[1] | Christlc R D,Wollenberg B F,Wangensteen I.Transmission management in the deregulated environment[J].IEEE Trans on Power Systems,2000,15(2):171-195.
|
[2] | Li Guoqing,Wang Chengshan,Yu Yixin.A survey on transmission transfer capability of interconnected electric power systems [J].Proceedings of the CSEE,2001,21(4):20-25(in Chinese).
|
[3] | Transmission Transfer Capability Task Force.Available transfer capability definitions and determination[R].Princeton:North American Electric Reliability Council,1996.
|
[4] | Ejebe G C,Waight J G,Santos-Nieto M,et al.Fast calculation of linear available transfer capability[J].IEEE Trans on Power Systems, 2000,15(3):255-260.
|
[5] | Grijalva S,Sauer P W,Weber J D.Enhancement of linear ATC calculations by the incorporation of reactive power flows[J].IEEE Trans on Power Systems,2003,18(2):619-623.
|
[6] | 刘皓明,严正,倪以信.快速计算电网可用输电能力的交流灵敏度方法[J].电力系统自动化,2003,27(19):11-15.
|
[7] | Liu Haoming,Yan Zheng,Ni Yixin.An AC power flow based sensitivity method for the fast calculation of available transfer capability[J].Automation of Electric Power Systems,2003,27(19):11-15(in Chinese).
|
[8] | Ou Y,Singh C.Assessment of available transfer capability and margins[J].IEEE Trans on Power Systems,2002,17(2):463-468.
|
[9] | Gravener M H,Nwankpa C.Available transfer capability and first order sensitivity[J].IEEE Trans on Power Systems,1999,14(2):512-518.
|
[10] | Jjarapu V,Chrity C.The continuation power flow: a tool for steady state voltage stability analysis[J].IEEE Trans on Power Systems,1992,7(1):416-423.
|
[11] | Chiang H D,Flueck A J,Shah K S.CPFLOW: A practical tool for tracing power system steady-state stationary behavior due to load and generation variations[J].IEEE Trans on Power Systems,1995,10(2): 623-632.
|
[12] | 王成山,李国庆,余贻鑫,等.电力系统区域间功率交换能力的研究(一):连续型方法的基本理论及应用[J].电力系统自动化,1999,23(3):23-26.
|
[13] | Wang Chengshan,Li Guoqing,Yu Yixin,et al.Study on transmission transfer capability of interconnected electric power systems(I):basic theory of continuation method and its application[J].Automation of Electric Power Systems,1999,23(3):23-26(in Chinese).
|
[14] | 王成山,李国庆,余贻鑫,等.电力系统区域间功率交换能力的研究(二):最大交换功率的模型与算法[J].电力系统自动化,1999,23(4):5-9.
|
[15] | Wang Chengshan,Li Guoqing,Yu Yixin,et al.Study on transmission transfer capability of interconnected electric power systems(II): model and algorithm for calculating maximum transmission power [J].Automation of Electric Power Systems,1999,23(4):5-9(in Chinese).
|
[16] | 刁勤华,Mohamed Shaaban,倪以信.运用连续二次规划法计算区域间极限传输容量[J].电力系统自动化,2000,24(24):5-8.
|
[17] | Diao Qinhua,Mohamed Shaaban,Nin Yixin.Inter-area total transfer capability using sequential quadratic programming method in power market[J].Automation of Electric Power Systems,2000,24(24):5-8(in Chinese).
|
[18] | 默哈莫德·夏班,刘皓明,李卫星.静态安全约束下基于 Benders分解算法的可用传输容量计算[J].中国电机工程学报,2003,23(8):7-11.
|
[19] | Liu Shengsong,Jiang Chuanwen,Hou Zhijian.Optimal power flow based total transfer capability calculation[J].Journal of Shanghai Jiaotong University,2004,38(8):1233-1237(in Chinese).
|
[20] | 韩学山,李晓波.考虑元件长期载荷容许条件的最大可用输电能力的实用计算方法[J].电网技术,2004,28(24):10-15.
|
[21] | Han Xueshan,Li Xiaobo.Practical calculation method of maximal available transfer capability considering long-term load permissible condition of power transmission components[J].Power System Technology,2004,28(24):10-15(in Chinese).
|
[22] | 李国庆,王成山,余贻鑫.大型互联电力系统区域间功率交换能力研究综述[J].中国电机工程学报,2001,21(4):20-25.
|
[23] | Mohamed Shaaban,Liu Haoming,Li Weixing.ATC calculation with static security constraints using Benders decomposition [J].Proceedings of the CSEE,2003,23(8):7-11(in Chinese).
|
[24] | 刘盛松,蒋传文,侯志俭.基于最优潮流的最大传输能力计算[J].上海交通大学学报,2004,38(8):1233-1237.
|
[25] | 张永平,童小娇,倪以信.基于半光滑牛顿法的可用输电能力新算法[J].电力系统自动化,2004,28(7):35-38.
|
[26] | Zhang Yongping,Tong Xiaojiao,Nin Yixin.A novel method for calculating available transfer capability using semi-smooth Newton method[J].Automation of Electric Power Systems,2004,28(7):35-38(in Chinese).
|
[27] | Luo X,Patton A D,Singh C.Real power transfer capability calculations using multi-layer feed-forward neutral network[J].IEEE Trans on Power Systems,2000,15(2):903-908.
|
[28] | 韩学山,柳焯.考虑机组爬坡速度和网络安全约束的经济调度解耦算法[J].电力系统自动化,2002,26(13):32-37.
|
[29] | Han Xueshan,Liu Zhuo.Decoupled economic dispatch including unit ramp rate and network security constraints[J].Automation of Electric Power Systems,2002,26(13):32-37(in Chinese).
|
[30] | Tsang L.Power systems test case archive-UWEE[DB/OL].http://www.
|
[31] | ee.washington.edu/research/pstca/2006.
|
[32] | Yan X H,Quintana V H.Improving an interior-point-based OPF by dynamic adjustments of step sizes and tolerances[J].IEEE Trans on Power Systems,1999,14(2):709-717.
|