[1] | Fang Jun,Niu Dongxiao,Huang Yuansheng.An options model for evaluating the dynamic benefit of PS stations[J].Power System Technology,2005,29(16):38-41.
|
[2] | 陈志刚.惠州抽水蓄能电站建设的必要性分析[J].电网技术,2001,25(7):67-71.
|
[3] | Chen Zhigang.On necessity of building Huizhou pumped-storage power station[J].Power System Technology,2001,25(7):67-71.
|
[4] | 王永福,张伯明,孙宏斌,等.国外平衡机制介绍及建设我国实时平衡市场的建议[J].电网技术,2003,27(9):10-13.
|
[5] | Wang Yongfu,Zhang Boming,Sun Hongbin,et al.An introduction to foreign balancing market mechanism and suggestions on constructing real-time balancing market in China[J].Power System Technology,2003,27(9):10-13.
|
[6] | Yao Jiangang,Tang Jie,Li Xiquan,et al.Research on bidding mode in a generation-side power market[J].Proceedings of the CSEE,2004,24(5):78-83.
|
[7] | 武亚光,于继来,张锐,等.无功辅助服务的目标带调控法[J].中国电机工程学报,2003,23(8):12-16.
|
[8] | Wu Yaguang,Yu Jilai,Zhang Rui,et al.Objective-belt regulating and controlling method for reactive power ancillary services [J].Proceedings of the CSEE,2003,23(8):12-16.
|
[9] | 温步瀛,陈冲,程浩忠.电力市场条件下无功支持服务补偿成本分析[J].电网技术,2005,29(5):52-56.
|
[10] | Wen Buying,Chen Chong,Cheng Haozhong.Analysis on compensation cost of reactive power supporting service under power market[J].Power System Technology,2005,29(5):52-56.
|
[11] | 高志华,任震,黄雯莹.电力市场中调峰权及其交易机制[J].中国电机工程学报,2005,25(5):88-92.
|
[12] | Gao Zhihua,Ren Zhen,Huang Wenying.Peak regulation right and the corresponding transaction mechanism in electricity market [J].Proceedings of the CSEE,2005,25(5):88-92.
|
[13] | 方军,牛东晓,黄元生.抽水蓄能电站动态效益的期权评价模型[J].电网技术,2005,29(16):38-41.
|
[14] | 张富新.抽水蓄能机组AGC控制的典型流程和系统构成[J].电网技术,2005,29(18):39-41.
|
[15] | Zhang Fuxin.The typical process and system structure of pumped- storage power units based on AGC control[J].Power System Technology,2005,29(18):39-41.
|
[16] | 陈旭.关于建设坚强广东电网的若干建议[J].电网技术,2004,28(24):61-64.
|
[17] | Chen Xu.Some suggestions on constructing strong Guangdong power network[J].Power System Technology,2004,28(24):61-64.
|
[18] | 广东省电力设计研究院.《广东电网“十一五”规划》系列报告[R].广州:广东省电力设计研究院,2005.
|
[19] | 广东省电力设计研究院.广东省建设抽水蓄能电站必要性和可行性分析[R].广州:广东省电力设计研究院,2004.
|
[20] | 焦连伟,文福拴,祁达才,等.电力市场中辅助服务的获取与定价[J].电网技术,2002,26(7):1-6.
|
[21] | Jiao Lianwei,Wen Fushuan,Qi Dacai,et al.Procurement and pricing of ancillary services in electricity markets[J].Power System Technology,2002,26(7):1-6.
|
[22] | 广东省广电集团公司,广东省电力设计研究院.广东电网调峰与电源优化调整专题研究[R].广州:广东省广电集团公司,广东省电力设计研究院,2004.
|
[23] | 何光宇,王稹,裴哲义,等.三峡电力系统调峰问题的研究[J].电网技术,2003,27(10):12-16.
|
[24] | He Guangyu,Wang Zhen,Pei Zheyi,et al.Peak-load dispatching of Three Gorges power system[J].Power System Technology,2003,27(10):12-16.
|
[25] | 谭伦农,张保会.市场环境下的事故备用容量[J].中国电机工程学报,2002,22(11):54-58.
|
[26] | Tan Lunnong,Zhang Baohui.Reserve capacity for accident in power market environment[J].Proceedings of the CSEE,2002,22(11):54-58.
|
[27] | 杨梓俊,丁明,孙昕.电力市场下综合考虑系统可靠性和旋转备用效益的机组组合[J].电网技术,2003,27(6):13-18.
|
[28] | Yang Zijun,Ding Ming,Sun Xin.Unit commitment problem under the condition of electricity market considering system reliability and benefit from spinning reserve[J].Power System Technology,2003,27(6):13-18.
|
[29] | 国电动力经济研究中心,中国电力工程顾问集团公司.中国南方电网电源优化研究报告[R].北京:国电动力经济研究中心,中国电力工程顾问集团公司,2004.
|
[30] | 何永秀,关雷,蔡琪,等.抽水蓄能电站在电网中的保安功能与效益分析[J].电网技术,2004,28(20):54-57, 67.
|
[31] | He Yongxiu,Guan Lei,Cai Qi,et al.Analysis of securing function and economic benefit of pumped storage station in power grid [J].Power System Technology,2004,28(20):54-57,67.
|
[32] | 耿建,王锡凡,丁晓莺,等.电力市场分段竞价模型与分时竞价的比较[J].中国电机工程学报,2003,23(9):22-27.
|
[33] | Geng Jian,Wang Xifan,Ding Xiaoying,et al.Models of block bidding in power market and comparisons with hourly bidding [J].Proceedings of the CSEE,2003,23(9):22-27.
|
[34] | 吴玮,周建中,杨俊杰,等.分时电价下三峡梯级电站在日前电力市场中的优化运营[J].电网技术,2005,29(13):10-14,19.
|
[35] | Wu Wei,Zhou Jianzhong,Yang Junjie,et al.Day-ahead optimization schedules of Three Gorges cascade hydropower stations based on time-of-use electricity price[J].Power System Technology,2005,29(13):10-14,19.
|
[36] | 言茂松,童琪波.电力系统和抽水蓄能电站的电能价值当量分析及分时电价预测[J].电网技术,1997,21(5):42-47.
|
[37] | Yan Maosong,Tong Qibo.System electricity-value-equivalent(EVE) analysis and hourly time-of-day pricing with pumped storage plants [J].Power System Technology,1997,21(5):42-47.
|
[38] | 广东省广电集团公司,广东省电力设计研究院.《广东省电力工业“十一五”发展规划和2020年远景目标前期研究》系列报告[R].广州:广东省广电集团公司,广东省电力设计研究院,2003.
|
[39] | 曾鸣,刘敏,赵庆波,等.上网侧与销售侧峰谷分时电价联动的理论及应用[J].中国电力,2003,36(9):70-74.
|
[40] | Zeng Ming,Liu Min,Zhao Qingbo,et al.Theory and application of change of mutual relation between selling side and generating side use time pricing[J].Electric Power,2003,36(9):70-74.
|
[41] | 姚建刚,唐捷,李西泉,等.发电侧电力市场竞价交易模式的研究[J].中国电机工程学报,2004,24(5):78-83.
|