[1] | 尚金成,黄永皓,夏清,等.电力市场理论研究与应用[M].北京:中国电力出版社,2002.
|
[2] | 王雁凌,张粒子,舒隽,等.合约交易量和竞价交易量在日计划中的经济分配[J].电力系统自动化,2002,26(9):45-49.
|
[3] | Wang Yanling,Zhang Lizi,Shu Juan,et al.Coordination of the dispatching relationship between the contract volume and competitive bidding volume in daily generation scheduling [J].Automation of Electric Power systems, 2002,26(9):45-49(in Chinese).
|
[4] | 蒋东荣,刘学军,李群湛.电力市场环境下电网日发电计划的电量经济分配策略[J].中国电机工程学报,2004,24(7):90-94.
|
[5] | Jiang Dongrong,Liu Xuejun,Li Qunzhan.Economically distributing strategies for daily generation scheduling in a power system under power market environment[J].Proceedings of the CSEE,2004,24(7):90-94(in Chinese).
|
[6] | 李伟,孙电.基于限量竞价的日发电计划编制[J].电网技术,2004,28(20):76-79.
|
[7] | Li Wei,Sun Dian.Research on daily generation scheduling based on bidding with limited electricity quantity[J].Power System Technology,2004,28(20):76-79(in Chinese).
|
[8] | 易俗,王文平,刘应梅,等.一种基于线性规划的交易管理实用算法[J].电网技术,2003,27(1):57-60.
|
[9] | Yi Su,Wang Wenping,Liu Yingmei,et al.A practical trading management algorithm based on linear programming[J].Power System Technology,2003,27(1):57-60(in Chinese).
|
[10] | 吕泉,李卫东,武亚光.日前电力市场的多时段购电交易新算法[J].电网技术,2005,29(16):33-37.
|
[11] | Lü Quan,Li Weidong,Wu Yaguang.A novel multi-period transaction algorithm for day-ahead electricity market[J].Power System
|
[12] | Technology,2005,29(16):33-37(in Chinese).
|
[13] | 黄莹,赵建国,张莉.电力市场竞价交易模型初探[J].电网技术,2002,26(11):53-57.
|
[14] | Huang Ying,Zhao Jianguo,Zhang Li.A study on bidding transaction model in electricity market[J].Power System Technology,2002,26(11):53-57(in Chinese).
|
[15] | 王承明,郭志忠,于尔铿.确定机组组合的一种改进的动态规划方法[J].电网技术,2001,25(5):20-24.
|
[16] | Wang Chengming,Guo Zhizhong,Yu Erkeng.An improved dynamic programming method for determining unit commitment [J].Power System Technology,2001,25(5):20-24(in Chinese).
|
[17] | 黄莹,赵建国.网络规划法在电力市场竞价交易计划算法中的应用[J].电网技术,2003,27(4):64-67.
|
[18] | Huang Ying,Zhao Jianguo.Application of network programming in bidding algorithm for competition in electricity market [J].Power System Technology,2003,27(4):64-67(in Chinese).
|
[19] | 王承明,郭志忠.考虑非凸曲线的电力市场交易方法[J].电网技术,2002,26(7):19-23.
|
[20] | Wang Chengming,Guo Zhizhong.Application of quadratic programming method competitive price in electricity market [J].Power System Technology,2002,26(7):19-23(in Chinese).
|
[21] | 孟祥星,韩学山.一种新的计及备用约束的调度模型[J].电网技术,2005,29(14):20-25.
|
[22] | Meng Xiangxing,Han Xueshan.A novel dispatching model considering reserve constraint[J].Power System Technology,2005,29(14):20-25(in Chinese).
|
[23] | 邵伟,徐政.发电市场预调度计划模型及算法研究[J].电网技术,2001,25(3):17-21.
|
[24] | Shao Wei,Xu Zheng.Sutdy on model and algorithm of pre-dispatch schedule in power generation market[J].Power System Technology,2001,25(3):17-21(in Chinese).
|
[25] | Guan X,Luh P B,Yan H,et al. Short-term scheduling of thermal power systems[C].Proceedings of the 17th Power Industry Computer Application Conference,Baltimore,1991:120-126.
|
[26] | Motto A L,Galiana F D,Conejo A J,et al.Network-constrained multiperiod auction for a pool-based electricity market[J].IEEE Trans on Power Systems,2002,17(3):646-653.
|
[27] | 唐焕文,秦学志.实用最优化方法[M].大连:大连理工大学出版社,1994.
|