Zhou Hao,Yu Yuhong.Discussion on several important problems of developing UHV AC transmission in China[J].Power System Technology,2005,29(12):1-9(in Chinese).
[4]
吴敬儒,徐永禧.我国特高压交流输电发展前景[J].电网技术,2005,29(3):1-4.
[5]
Wu Jingru,Xu Yongxi.Development prospect of UHV AC power transmission in China[J].Power System Technology,2005,29(3):1-4(in Chinese).
Shu Yinbiao,Liu Zehong,Yuan Jun,et al.A survey on demonstration of UHV power transmission by state grid corporation of China in the year of 2005[J].Power System Technology,2006,30(5):1-12(in Chinese).
Zhao Heng,Pang Yadong,Ni Min.UHVDC testing site ±800 kV selection and installation of large diameter suspended tubular bus[J].Electric Power Construction,2008,29(2):6-8,21(in Chinese).
Wan Qifa,Chen Yong,Xie Liang,et al.Corona experiment of apparatus in the UHV AC power system[J].High Voltage Engineering,2007,33(3):14-16,25(in Chinese).
Yi Hui,Xiong Youjing.Analysis on operating characteristic for10 000 kV AC UHV transmission line[J].Power System Technology,2006,30(15):1-7(in Chinese).
Liu Xingfa,Gan Zheyuan,Zhang Xiaowu,et al.Calculation of active interference in aeronautical radionavigation stations caused by UHVAC transmission line[J].Power System Technology,2008,32(2):6-8,12(in Chinese).
[19]
Nakano Y,Fukushima M.Statistical audible noise performance of Shiobara HVDC test line[J].IEEE Trans on Power Delivery,1990,5(1):290-296.
Zhu Puxuan,Yang Guang,He Jianguo,et al.Several suggestions for electromagnetic environment of EHV and UHV transmission lines in China[J].Power System Technology,2010,34(5):201-206(in Chinese).
Huang Daochun,Ruan Jiangjun,Wen Wu,et al.Study on electromagnetic environment of UHV AC transmission lines[J].Power System Technology,2007,31(1):6-11(in Chinese).
Li Naiyi,Peng Zongren,Du Jinqiao,et al.Simulate calculation and distribution of power frequency electric field in UHV substations [J].High Voltage Engineering,2012,38(9):2178-2188(in Chinese).
Hui Jianfeng,Guan Zhicheng,Liu Yingyan.Values and rationales of limits of power frequency electric and magnetic fields in various countries[J].High Voltage Engineering,2006,32(4):51-54(in Chinese).
Trlep M,Hamler A,Jesenik M,et al.Electric field distribution under transmission lines dependent on ground surface[J].IEEE Trans on Magnetics,2009,45(3):1748-1751.
[32]
Yang Xi,Peng Zongren,Li Naiyi,et al.Electric field distribution calculation and analysis on the surface of jumper on double circuit transposition tower in UHV AC transmission lines[C]//IEEE International Conference on Solid Dielectrics.Bologna,Italy,2013:202-205.
Liu Shili,Wang Zezhong,Sun Jing,et al.Calculation of power frequency electric field near equipments in UHV substations with BEM based on line-area models[J].Transactions of China Electrotechnical Society,2011,26(3):162-167(in Chinese).
[35]
Gay S,Ehsani M.Parametric analysis of eddy-current brake performance by 3-D finite-element analysis[J].IEEE Trans on Magnetics,2006,42(2):319-328.
Wan Baoquan,Xie Huichun,Fan Liang,et al.Electromagnetic environment and corona control measures of UHV substation[J].High Voltage Engineering,2010,36(1):109-115(in Chinese).
Liu Peng,Feng Yong,Zhang Shiling,et al.Optimization for ultra-high voltage AC bushing screening electrode structure[J].Journal of Xi’an Jiaotong University,2012,46(2):88-92(in Chinese).