全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
电网技术  2007 

中国用户停电损失调查方法

, PP. 54-58

Keywords: 可靠性,经济性,停电损失函数,基础数据统计

Full-Text   Cite this paper   Add to My Lib

Abstract:

用户停电损失模型是市场环境下最优可靠性研究的基础,在电力系统规划和运行中有着广泛的应用。文章提出了一套适合我国特点的用户停电损失调查方法——问卷调查法,并介绍了开展问卷调查工作的3个重要步骤。认为用户进行调查应将其分为居民用户与非居民用户2大类,针对其不同特点,对问卷的具体内容做了深入探讨,并提出了可靠性预防费用、可靠性溢价费用、可靠性折价费用等概念。

References

[1]  Billinton R,Allan R.Reliability evaluation of power systems [M].New York and London: Plenum Press,1996.
[2]  刘海涛,程林,孙元章,等.交直流系统可靠性评估[J].电网技术,2004,28(23):27-31.
[3]  Liu Haitao,Cheng Lin,Sun Yuanzhang,et al.Reliability evaluation of hybrid AC/DC power systems[J].Power System Technology, 2004,28(23):27-31(in Chinese).
[4]  陈永进,任震.模型组合及其在直流输电系统可靠性评估中的应用[J].电网技术,2004,28(13):18-22.
[5]  Chen Yongjin,Ren Zhen.Models combination and its application in reliability evaluation for HVDC systems[J].Power System Technology,2004,28(13):18-22(in Chinese).
[6]  张保会,王立永,谭伦农,等.市场环境下电力系统安全可靠性措施的经济当量[J].中国电机工程学报,2005,25(24):41-46.
[7]  Zhang Baohui,Wang Liyong,Tan Lunnong,et al.Economic equivalent of the power system security and reliability measure in power market environment[J].Proceedings of the CSEE,2005, 25(24):41-46(in Chinese).
[8]  张保会,谭伦农.电力市场环境下后备保护动作的经济性评估及责任承担[J].中国电机工程学报,2003,23(3):43-47.
[9]  Zhang Baohui,Tan Lunnong.The economic evaluation and responsibility assumption of back-up protection in power market environment[J].Proceedings of the CSEE,2003,23(3):43-47(in Chinese).
[10]  谭伦农,张保会.市场环境下的事故备用容量[J].中国电机工程学报,2002,22(11):54-58.
[11]  Tan Lunnong,Zhang Baohui.Reserve capacity for failure in power market environment[J].Proceedings of the CSEE,2002,22(11):54-58(in Chinese).
[12]  张保会,王立永,谭伦农,等.计及风险的市场环境下电力系统安全可靠性研究[J].电网技术,2005,29(3):44-49.
[13]  Zhang Baohui,Wang Liyong,Tan Lunnong,et al.Research of power
[14]  system security and reliability considering risk under environment of
[15]  electricity market[J].Power System Technology,2005,29(3):44-49(in Chinese).
[16]  宋云亭,周双喜,鲁宗相,等.基于GA的发输电合成系统最优可靠性计算新方法[J].电网技术,2004,28(15):25-30.
[17]  Song Yunting,Zhou Shuangxi,Lu Zongxiang,et al.A new calculation method for optimal reliability indices of composite power system using GA [J].Power System Technology,2004,28(15):25-30(in Chinese).
[18]  Wacker G,Wojczynski E,Billinton R.Interruption cost methodology and results – A Canadian commercial and small industry survey[J].IEEE Transactions on Power Apparatus and System, 1984,103(2):437-444.
[19]  Tollefson G,Billinton R,Wacker G.Comprehensive bibliography on electric service interruption costs:1980-1990 [J].IEEE Trans on Power Apparatus and System,1991,6(4):1508-1514.
[20]  郭永基.电力系统可靠性分析[M].北京:清华大学出版社,2003.
[21]  Billinton R,Wacker G,Wojczynski E.Comprehensive bibliography on electric service interruption costs[R].Final Report for NSERC Strategic Grant STR0045005,1993.
[22]  Billinton R,Wacker G,Tollesfon G.Assessment of reliability worth in electric power systems in Canada[R].Final Report for NSERC Strategic Grant STR0045005,1993.
[23]  Tollefson G,Billinton R,Wacker G.A Candian customer survey to assess power system reliability worth [J].IEEE Trans on Power Systems,1994,9(1):443-450.
[24]  Billinton R,Pandey M.Reliability worth assessment in a developing country-residential survey results[J].IEEE Trans on Power Systems,1999,14(4):1226-1231.
[25]  Pandey M,Billinton R.Reliability worth assessment in a developing country-commercial and industrial survey results[J].IEEE Trans on Power Systems,1999,14(4):1232-1237.
[26]  Chowdhury A,Mielnik T,Lawton L.System reliability worth assessment at a Midwest utility-survey results for residential customers[C].8th International Conference on Probability Applied to Power Systems,2004:763-768.
[27]  Chowdhury A,Mielnik T,Lawton L.System reliability worth assessment at a Midwest utility-survey results for industrial, commercial and institutional customers[C].8th International Conference on Probability Applied to Power Systems,2004:756-762.
[28]  Wacker G,Billinton R.Customer cost of electric interruptions [J].IEEE Proceedings,1989,77(6):919-930.
[29]  Chowdhury A,Mielnik T,Lawton L.System reliability worth assessment using the customer survey approach [C].IEEE Industry Applications Conference,2004:2162 -2167.
[30]  何大愚.工商业电力系统的可靠性及其电力市场事故[J].电网技术,2000,24(10):22-26.
[31]  He Dayu.Reliability and electricity market accidents in an industrial and commercial power system[J].Power System Technology,2000,24(10):22-26(in Chinese).
[32]  张鹏,王守相.电力系统可靠性经济评估的区间分析方法[J].中国电机工程学报,2004,24(2):71-77.
[33]  Zhang Peng,Wang Shouxiang.Novel interval methods in power system reliability economics[J].Proceedings of the CSEE,2004,24(2):71-77(in Chinese).
[34]  丁明.发输电系统可靠性分析软件综述[J].电网技术,2002,26(1):51-54.
[35]  Ding Ming.A survey of composite generation and transmission reliability analysis software package[J].Power System Technology, 2002,26(1):51-54(in Chinese).
[36]  李文沅,周家启,卢继平,等.在输电服务价格设计中计入可靠性分量[J].中国电机工程学报,2006,26(13):43-49.
[37]  Li Wenyuan, Zhou Jiaqi, Lu Jiping, et al. Incorporating reliability component in transmission service rate design [J].Proceedings of the CSEE,2006,26(13):43-49(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133