电网技术  2014 

厂站接线可靠性分析的改进通用生成函数法

DOI: 10.13335/j.1000-3673.pst.2014.09.025, PP. 2473-2478

Keywords: 厂站接线,可靠性,通用生成函数方法,多状态系统,样本缩减

Full-Text   Cite this paper   Add to My Lib

Abstract:

基于通用生成函数(universalgeneratingfunction,UGF)方法和多状态系统(multi-statesystem,MSS)理论,提出了厂站接线可靠性评估的模型和算法,解析获得反映厂站接线整体性能的多状态概率分布表达式,据此可灵活求取系统可靠性指标。通过分析厂站接线的特点,定义了合适的性能函数和相应的算子,将各元件的连通性归并到各自起始节点上,以多项式的形式建立各节点的u函数模型,并通过节点集的u函数运算,获得综合反映厂站接线故障后果及其发生概率的多状态系统u函数;针对多环形拓扑结构中元件的备用与功率的转移,引入桥连结构及其修正计算,改进了UGF方法难以处理无向图的不足;为降低计算复杂度,通过前期对单纯串并联支路的等值和计算过程中的样本缩减技术,提高了计算效率。针对3/2接线方式的分析,及与蒙特卡罗方法计算结果的比较,验证了所提方法的正确性和有效性。

References

[1]  Wang Shixiang,Gao Shibin.Application of Monte Carlo method in reliability evaluation of integrated substation automation[J].Power System Technology,2006,30(5):96-100(in Chinese).
[2]  Billinton R,Chen H,Jiaqi Zhou.Generalized n +2 state system Markov model for station-oriented reliability evaluation[J].IEEE Transactions on Power Systems,1997,12(4):1511-1517.
[3]  Billinton R,Chen H,Zhou Jiaqi.Individual generating station reliability assessment[J].IEEE Transactions on Power Systems,1999,14(4):1238-1244.
[4]  谢开贵,董百强,赵霞,等.大型(变)电站电气主接线可靠性综合分析系统[J].电力系统自动化,2006,30(15):89-92.
[5]  Xie Kaigui,Dong Baiqiang,Zhao Xia,et al.Design and application of reliability evaluation software for power stations[J].Automation of Electric Power Systems,2006,30(15):89-92(in Chinese).
[6]  别朝红,王锡凡.抽水蓄能电站主接线的可靠性综合评估[J].电力系统自动化,2006,30(9):9-14.
[7]  Bie Zhaohong,Wang Xifan.Integrated reliability evaluation of bus system arrangement for the pumped storage power stations[J].Automation of Electric Power Systems,2006,30(9):9-14(in Chinese).
[8]  束洪春,胡泽江,张静芳,等.±800 kV换流站主接线可靠性评估[J].电力系统自动化,2008,32(19):35-39.
[9]  Shu Hongchun,Hu Zejiang,Zhang Jingfang,et al.Reliability evaluation for main electrical scheme of a ±800 kV converter station[J].Automation of Electric Power Systems,2008,32(19):35-39(in Chinese).
[10]  丁雪成,胡海涛,何正友,等.计及维修因素的牵引变电站电气主接线可靠性分析[J].电网技术,2011,35(10):117-123.
[11]  Ding Xuecheng,Hu Haitao,He Zhengyou,et al.Analysis on reliability of main connection of traction substation considering influence of maintenance[J].Power System Technology,2011,35(10):117-123(in Chinese).
[12]  查申森,郑建勇,胡继军.基于全寿命周期理念的500 kV变电站初期主接线选择[J].电网技术,2010,34(3):117-122.
[13]  Zha Shensen,Zheng Jianyong,Hu Jijun.Selection of main electrical connection of a 500 kV substation in initial stage based on idea of life cycle[J].Power System Technology,2010,34(3):117-122(in Chinese).
[14]  Lisnianski A,Levitin G.Multi-state system reliability:assessment,optimization and applications[M].Singapore:World Scientific Publishing Company,2003:155-187.
[15]  王洪涛,刘旭,陈之栩,等.低碳背景下基于改进通用生成函数法的随机生产模拟[J].电网技术,2013,37(3):597-603.
[16]  Wang Hongtao,Liu Xu,Chen Zhixu,et al.Power system probabilistic production simulation based on improved universal generating function methods in low-carbon context[J].Power System Technology,2013,37(3):597-603(in Chinese).
[17]  Ding Y,Wang P,Goel L,et al.Long-term reserve expansion of power systems with high wind power penetration using universal generating function methods[J].IEEE Transactions on Power Systems,2011,26(2):766-774.
[18]  Liu Y,Huang H Z.Optimal selective maintenance strategy for multi-state systems under imperfect maintenance[J].IEEE Transactions on Reliability,2010,59(2):356-367.
[19]  Liu Y,Huang H Z.Optimal replacement policy for multi-state system under imperfect maintenance[J].IEEE Transactions on Reliability,2010,59(3):483-495.
[20]  郭永基.电力系统可靠性分析[M].北京:清华大学出版社,2003:162-169.
[21]  Endrenyi J.Three state models in power system reliability evaluation[J].IEEE Transactions on Power Apparatus and Systems,1971,90(4):1909-1916.
[22]  王世香,高仕斌.蒙特卡罗方法在变电站综合自动化可靠性评估中的应用[J].电网技术,2006,30(5):96-100.