[1] | 张宁,周天睿,段长刚,等.大规模风电场接入对电力系统调峰的影响[J].电网技术,2010,34(1):152-158.Zhang Ning,Zhou Tianrui,Duan Changgang,et al.Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J].Power System Technology,2010,34(1):152-158(in Chinese).
|
[2] | 方陈,夏清,孙欣.考虑大规模风电接入的发电机组检修计划[J].电力系统自动化.2010,34(19):20-24.Fang Chen,Xia Qing,Sun Xin.Generation maintenance scheduling with significant wind power penetration[J].Automation of Electric Power Systems,2010,34(19):20-24(in Chinese).
|
[3] | Garver L L.Adjusting maintenance schedules to levelize risk [J].IEEE Trans on Power Apparatus and Systems,1972,91(5):2057-2063.
|
[4] | Yamane Z A,Sidenblad K,Yoshimura M.A computationally efficient optimal maintenance scheduling method[J].IEEE Transactions on Paver Apparatus and Systems,1983(102):330-338.
|
[5] | Lucia M M,Andr C R.Goal programming approach to maintenance scheduling of generating units in large scale power systems[J].IEEE Transactions on Power Systems,1999,14(3):1021-1028.
|
[6] | Yellen J A,Vemuri T M,Lemonidis L.A decomposition approach to unit maintenance scheduling[J].IEEE Transactions on Power Systems,1992,7(2):726-733.
|
[7] | Marwali M K C,Shahidehpour S M.Long-term transmission and generation maintenance scheduling with network,fuel and emission constraints[J].IEEE Transactions on Power Systems,1999,14(3):1160-1165.
|
[8] | 冯永青,吴文传,张伯明,等.基于可信性理论的水火电机组检修计划[J].中国电机工程学报,2006,26(13):14-19.Feng Yongqing,Wu Wenchuan,Zhang Boming,et al.Hydrothermal generator maintenance scheduling based on credibility theory [J].Proceedings of the CSEE,2006,26(13):14-19(in Chinese).
|
[9] | 廖胜利,程春田,李刚,等.机组检修优化的最小缺电量模型[J].电网技术,2010,34(10):38-42.Liao Shengli,Cheng Chuntian,Li Gang,et al.A minimum power deficiency model for optimization of unit maintenance scheduling [J].Power System Technology,2010,34(10):38-42(in Chinese).
|
[10] | 院晓涛,姚建刚,陈亮.基于改进蚁群算法的发电机组检修计划优化[J].电网技术,2008,32(21):42-46.Yuan Xiaotao,Yao Jiangang,Chen Liang.Solving unit maintenance scheduling problem by use of improved ant colony algorithm [J].Power System Technology,2008,32(21):42-46(in Chinese).
|
[11] | 郭东浦.抽水蓄能电站效益计算方法和经济性研究[D].大连:大连理工大学,2001.
|
[12] | 张节潭,王茂春,徐有蕊,等.采用最小累积风险度法的含风电场电力系统发电机组检修计划[J].电网技术,2011,35(5):97-102.Zhang Jietan,Wang Maochun,Xu Yourui,et al.Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms[J].Power System Technology,2011,35(5):97-102(in Chinese).
|
[13] | Yare Y,Venayagamoorthy G K.GMS considering uncertainty in wind power in a wind-hydrothermal power system[C]//IEEE Power and Energy Society General Meeting.Minneapolis,MN USA:IEEE,2010:1-7.
|
[14] | 曹昉,张粒子.结合系统调峰容量比确定抽水蓄能机组装机容量的方法[J].电力自动化设备,2007,27(6):47-59.Cao Fang,Zhang Lizi.Determination of pumped storage plant capacity with peak regulation proportion[J].Electric Power Automation Equipment,2007,27(6):47-59(in Chinese).
|
[15] | 张节潭,程浩忠,胡泽春,等.含风电场的电力系统随机生产模拟[J].中国电机工程学报,2009,29(28):34-39.Zhang Jietan,Cheng Haozhong,Hu Zechun,et al.Power system probabilistic production simulation including wind farms [J].Proceedings of the CSEE, 2009,29(28):34-39(in Chinese).
|
[16] | 冯长有,王锡凡,别朝红,等.考虑机组故障的系统机组检修计划模型[J].电力系统自动化.2009,33(13):32-36.Feng Changyou,Wang Xifan,Bie Zhaohong,et al.A generator maintenance scheduling model considering unexpected unit failures [J].Automation of Electric Power Systems,2009,33(13):32-36(in Chinese).
|
[17] | 左郑敏,吴耀武,熊信银,等.机组检修计划问题的GA&SA组合算法[J].水电能源科学.2001,19(4):63-66.Zuo Zhengmin,Wu Yaowu,Xiong Xinyin,et al.Combination of GA and SA for generator maintenance scheduling[J].International Journal Hydroelectric Energy,2001,19(4):63-66(in Chinese).
|
[18] | 刘永梅,盛万兴.基于网络拓扑和遗传算法的配电设备检修计划优化模型[J].电网技术,2007,31(21):11-15.Liu Yongmei,Sheng Wanxing.Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm[J].Power System Technology,2007,31(21):11-15(in Chinese).
|
[19] | DOE/NREL/Alliance.Wind dataset[DB/OL].2011-01-08. http://www.nrel.gov/wind/integrationdatasets/eastern/methodology. html.
|
[20] | Grigg C,Wong P,Albrecht P,et al.The IEEE reliability test system—1996:a report prepared by the reliability test system task force of the application of probability methods subcommittee[J].IEEE Trans on Power Systems,1999,14(3):1010-1020.
|