吴杰康,郭壮志,秦砺寒,等.基于连续线性规划的梯级水电站优化调度[J].电网技术,2009,33(8):24-29.Wu Jiekang,Guo Zhuangzhi,Qin Lihan,et al.Successive linear programming based optimal scheduling of cascade hydropower station[J].Power System Technology,2009,33(8):24-29(in Chinese).
[2]
Ge X L,Zhang L Z,Shu J,et al.Short-term hydropower optimal scheduling considering the optimization of water time delay[J].Electric Power Systems Research,2014(110):188-197.
[3]
郝永怀,杨侃,周冉,等.三峡梯级短期优化调度大系统分解协调法的应用[J].河海大学学报:自然科学版,2012,40(1):70-75.HaoYonghuai,Yang Kan,Zhou Ran,et al.Application of large - scale system decomposition-coordination method to short-term optimal operation of Three Gorges cascade hydropower stations[J].Journal of Hehai University:Natural Sciences,2012,40(1):70-75 (in Chinese).
[4]
刘攀,郭生练,雒征,等.求解水库优化调度问题的动态规划-遗传算法[J].武汉大学学报:工学版,2007,40(5):1-6.Liu Pan,Guo Shenglian,Luo Zheng,et al.Optimization of reservoir operation by using dynamic programming-genetic algorithm[J].Engineering Journal of Wuhan University,2007,40(5):1-6(in Chinese).
[5]
梅亚东,熊莹,陈立华.梯级水库综合利用调度的动态规划方法研究[J].水力发电学报,2007,26(2):1-4.Mei Yadong,Xiong Ying,Chen Lihua.A dynamic programming method for the multi-purpose operation of cascade reservoirs[J].Journal of Hydroelectric Engineering,2007,26(2):1-4 (in Chinese).
[6]
蒋志强,纪昌明,孙平,等.多层嵌套动态规划并行算法在梯级水库优化调度中的应用[J].中国农村水利水电,2014(9):70-75.Jiang Zhiqiang,Ji Changming,Sun Ping,et al.The application of multi-layer Nested parallel dynamic programming algorithm in cascade reservoirs operation optimization[J].China Rural Water and Hydropower,2014(9):70-75 (in Chinese).
[7]
Wardlaw R,Sharif M.Evaluation of genetic algorithms for optimal reservoir system operation[J].Journal of Water Resources Planning and Management,1999,125(1):25-33.
[8]
武新宇,程春田,廖胜利,等.两阶段粒子群算法在水电站群优化调度中的应用[J].电网技术,2006,30(20):25-28.Wu Xinyu,Cheng Chuntian,Liao Shengli,et al.Application of two-stage particle swarm optimization algorithm in optimized dispatching of hydropower station group[J].Power System Technology,2006,30(20):25-28 (in Chinese).
[9]
张智晟,董存,吴新振.基于量子粒子群优化算法的水电系统经济运行[J].电网技术,2009,33(18):68-72.Zhang Zhisheng,Dong Cun,Wu Xinzhen.Economic operation of hydropower system based on quantum particle swarm optimization algorithm[J].Power System Technology,2009,33(18):68-72(in Chinese).
[10]
许银山,梅亚东,魏婧,等.梯级水库群长期优化调度的逐次优化-遗传算法[J].中国农村水利水电,2008(9):25-27.Xu Yinshan,Mei Yadong,Wei Jing,et al.Long-time reservoir optimal operation based on progressive optimality algorithm-genetic algorithm[J].China Rural Water and Hydropower,2008(9):25-27(in Chinese).
[11]
周佳,马光文,张志刚.基于改进POA算法的雅砻江梯级水电站群中长期优化调度研究[J].水力发电学报,2010,29(3):18-22.Zhou Jia,Ma Guangwen,Zhang Zhigang.Study on the mid-long term optimal dispatching of cascaded hydropower stations on Yalong river based on POA modified adaptive algorithm[J].Journal of Hydroelectric Engineering,2010,29(3):18-22 (in Chinese).
[12]
冯仲恺,廖胜利,程春田,等.库群长期优化调度的正交逐步优化算法[J].水利学报,2014,45(8):903-911.Feng Zhongkai,Liao Shengli,Cheng Chuntian,et al.Orthogonal progressive optimality algorithm for long-term optimal operation of multi-reservoir system[J].Journal of Hydraulic Engineering,2014,45(8):903-911 (in Chinese).
[13]
李义,李承军,周建中.POA-DPSA混合算法在短期优化调度中的应用[J].水电能源科学,2004,22(1):37-39.Li Yi,Li Chengjun,Zhou Jianzhong.POA-DPSA algorithm for short-term hydro scheduling of cascaded hydroelectric stations[J].Water Resources and Power,2004,22(1):37-39(in Chinese).
[14]
许银山,梅亚东,杨娜,等.大规模混联水库群长期优化调度[J].水电自动化与大坝监测,2010,34(4):58-63.Xu Yinshan,Mei Yadong,Yang Na,et al.Optimal operation method of large-scale multi-reservoir group[J].Hydro Power Automation and Dam Monitoring,2010,34(4):58-63(in Chinese).
[15]
范春起.约束坐标轮换法的修正算法[J].河北科技大学学报,1998,19(4):74-78.Fan Chunqi.The amend method of the constrained coordinate supersede technic[J].Journal of Hebei University of Science and Technology,1998,19(4):74-78 (in Chinese).
[16]
黄草,王忠静,李书飞,等.长江上游水库群多目标优化调度模型及应用研究Ⅰ:模型原理及求解[J].水利学报,2014(9):1009-1018.Huang Cao,Wang Zhongjing,Li Shufei,et al.A multi-reservoir operation optimization model and application in the upper Yangtze River Basin I.Principle and solution of the model[J].Journal of Hydraulic Engineering,2014(9):1009-1018 (in Chinese).
[17]
廖胜利,程春田,王静,等.中期火电机组开机优化的改进逐步优化算法[J].电力系统自动化,2010,34(17):83-88.Liao Shengli,Cheng Chuntian,Wang Jing,et al.An improved progressive optimality algorithm for medium-term thermal unit commitment optimization[J].Automation of Electric Power Systems,2010,34(17):83-88 (in Chinese).
[18]
Murray D M,Yakowitz S.Constrained differential dynamic programming and its application to multireservoir control[J].Water Resour Res,1979,15(5):1017-1027.
[19]
李想,魏加华,姚晨晨,等.基于并行动态规划的水库群优化[J].清华大学学报:自然科学版,2013,53(9):1235-1240.Li Xiang,Wei Jiahua,Yao Chenchen,et al.Parallel dynamic programming for multi-reservoir system optimization[J].Journal of Tsinghua University:Science and Technology:Science and Nature Edition,2013,53(9):1235-1240 (in Chinese).