钱冠军,王晓瑜,丁一正,等.500 kV线路直击雷典型事故调查研究[J].高电压技术,1997,23(2):72-83.Qian Guanjun,Wang Xiaoyu,Ding Yizheng,et al.Investigation of typical direct lightning strike incidents on 500 kV lines[J].High Voltage Engineering,1997,23(2):72-83(in Chinese).
[2]
李培国.国外对特高压输电线路雷击跳闸原因的一个新观点[J].电网技术,2000,24(7):63-65.Li Peiguo.A new viewpoint about lightning trip-out of UHV transmission lines[J].Power System Technology,2000,24(7):63-65(in Chinese).
[3]
Brown G W,Whitehead E R.Field and analytical studies of transmission line shielding part II[J].IEEE Trans on Power Apparatus and System,1969,88(5):617-626.
[4]
李瑞芳,吴广宁,曹晓斌,等.山区输电线路雷电绕击跳闸率的计算[J].电网技术,2010,34(12):142-146.Li Ruifang,Wu Guangning,Cao Xiaobin,et al.Calculation of shielding failure trip-out for transmission lines in mountain areas[J].Power System Technology,2010,34(12):142-146(in Chinese).
[5]
Dellera L,Garbagnati E.Lightning stroke simulation by means of the leader progression model,part I:Description of the model and evaluation of the exposure of free-standing structures[J].IEEE Trans on Power Delivery,1990,5(4):2009-2017.
[6]
Dellera L,Garbagnati E.Lightning stroke simulation by means of the leader progression model,part II:Exposure and shielding failure evaluation of overhead lines with assessment of application graphs[J].IEEE Trans on Power Delivery,1990,5(4):2023-2029.
[7]
Farouk A M,Rizk.Modeling of transmission line exposure to direct lighting strokes[J].IEEE Trans on Power Delivery,1990,5(4):1983-1997.
[8]
王晓瑜. 雷电屏蔽性能的模拟试验和分析模型的研究[J].高电压技术,1994,20(2):48-54.Wang Xiaoyu.Simulation test and analysis model of lightning shielding[J].High Voltage Engineering,1994,20(2):48-54(in Chinese).
[9]
王羽,文习山,蓝磊,等.模型比例对架空输电线路雷电屏蔽模拟试验的影响[J].高电压技术,2013,39(2):443-449.Wang Yu,Wen Xishan,Lan Lei,et al.Effects of model scale on lightning shielding simulation test of overvoltage transmission lines10 .High Voltage Engineering,2013,39(2):443-449(in Chinese).
[10]
安韵竹,蓝磊,文习山,等.大尺寸特高压输电线路雷电屏蔽性能模拟试验影响因素[J].电网技术,2014,38(5):1385-1389.An Yunzhu,Lan Lei,Wen Xishan,et al.Impacting factors of large-sized model test for lightning shielding performance of UHV transmission lines[J].Power System Technology,2014,38(5):1385-1389(in Chinese).
[11]
郑家松,李广福,季征南,等.山区500 kV输电线路雷电屏蔽性能模型试验研究[J].高压电器,2009,45(5):119-122.Zheng Jiasong,Li Guangfu,Ji Zhengnan,et al.Small-scale model experimental study on lightning shielding performance of 500 kV transmission lines in mountain area[J].High Voltage Apparatus,2009,45(5):119-122(in Chinese).
[12]
蓝磊,邓维,黄文武,等.平原地区500 kV输电线路雷电屏蔽性能的模型试验研究[J].电网技术,2006,30(9):72-76.Lan Lei,Deng Wei,Huang Wenwu,et al.Small-scale model experimental study on lightning shielding performance of 500 kV transmission lines in plain area[J].Power System Technology,2006,30(9):72-76(in Chinese).
[13]
Bazelyan E M,Raizer Y P.Lightning physics and lightning protection[M].London:Academic Press,2000:90-136.
[14]
王羽,李志军,戴敏,等.长空气间隙负极性操作冲击放电特性研究(I)—试验研究[J]. 中国电机工程学报,2014,34(21) :3534-3540.Wang Yu,Li Zhijun,Dai Min,et al.Research on typical long air gaps with negative switching impulses(II) - Experiments[J].Proceedings of the CSEE,2014,34(21) :3534-3540 (in Chinese)
[15]
安韵竹,戴敏,李志军,等.长空气间隙负极性操作冲击放电特性研究(II)-间隙系数[J].中国电机工程学报,2014,34(24) :4145-4151.An Yunzhu,Dai Min,Li Zhijun,et al.Research on typical long air gaps with negative switching impulses(II) - gap factor[J].Proceedings of the CSEE,2014,34(24) :4145-4151(in Chinese).