电网技术  2014 

计及负荷时变性及分布式电源出力波动性的配电网两级实时重构

DOI: 10.13335/j.1000-3673.pst.2014.11.049, PP. 3260-3265

Keywords: 不平衡配电网,两级实时重构,时变性,DG出力波动,最大概率重构,(MPR)

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对分布式电源(distributedgeneration,DG)接入配电网的特点提出两级实时重构的概念。两级实时重构是指正常运行方式下的最大概率重构(maximumprobabilityreconfiguration,MPR),以及当DG出力或者负荷出现较大波动时,网络拓扑快速响应为实时重构(real-timereconfiguration,RTR)的运行方式。所提两级实时重构模型及方法重点考虑了DG出力和负荷的时变性、负荷的静态电压特性以及配电网的三相不平衡特性。文中比较了4种配电网重构方式的网损和网损率始终维持原始拓扑结构、15min实时重构、两级实时重构以及系统在额定负荷和额定DG出力水平下的最优重构。改进的IEEE16节点和IEEE34节点配电系统的仿真分析表明,所提的两级实时重构方法不仅能有效降低系统网损,同时提高了系统运行的安全性和可靠性。

References

[1]  Sarma N D R,Prakasarao K S.A new 0-1 integer programming method of feeder reconfiguration for loss minimization in distribution systems[J].Electric Power Systems Research,1995,33(2):125-131.
[2]  邓佑满,张伯明,相年德.配电网络重构的改进最优流模式算法[J].电网技术,1995,19(7):47-50. Deng Youman,Zhang Boming,Xiang Niande.An improved optimal flow pattern algorithm for distribution network reconfiguration[J].Power System Technology,1995,19(7):47-50(in Chinese).
[3]  张栋,张刘春,傅正财.配电网络重构的快速支路交换算法[J].电网技术,2005,29(9):82-85. Zhang Dong,Zhang Liuchun,Fu Zhengcai.A quick branch-exchange algorithm for reconfiguration of distribution networks[J].Power System Technology,2005,29(9):82-85(in Chinese).
[4]  孙惠娟,彭春华,余廷芳.配电网三相平衡优化重构策略[J].电网技术,2013,38(3):789-794. Sun Huijuan,Peng Chunhua,Yu Tingfang.A three-phase equilibrium reconfiguration strategy for distribution network[J].Power System Technology,2013,38(3):789-794(in Chinese).
[5]  周湶,张冠军,李剑,等.基于化整为零策略和改进二进制差分进化算法的配电网重构[J].电网技术,2012,36(3):197-203. Zhou Quan,Zhang Guanjun,Li Jian,et al.Distribution network reconfiguration based on strategy of breaking up the whole into parts and improved binary differential evolution algorithm[J].Power System Technology,2012,36(3):197-203(in Chinese).
[6]  李振坤,陈星莺,余昆,等.配电网重构的混合粒子群算法[J].中国电机工程学报,2008,28(31):35-41. Li Zhenkun,Chen Xingying,Yu Kun,et al.Hybrid particle swarm optimization for distribution network reconfiguration[J].Proceedings of the CSEE,2008,28(31):35-41(in Chinese).
[7]  余健明,蔡利敏.基于改进遗传算法的配电网络重构[J].电网技术,2004,28(9):71-74. Yu Jianming,Cai Limin.Distribution network reconfiguration based on improved genetic algorithm[J].Power System Technology,2004,28(9):71-74(in Chinese).
[8]  麻秀范,张粒子,孔令宇.基于家族优生学的配网重构[J].中国电机工程学报,2004,24(10):97-102. Ma Xiufan,Zhang Lizi,Kong Lingyu.Reconfiguration of distribution networks based on family eugenics based evolution algorithm[J].Proceedings of the CSEE,2004,24(10):97-102(in Chinese).
[9]  余健明,王征,许苗.考虑负荷变化的配电网动态分时段重构[J].高电压技术,2007,33(9):125-129. Yu Jianming,Wang Zheng,Xu Miao.Dynamic reconfiguration of distribution network with dividing time and considering load changes[J].High Voltage Engineering,2007,33(9):125-129(in Chinese).
[10]  尹丽燕,于继来.多时间段落的配电网络动态重构[J].中国电机工程学报,2002,22(7):44-48. Yin Liyan,Yu Jilai.Dynamic reconfiguration of distribution network with multi-time period[J].Proceedings of the CSEE,2002,22(7):44-48(in Chinese).
[11]  江东林,刘天琪,李樊.采用时段动态划分和分层优化策略的配电网重构[J].电网技术,2012,36(2):153-157. Jiang Donglin,Liu Tianqi,Li Fan.Dynamic distribution network reconfiguration based on dynamic partition of time intervals and hierarchical optimization[J].Power System Technology,2012,36(2):153-157(in Chinese).
[12]  Amanulla B,Chakrabarti S,Singh S N.Reconfiguration of power distribution systems considering reliability and power loss[J].IEEE Transactions on Power Delivery,2012,27(2):918-926.
[13]  Granaghan M M,Ortmeyer T,Crudele D,et al.Renewable systems interconnection study:advanced grid planning and operation[R].Albuquerque:Sandia National Laboratories,2008.
[14]  IEEE application guide for IEEE Std 1547.2-2008:1-207.IEEE standard for interconnecting distributed resources with electric power systems[S].2009.
[15]  IEEE Std 929-2000.IEEE recommended practice for utility interface of photovoltaic (PV) systems[S].2000.
[16]  Carvalho P M S,Correia P F,Ferreira L A F.Distributed reactive power generation control for voltage rise mitigation in distribution networks[J].IEEE Transactions on Power Systems,2008,23(2):766-772.
[17]  Turitsyn K,Sulc P,Backhaus S,et al.Distributed control of reactive power flow in a radial distribution circuit with high photovoltaic penetration[C]//Power and Energy Society General Meeting.Minneapolis:Power and Energy Society General Meeting,2010:1-6.
[18]  Taleski R,Rajicic D.Distribution networks reconfiguration for energy loss reduction[J].IEEE Transactions on Power Systems,1997,12(1):398-406.
[19]  Su S Y,Lu C N,Chang R F,et al.Distributed generation interconnection planning:a wind power case study[J].IEEE Transactions on Smart Grid,2011,2(1):181-189.
[20]  艾欣,韩晓男,孙英云.大型光伏电站并网特性及其低碳运行与控制技术[J].电网技术,2013,37(1):15-23. Ai Xin,Han Xiaonan,Sun Yingyun.Grid-connection characteristics of large-scale photovoltaic power station and its low-carbon operation and control technology[J].Power System Technology,2013,37(1):15-23(in Chinese).
[21]  Distribution System Analysis Subcommittee.IEEE 34 node test feeder[EB/OL].Piscataway:IEEE Power Engineering Society, 2010-09-17[2014-05-10].http://ewh.ieee.org/soc/pes/dsacom/
[22]  testfeeders/index.html.
[23]  López E,Opazo H,García L,et al.Minimal loss reconfiguration based on dynamic programming approach:application to real systems[J].Power Components System,2002,30(7):693-704.
[24]  Hajagos L M,Danai B.Laboratory measurements and models of modern loads and their effect on voltage stability studies[J].IEEE Transactions on Power Systems,1998,13(2):584-592.
[25]  Civanlar S,Grainger J J,Yin H,et al.Distribution feeder reconfiguration for loss reduction[J].IEEE Transactions on Power Delivery,1988,3(3):1217-1223.