Wen J,Zheng Y,Donghan F.A review on reliability assessment for wind power[J].Renewable and Sustainable Energy Reviews,2009,13(9):2485-2494.
[3]
Billinton R,Gao Y,Karki R.Composite system adequacy assessment incorporating large-scale wind energy conversion systems considering wind speed correlation[J].IEEE Transactions on Power System,2009,24(3):1375-1382.
[4]
Wangdee W,Billinton R.Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment[J].IEEE Transactions on Energy Conversion,2006,21(3):734-741.
[5]
秦志龙,李文沅,熊小伏.考虑风速相关性的发输电系统可靠性评估[J].电力系统自动化,2013,37(16):47-52. Qin Zhilong,Li Wenyuan,Xiong Xiaofu.Reliability assessment of composite generation and transmission system considering wind speed correlation[J].Automation of Electric Power Systems,2013,37(16):47-52(in Chinese).
[6]
Port´e-Age F,Wu Y T,Chen C H.A numerical study of the effects of wind direction on turbine wakes and power losses in a large wind farm[J].Energies,2013,6(10):5297-5313.
[7]
Kim H,Singh C,Sprintson A.Simulation and estimation of reliability in a wind farm considering the wake effect[J].IEEE Transactions on Sustainable Energy,2012,3(2):274-282.
[8]
宗炫君,袁越,张新松,等.基于Well_being理论的风储混合电站可靠性分析[J].电力系统自动化,2013,37(17):17-22. Zong Xuanjun,Yuan Yue,Zhang Xinsong,et al.Analysis on hybrid wind/energy storage power station reliability based on the well-being theory[J].Automation of Electric Power Systems,2013,37(17):17-22(in Chinese).
[9]
Wu C X,Chung C Y,Wen F S,et al.Reliability cost evaluation with PEV and wind generation system[J].IEEE Transactions on Sustainable Energy,2014,5(1):273-281.
[10]
Chen H J,Wang J X,Zhang Y.Economic dispatch of hydro-thermal power system with large-scale wind power penetration[C]//IEEE Asia-Pacific Power and Energy Engineering Conference.Shanghai,China:IEEE,2012:1-4.
[11]
葛晓琳,舒隽,张粒子.考虑检修计划的中长期水火电联合优化调度方法[J].中国电机工程学报,2012,32(13):36-43. Ge Xiaolin,Shu Jun,Zhang Lizi.Mid-long term optimal dispatching method of hydro-thermal power system considering scheduled maintenance[J].Proceedings of the CSEE,2012,32(13):36-43(in Chinese).
[12]
郭壮志,吴杰康,孔繁镍,等.梯级水电站水库蓄能利用最大化的长期优化调度[J].中国电机工程学报,2010,30(1):20-26. Guo Zhuangzhi,Wu Jiekang,Kong Fannie,et al.Long-term optimization scheduling based on maximal storage energy exploitation of cascaded hydro-plant reservoirs[J].Proceedings of the CSEE,2010,30(1):20-26(in Chinese).
[13]
González C,Juan J,Mira J,et al.Reliability analysis for systems with large hydro resources in a deregulated electric power market[J].IEEE Transactions on Power System,2005,20(1):90-95.
[14]
Lopes V S,Borges C L T.Impact of the combined integration of wind generation and small hydropower plants on the system reliability[DB/OL].IEEE Transactions on Sustainable Energy,2014-7-29[2014-10-15].http://ieeexplore.ieee.org/Xplore/home.jsp.
[15]
Karki R,Hu P,Billinton R.Reliability evaluation considering wind and hydro power coordination[J].IEEE Transactions on Power System,2010,25(2):685-693.
[16]
王海超,鲁宗相,周双喜.风电场发电容量可信度研究[J].中国电机工程学报,2005,25(10):103-106. Wang Haichao,Lu Zongxiang,Zhou Shuangxi.Researach on the capacity credit of wind energy resources[J].Proceedings of the CSEE,2005,25(10):103-106(in Chinese).
[17]
Feijoo A E,Cidrab J,Dornelas J L G.Wind speed simulation in wind farms for steady-state security assessment of electrical power systems[J].IEEE Transactions on Energy Conversion,1999,14(4):1582-1588.
[18]
梁双,胡学浩,张东霞,等.考虑风速变化特性的风电容量可信度评估方法[J].中国电机工程学报,2013,33(10):18-26. Liang Shuang,Hu Xuehao,Zhang Dongxia,et al.Capacity credit evaluation of wind generation considering wind speed variation characteristics[J].Proceedings of the CSEE,2013,33(10):18-26(in Chinese).
[19]
丁明,张静,李生虎.基于序贯蒙特卡罗仿真的配电网可靠性评估模型[J].电网技术,2004,28(3):38-42. Ding Ming,Zhang Jing,Li Shenghu.A sequential Monte-Carlo simulation based reliability evaluation model for distribution network[J].Power System Technology,2004,28(3):38-42(in Chinese).
[20]
于晗,钟志勇,黄杰波,等.采用拉丁超立方采样的电力系统概率潮流计算方法[J].电力系统自动化,2009,33(21):32-35. Yu Han,Zhong Zhiyong,Huang Jiebo,et al.A probabilistic load flow calculation method with latin hypercube sampling[J].Automation of Electric Power Systems,2009,33(21):32-35(in Chinese).
[21]
吴义纯,丁明,李生虎.风电场对发输电系统可靠性影响的评估[J].电工技术学报,2004,19(11):72-76. Wu Yichun,Ding Ming,Li Shenghu.Reliability assessment of wind farms in generation and transmission systems[J].Transaction of China Electrotechnical Society,2004,19(11):72-76(in Chinese).
[22]
曲翀,王秀丽,谢绍宇,等.不同风速模型和可靠性指标对风电可信容量评估的影响[J].电网技术,2013,37(10):2896-2903. Qu Chong,Wang Xiuli,Xie Shaoyu,et al.Impacts of different wind speed models and reliability indices on capacity credit evaluation of wind power[J].Power System Technology,2013,37(10):2896-2903(in Chinese).
[23]
衣立东,朱敏奕,魏磊,等.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132. Yi Lidong,Zhu Minyi,Wei Lei,et al.A computing method of peak load regulation ability of northwest china power grid connected with large-scale wind farms[J].Power System Technology,2010,34(2):129-132(in Chinese).