T&D world Energicing.A prism Business Media Publication,2006,5(19).
[2]
Rick Bush (Editoral Director).Thingking big in the neighborhood. AEP has reached a big milestone in the Wyoming-Jacksons Ferry Project[J].Transmission & Distribution,2005,57(12):10-12.
[3]
Robert Schainker,John Douglas,Thomas kropp.Electric utility responses to grid security issues[J].Power&Energy,2006,4(2):30-37.
[4]
Stiegemeier G L,Girgis Ramsis.Rapidty deployable recorery transformers[J].Power&Energy,2006,4(2):39-45.
Rick Bush(Editoral Direcfor).Global Viewpoint. Should we consider Non-Wires Solutions?[N].Transmission & Distribution,2006,58(1):8-10.
[9]
Yi Lidong,Lü Shirong.Study and application of construction key- technologies for 750kV Transmission and transformation demonstration Project[J].Power System Technotogy,2006,30(6):31-56(in Chinese).
[10]
吕世荣,刘本粹.750 kV输变电工程关键技术研究[J].中国电力,2006,39(1):1-6.
[11]
Lu Shirong,Liu Bencui.Stuclies on key-technologies of 750 kV transmission and Transformation Projecf[J].Electric Power,2006,39(1):1-6(in Chinese).
Yin Yonghua,Fang Xi,Zhu Yue.General situafion of System commissioning for 750 kV Transmission Pilot Project[J].Power System Technology,2005,29(20):1-9(in Chinese).
Huang Minliang.Study on connecting System for Laxiwa Hydropower Station and construction Schemes of 750 kV Northwest China Power Grid[J].Power System Technolegy,2005,29(13):20-25(in Chinese).