[1] | Ma H,Shahidehpour S M.Unit commitment with transmission security and voltage constraints[J].IEEE Trans on Power Systems,1999,14(2):757-764.
|
[2] | Kriti S,Birge H R.Using integer programming to refine Lagrangian-based unit commitment solutions[J].IEEE Trans on Power Systems,2000,15(1):151-156.
|
[3] | 钟德惠,熊信艮,吴耀武,等.机组优化组合问题的随机tabu搜索算法[J].电网技术,2003,27(10):35-38.
|
[4] | Zhong Dehui,Xiong Xinyin,Wu Yaowu,et al.Random tabu search with simulated annealing approach for the unit commitment problem [J].Power System Technology,2003,27(10):35-38(in Chinese).
|
[5] | 喻菁,周建中,戴洪海,等.机组组合问题的复合控制有色Petri网模型[J].电网技术,2004,28(11):62-66.
|
[6] | Yu Jing,Zhou Jianzhong,Dai Honghai,et al.Compound controlled colored Petri net model of unit commitment[J].Power System Technology,2004,28(11):62-66(in Chinese).
|
[7] | 杨俊杰,周建中,喻菁,等.一种求解大规模机组组合问题的混合智能遗传算法[J].电网技术,2004,28(19):47-50.
|
[8] | Yang Junjie,Zhou Jianzhong,Yu Jing,et al.A hybrid intelligent genetic algorithm for large-scale unit commitment[J].Power System Technology,2004,28(19):47-50(in Chinese).
|
[9] | 胡家声,郭创新,曹一家.一种适合于电力系统机组组合问题的混合粒子群优化算法[J].中国电机工程学报,2004,24(4):24-28.
|
[10] | Hu Jiasheng,Guo Chuangxin,Cao Yijia.A hybrid particle swarm optimization method for unit commitment problem[J].Proceedings of the CSEE,2004,24(4):24-28(in Chinese).
|
[11] | 王喆,余贻鑫,张弘鹏.社会演化算法在机组组合中的应用[J].中国电机工程学报,2004,24(4):12-17.
|
[12] | Wang Zhe,Yu Yixin,Zhang Hongpeng.Social evolutionary programming based unit commitment[J].Proceedings of the CSEE,2004,24(4):12-17(in Chinese).
|
[13] | 赵波,曹一家.电力系统机组组合问题的改进粒子群优化算法[J].电网技术,2004,28(21):6-10.
|
[14] | Zhao Bo,Cao Yijia.An improved particle swarm optimization algorithm for power system unit commitment[J].Power System Technology,2004,28(21):6-10(in Chinese).
|
[15] | 杨秀媛,张南,王海宁,等.用于中期电力市场的启发式机组组合算法[J].电网技术,2004,28(24):21-24.
|
[16] | Yang Xiuyuan,Zhang Nan,Wang Haining,et al.A heuristic unit commitment algorithm for medium-term electricity market[J].Power System Technology,2004,28(24):21-24(in Chinese).
|
[17] | 娄素华,余欣梅,熊信艮,等.电力系统机组启停优化问题的改进DPSO算法[J].中国电机工程学报,2005,25(8):30-35.
|
[18] | Lou Suhua,Yu Xinmei,Xiong Xinyin,et al.Unit commitment using improved discrete particle swarm optimization algorithm [J].Proceedings of the CSEE,2005,25(8):30-35(in Chinese).
|
[19] | Batut J,Renaud A.Daily generation scheduling optimization with transmission constraint: a new class of algorithm[J].IEEE Trans on Power Systems,1992,7(3):982-989.
|
[20] | Murillo-Sanchez C,Thomas R J.Thermal unit commitment including optimal AC power flow constraints[C].Proceedings of the Thirty- First Hawaii International Conference on System Sciences,1998,3:81-88.
|
[21] | Holmberg Kaj.Creative modeling: variable and constraint duplication in primal-dual decomposition methods[J].Annals of Operations Research,1998,(82):355-390.
|
[22] | 赵建国,韩学山,程时杰.网络流和内点法结合的有功动态优化调度[J].电力系统自动化,2003,27(23):22-27.
|
[23] | Zhao Jianguo,Han Xueshan,Cheng Shijie.Optimal active power dispatching combining network flow and interior point methods [J].Automation of Electric Power Systems,2003,27(23):22-27(in Chinese).
|
[24] | 丁晓莺,王锡凡,张显,等.基于内点割平面法的混合整数最优潮流算法[J].中国电机工程学报,2004,24(2):1-7.
|
[25] | Ding Xiaoying,Wang Xifan,Zhang Xian,et al.Mixed integer optimal power flow based on interior point cutting plane method [J].Proceedings of the CSEE,2004,24(2):1-7(in Chinese).
|
[26] | 孙景强,房大中,锺德成.暂态稳定约束下的最优潮流[J].中国电机工程学报,2005,25(12):12-17.
|
[27] | Sun Jingqiang,Fang Dazhong,Chung T S.Optimal power flow with transient stability constraints[J].Proceedings of the CSEE,2005,25(12):12-17(in Chinese).
|
[28] | 袁贵川,王建全,韩祯祥.电力市场下的最优潮流[J].电网技术,2004,28(5):13-17.
|
[29] | Yuan Guichuan,Wang Jianquan,Han Zhenxiang.Optimal power flow under electricity market[J].Power System Technology,2004,28(5):13-17(in Chinese).
|
[30] | Wood Allen J,Wollenberg Bruce F.Power generation, operation and control[M].New York:John Wiley & Sons Inc.,1996.
|
[31] | 陈皓勇,王锡凡.机组组合问题的优化方法综述[J].电力系统自动化,1999,23(4):51-56.
|
[32] | Chen Haoyong,Wang Xifan.A survey of optimization-based methods for unit commitment[J].Automation of Electric Power Systems,1999,23(4):51-56(in Chinese).
|
[33] | Sheble G B,Fahd G N.Unit commitment literature synopsis[J].IEEE Trans on Power Systems,1994,9(1):128-135.
|
[34] | Lee F N,Huang J,Adapa R.Multi-area unit commitment via sequential method and a DC power flow network model[J].IEEE Trans on Power Systems,1994,9(1):279-287.
|
[35] | 韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16.
|
[36] | Han Xueshan,Liu Zhuo.Optimal unit commitment including unit ramp rate[J].Power System Technology,1994,18(6):11-16(in Chinese).
|
[37] | Mantawy A H,Abdel-Magid Youssef L,Selim Shokri Z.Integrating genetic algorithms,tabu search,and simulated annealing for the unit commitment problem[J].IEEE Trans on Power Systems,1999,14(3):829-836.
|
[38] | 韩学山,赵建国.刚性优化与柔性决策结合的电力系统运行调度理论探讨[J].中国电力,2004,37(1):15-18.
|
[39] | Han Xueshan,Zhao Jianguo.Theoretical discussion on combination of rigid optimality and flexible decision-making for electric power system operation dispatching[J].Electric Power,2004,37(1):15-18(in Chinese).
|
[40] | Shaw J J.A direct method for security-constrained unit commitment [J].IEEE Trans on Power Systems,1995,10(3):1329-1342.
|
[41] | Wang S J,Shahidehpour S M,Kirschen D S,et al.Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation[J].IEEE Trans on Power Systems,1995,10(3):1294-1301.
|
[42] | 王民量,张伯明,夏清.考虑机组爬坡速率和网络安全的经济调度新算法[J].电力系统自动化,2000,24(5):14-20.
|
[43] | Wang Minliang,Zhang Boming,Xia Qing.A novel economic dispatching algorithm with unit ramp rate and network security constraints[J].Automation of Electric Power Systems,2000,24(5):14-20(in Chinese).
|
[44] | Xia Qing,Song Y H,Zhang Boming,et al.Effective decomposition and co-ordination algorithms for unit commitment and economic dispatch with security constraints[J].Electric Power Systems Research,2000,53(1):39-45.
|