全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
电网技术  2015 

适应低碳电源发展的低碳电网规划模型

DOI: 10.13335/j.1000-3673.pst.2015.10.007, PP. 2725-2730

Keywords: 低碳电源,电网规划,碳排放,网损

Full-Text   Cite this paper   Add to My Lib

Abstract:

实施面向低碳目标的电力规划可以缓解碳锁定效应,有效促进电力行业的低碳化发展。为充分挖掘电网环节的低碳潜力,提出适应低碳电源发展的电网规划模型与方法。建模过程全面考虑了电网环节的低碳相关要素,包括促进新能源并网与消纳、电网环节全生命周期碳排放的分析与管理以及降低电网损耗等。在此基础上,建立了适应低碳电源发展的低碳电网规划模型。模型基于多场景建模技术,可以精细化模拟电网规划方案下的系统运行。进一步,基于分离不等式法和约束成本变量法,将原模型转化为大规模混合整数线性规划模型,以简化模型求解。最后,基于江苏电网实际数据开展算例分析,验证了模型的有效性。

References

[1]  Secretary of State for Trade and Industry.Our energy future-creating a low carbon economy[R].UK:Energy White Paper,2003.
[2]  Grubb M,Jamasb T,Pollitt Ml G.Delivering a low-carbon electricity system [M].Cambridge:Cambridge University Press,2008.
[3]  卢斯煜,娄素华,吴耀武.低碳经济下基于排放轨迹约束的电力系统电源扩展规划模型[J].电工技术学报,2011,26(11):175-181.Lu Siyu,Lou Suhua,Wu Yaowu.A model for generation expansion planning of power system based on carbon emission trajectory model under low-carbon economy[J].Transaction of China Electro-technical Society,2011,26(11):175-181(in Chinese).
[4]  Gelmini A,Benini M,Borgarello M.Assessment of the actions to reduce CO 2 emissions in the Italian power system[C]//5th International Conference on European Electricity Market.Lisboa: IEEE Press,2008:1-5.
[5]  Sirikum J,Techanitisawad A,Kachitvichyanukul V.A new efficient GA-benders’ decomposition method:for power generation expansion planning with emission controls[J].IEEE Trans on Power Systems,2007,22(3):1092-1100.
[6]  宋旭东,向铁元,熊虎,等.考虑碳排放权分配的低碳电源规划[J].电力系统自动化,2012,36(10):47-52.Song Xudong,Xiang Tieyuan,Xiong Hu,et al.Low carbon generation expansion planning based on carbon emission right allocation[J].Automation of Electric Power Systems,2012,36(10):47-52(in Chinese)
[7]  康重庆,周天睿,陈启鑫,等.电网低碳效益评估模型及其应用[J].电网技术,2009,33(17):1-7.Kang Chongqing,Zhou Tianrui,Chen Qixin,et al.Assessment model on low-carbon effects of power grid and its application[J].Power System Technology,2009,33(17):1-7(in Chinese).
[8]  谢传胜,董达鹏,段凯彦,等.基于层次分析法-距离协调度的低碳电源电网规划协调度评价[J].电网技术,2012,36(11):1-6.Xie Chuansheng,Dong Dapeng,Duan Kaiyan,et al.Coordination degree evaluation of low carbon generation and grid planning based on analysis hierarchy process method and distance coordination degree[J].Power System Technology,2012,36(11):1-6(in Chinese).
[9]  Kazerooni A K,Mutale J.Transmission network planning under security and environmental constraints[J].IEEE Trans on Power Systems,2010,25(2):1169-1178.
[10]  Sadegheih A.A novel formulation of carbon emissions costs for optimal design configuration of system transmission planning[J].Renewable Energy,2010,35(5):1091-1097..
[11]  Qiu Jing,Dong Zhaoyang,Zhao Junhua,et al.A low-carbon oriented probabilistic approach for transmission expansion planning[J].Journal of Modern Power System and Clean Energy,2015,3(1):14-23.
[12]  娄素华,卢斯煜,吴耀武,等.低碳电力系统规划与运行优化研究综述[J].电网技术,2013,37(6):1484-1490.Lou Suhua,Lu Siyu,Wu Yaowu,et al.An overview on low-carbon power system planning and operation optimization[J].Power System Technology,2013,37(6):1484-1490(in Chinese).
[13]  Zhang Ning,Kang Chongqing,Duan Changgang,et al.Simulation methodology of multiple wind farms operation considering wind speed correlation[J].International Journal of Power and Energy Systems,2010,30(4):264-173.
[14]  Sun Yanlong,Kang Chongqing,Dong Xiaoming,et al.Life cycle assessment of energy consumption and CO 2 emission for transmission system[C]//IEEE Power and Energy Society General Meeting.Washington D.C.:IEEE Press ,2014:1-5.
[15]  钟海旺.内嵌网损的日前发用电计划模型与方法研究[D].北京:清华大学,2013.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133