US DOE Report.20% wind energy by 2030:increasing wind energy’s contribution to us electricity supply[EB/OL].[2012-10-1].http://www1.eere.energy gov/wind/pdfs/41869.pdf.
[2]
李颖浩,郭瑞鹏.基于广义Benders分解的启发式机组组合优化[J].电网技术,2012,36(3):179-183. Li Yinghao,Guo Ruipeng.A generalized benders decomposition based heuristic algorithm for unit commitment[J].Power System Technology,2012,36(3):179-183(in Chinese).
[3]
Takriti S,Birge J R,Long E.A stochastic model for the unit commitment problem[J].IEEE Transactions on Power Systems,1996,11(3):1497-1508.
[4]
Bouffard F,Galiana F D.Stochastic security for operations planning with significant wind power generation[J].IEEE Transactions on Power Systems,2008,23(2):1-11.
[5]
阚伟民,张俊杰,顾红柏.国产200 MW汽轮机组调峰运行转子热应力场和寿命损耗分析[J].广东电力,1999,12(2):24-27. Kan Weimin,Zhang Junjie,Gu Hongbai.Thermal stress and life lost analysis for a 200 MW Chinese-made steam peaking unit[J].Guangdong Electric Power,1999,12(2):24-27(in Chinese).
[6]
张克纯,顾金芳,吕永鑫.AGC负荷变化率对汽轮机寿命的影响[J].华东电力,2003(7):27-30. Zhang Kechun,Gu Jinfang,Lü Yongxin.Influence of AGC load change rate on life of turbine[J].East China Electric Power,2003(7):27-30(in Chinese).
[7]
赵书强,刘晨亮,王明雨,等.基于机会约束规划的储能日前优化调度[J].电网技术,2013,37(11):3055-3059. Zhao Shuqiang,Liu Chenliang,Wang Mingyu,et al.Chance-constrained programming based day-ahead optimal scheduling of energy storage[J].Power System Technology,2013,37(11):3055-3059(in Chinese).
[8]
龙军,莫群芳,增建.基于随机规划的含风电场的电力系统节能优化调度策略[J].电网技术,2011,35(9):133-138. Long Jun,Mo Qunfang,Zeng Jian.A stochastic programming based short-term optimization scheduling strategy considering energy conservation ofr power system containing wind farms[J].Power System Technology,2011,35(9):133-138(in Chinese).
[9]
Wang Q,Guan Y,Wang J.A chance-constrained two stage stochastic program for unit commitment with uncertain wind power output[J].IEEE Transactions on Power Systems,2012,27(1):206-215.
[10]
于佳,任建文,周明.基于机会约束规划的风-蓄联合动态经济调度[J].电网技术,2013,37(8):2116-2122. Yu Jia,Ren Jianwen,Zhou Ming.A chance-constrained programming based dynamic economic dispatch of wind farm and pumped-storage power station[J].Power System Technology,2013,37(8):2116-2122(in Chinese).
[11]
文旭,颜伟,王俊梅,等.考虑跨省交易能耗评估的区域节能电力市场与随机规划购电模型[J].电网技术,2013,37(2):500-506. Wen Xu,Yan Wei,Wang Junmei,et al.Regional energy-saving electricity market and stochastic programming power purchasing model considering assessment on energy consumption in trans-provincial transaction[J].Power System Technology,2013,37(2):500-506(in Chinese).
张保衡.调峰机组热应力及疲劳寿命[J].中国电机工程学报,1986,6(2):1-13. Zhang Baoheng.Thermal stress and life expenditure of steam turbine rotor for cycling service[J].Proceedings of the CSEE,1986,6(2):1-13(in Chinese).
[14]
Wenyuan Li.Probabilistic transmission system planning[M].New Jersey:IEEE and Wiley & Sons:53-55.
[15]
Zang P,Lee T.Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion[J].IEEE Transactions on Power Systems,2004,19(1):676-682.
[16]
Christie R.Power Systems test case archive[EB/OL].[2013-3-5].http://www.ee.washington.edu/research/pstca/.
[17]
Yu J,Yan W,Li W,et al.An unfixed piecewise optimal reactive power-flow model and its algorithm for AC-DC systems[J].IEEE Trans on Power Systems,2008,23(1):170-176.
[18]
Park Y M,Won J R,Park J B,et al.Generation expansion planning based on an adevanced evolutionary programming[J].IEEE Transactions on Power Systems,1999,14(1):299-305.