Dehghanian P,Fotuhi-Firuzabad M,Aminifar F,et al.A comprehensive scheme for reliability centered maintenance in power distribution systems,part I:methodology[J].IEEE Transactions on Power Delivery,2013,28(2):761-770.
[2]
Dehghanian P,Fotuhi-Firuzabad M,Aminifar F,et al.A comprehensive scheme for reliability centered maintenance in power distribution systems,part II:numerical analysis[J].IEEE Transactions on Power Delivery,2013,28(2):771-778.
[3]
王浩浩,管霖,吴熳红.配电网可靠性评估中预安排停电的实用模型[J].电力系统自动化,2011,35(23):59-63.Wang Haohao,Guan Lin,Wu Manhong.Mathematical model of scheduled outage in reliability assessment of distribution network[J].Automation of Electric Power Systems,2011,35(23):59-63(in Chinese).
[4]
Brown R.Electric power distribution reliability[M].2nd Edition.New York:Taylor & Francis Group,2009:435-436.
[5]
宋云亭,张东霞,吴俊玲,等.国内外城市配电网供电可靠性对比分析[J].电网技术,2008,32(23):13-18.Song Yunting,Zhang Dongxia,Wu Junling,et al.Comparison and analysis on power supply reliability of urban power distribution network at home and abroad[J].Power System Technology,2008,32(23):13-18(in Chinese).
[6]
赵华,王主丁,谢开贵,等.中压配电网可靠性评估方法的比较研究[J].电网技术,2013,37(11):3295-3302.Zhao Hua,Wang Zhuding,XieKaigui,et al.Comparative study on reliability assessment methods for medium voltage distribution network[J].Power System Technology,2013,37(11):3295-3302 (in Chinese).
[7]
Deb K,Pratap A,Agarwal S,et al.A fast and elitist multiobjective genetic algorithm NSGA-II[J].Evolutionary Computation,2002,6(2):182-197.
[8]
Messac A,Ismail-Yahaya A,Mattson C A.The normalized normal constraint method for generating the Pareto frontier[J].Structural and Multidisciplinary Optimization,2003,25(2):86-98.
[9]
Abido M A.Multiobjective evolutionary algorithms for electric power dispatch problem[J].IEEE Transactions on Evolutionary Computation,2006,10(3):315-229.
[10]
Billinton R,Jonnavithula S.A test system for teaching overall power system reliability assessment[J].IEEE Transactions on Power System,1996,11(4):1670-1676.
[11]
广东电网公司.设备状态评价与风险评估技术导则[R].2010.
[12]
李黎,张登,谢龙君,等.采用关联规则综合分析和变权重系数的电力变压器状态评估方法[J].中国电机工程学报,2013,33(24):152-159.Li Li,Zhang Deng,XieLongjun,et al.A condition assessment method of power transformers based on association rules and variable weight coefficients[J].Proceedings of the CSEE,2013,33(24):152-159(in Chinese).
[13]
Song Lin.NGPM:A NSGA-II program in Matlab v1.4[DB/OL].2011-04-23
邱生敏,王浩浩,管霖.考虑复杂转供和预安排停电的配电网可靠性评估[J].电网技术,2011,35(5):121-126.QiuShengmin,Wang Haohao,Guan Lin.An improved algorithm for reliability assessment of distribution network considering complex load transfer and scheduled outage[J].Power System Technology,2011,35(5):121-126(in Chinese).
[16]
余贻鑫,栾文鹏.智能电网述评[J].中国电机工程学报,2009,29(34):1-8.Yu Yixin,Luan Wenpeng.Smart grid and its implementations[J].Proceedings of the CSEE,2009,29(34):1-8(in Chinese).
[17]
张大波,李文沅,熊小伏.基于状态检测的多目标双层优化待检修架空线选择模型[J].电力系统自动化,2013,37(2):23-27.Zhang Dabo,Li Wenyuan,XiongXiaofu.Multi-objective two-layer optimization model for overhead line maintenance selection based on condition monitoring[J].Automation of Electric Power Systems,2013,37(2):23-27(in Chinese).
[18]
黄弦超,舒隽,张粒子,等.免疫禁忌混合智能优化算法在配电网检修优化中的应用[J].中国电机工程学报,2004,24(11):96-100.Huang Xianchao,Shu Jun,Zhang Lizi,et al.Distribution maintenance scheduling using an intelligent optimal approach mixed with immune algorithm and Tabu search[J].Proceedings of the CSEE,2004,24(11):96-100(in Chinese).
[19]
黄弦超,张粒子,舒隽,等.配电网检修计划优化模型[J].电力系统自动化,2007,31(1):33-37.Huang Xianchao,Zhang Lizi,Shu Jun,et al.Maintenance schedule optimization model in distribution systems[J].Automation of Electric Power Systems,2007,31(1):33-37(in Chinese).
[20]
郇嘉嘉,王钢,李海锋,等.多目标决策分析的电网综合停电管理模型[J].电网技术,2013,37(10):2802-2807.HuanJiajia,Wang Gang,Li Haifeng,et al.A comprehensive outage management model based on multi-objective decision analysis[J].Power System Technology,2013,37(10):2802-2807(in Chinese).
[21]
陈志强,陈亮,赵洪山.基于分支界限法的配电线路检修优化分析[J].电网技术,2009,33(12):83-87.Chen Zhiqiang,Chen Liang,Zhao Hongshan.Analysis on maintenance optimization of distribution lines based on branch-and-bound algorithm[J].Power System Technology,2009,33(12):83-87(in Chinese).