)[J].IEEE Transactions on PAS,1999,14(1):51-57.
[17]
Allan R N,Billinton R.Bibliography on the application of probability methods in power systems reliability evaluation(1987—1991) [J].IEEE Transactions on PAS,1994,9(1):41-48.
[18]
Tollefson G,Billinton R.Comprehensive bibliography on reliability worth and electrical service consumer interruption costs[J].IEEE Trans on PAS,1991,6(4):1508-1513.