Sharma M,Pandit M,Srivastava L.Multi-area economic dispatch with tie-line constraints employing evolutionary approach[J].International Journal of Engineering, Science and Technology,2010,2(3):132-149.
[2]
张运洲,白建华,辛颂旭.我国风电开发及消纳相关重大问题研究[J].能源技术经济,2010,22(1):1-6.Zhang Yunzhou, Bai Jianhua, Xin Songxu.Study on the key issues concerning development and consumption of wind power in China[J].Energy Technology and Economics,2010,22(1):1-6(in Chinese).
[3]
Mahor A,Prasad V,Rangnekar S.Economic dispatch using particle swarm optimization:a review[J].Renewable and Sustainable Energy Reviews,2009,13(8):2134-2141.
[4]
Bahmani-Firouzi B,Farjah E,Azizipanah-Abarghooee R.An efficient scenario-based and fuzzy self-adaptive learning particle swarm optimization approach for dynamic economic emission dispatch considering load and wind power uncertainties[J].Energy,2013(50):232-244.
[5]
马瑞,康仁,姜飞,等.考虑风电随机模糊不确定性的电力系统多目标优化调度计划研究[J].电力系统保护与控制,2013,41(1):150-156.Ma Rui,Kang Ren,Jiang Fei,et al.Multi-objective dispatch planning of power system considering the stochastic and fuzzy wind power[J].Power System Protection and Control,2013,41(1):150-156(in Chinese).
[6]
陈海焱,陈金富,段献忠.含风电场电力系统经济调度的模糊建模及优化算法[J].电力系统自动化,2006,30(2):22-26.Chen Haiyan,Chen Jinfu,Duan Xianzhong.Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system[J].Automation of Electric Power Systems,2006,30(2):22-26(in Chinese).
[7]
刘德伟,郭剑波,黄越辉,等.基于风电功率概率预测和运行风险约束的含风电场电力系统动态经济调度[J].中国电机工程学报,2013,33(16):9-15.Liu Dewei,Guo Jianbo,Huang Yuehui,et al.Dynamic economic dispatch of wind integrated power system based on wind power probabilistic forecasting and operation risk constraints[J].Proceedings of the CSEE,2013,33(16):9-15(in Chinese).
[8]
Zhang B H,Shao J,Wu X S,et al.Unit commitment with wind farms using scenario tree and chance-constrained programming[J].Power System Protection and Control,2013,41(1):127-135.
[9]
张海峰,高峰,吴江,等.含风电的电力系统动态经济调度模型[J].电网技术,2013,37(5):1298-1303.Zhang Haifeng,Gao Feng,Wu Jiang,et al.A dynamic economic dispatching model for power grid containing wind power generation system[J].Power System Technology,2013,37(5):1298-1303(in Chinese).
[10]
Liu X.Economic load dispatch constrained by wind power availability:a wait-and-see approach[J].IEEE Transactions on Smart Grid,2010,1(3):347-355.
[11]
Jabr R A,Pal B C.Intermittent wind generation in optimal power flow dispatching[J].IET Generation, Transmission & Distribution,2009,3(1):66-74.
[12]
张伯明,吴文传,郑太一,等.消纳大规模风电的多时间尺度协调的有功调度系统设计[J].电力系统自动化,2011,35(1):1-6.Zhang Boming,Wu Wenchuan,Zheng Taiyi,et al.Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J].Automation of Electric Power Systems,2011,35(1):1-6(in Chinese).
[13]
王魁,张步涵,闫大威,等.含大规模风电的电力系统多时间尺度滚动协调调度方法研究[J].电网技术,2014,38(9):2434-2440.Wang Kui,Zhang Buhan,Yan Dawei,et al.A multi-time scale rolling coordination scheduling method for power grid integrated with large scale wind farm[J].Power System Technology,2014,38(9):2434-2440 (in Chinese).
[14]
汪宁渤,王建东,何世恩.酒泉风电跨区消纳模式及其外送方案[J].电力系统自动化,2011,35(22):82-89.Wang Ningbo,Wang Jiandong,He Shien.Cross border accommodation method and transmission scheme of Jiuquan wind power[J].Automation of Electric Power Systems,2011,35(22):82-89(in Chinese).
[15]
许丹,夏少连,程燕军,等.华中电网联络线计划优化建模与求解[J].电力系统自动化.2012,36(18):139-142.Xu Dan,Xia Shaolian,Cheng Yanjun,et al.Modeling of the tie-line power dispatch for Center China Grid[J].Automation of Electric Power Systems,2012,36(18):139-142(in Chinese).