黎灿兵,胡亚杰,赵弘俊,等.合约电量分解通用模型与算法[J].电力系统自动化,2007,31(11):26-30.Li Canbing,Hu Yajie,Zhao Hongjun,et al.General model and algorithm for contract energy decomposition[J].Automation of Electric Power Systems,2007,31(11):26-30(in Chinese).
[2]
温丽丽,刘俊勇,吴志云,等.基于月度滚动修正的合同电量分解算法与应用[J].现代电力,2008,25(1):82-87.Wen Lili,Liu Junyong,Wu Zhiyun,et al.Study and application of resolution algorithm of contract volume based on monthly rolling amendment[J].Modern Electric Power,2008,25(1):82-87(in Chinese).
[3]
王冠群,刘锋,梅生伟,等.合同电量优化分解模型及算法[J].电机与控制学报,2012,16(7):58-64.Wang Guanqun,Liu Feng,Mei Shengwei,et al.Optimization model and algorithm for contract energy decomposition[J].Electric Machines and Control,2012,16(7):58-64(in Chinese).
[4]
王帅.一种发电滚动计划的优化算法研究[D].北京:华北电力大学,2009.
[5]
方陈,夏清,孙欣.考虑大规模风电接入的发电机组检修计划[J].电力系统自动化,2010,34(19):20-24.Fang Chen,Xia Qing,Sun Xin.Generation maintenance scheduling with significant wind power penetration[J].Automation of Electric Power Systems,2010,34(19):20-24(in Chinese).
[6]
王丹平,陈之栩,涂孟夫,等.考虑大规模风电接入的备用容量计算[J].电力系统自动化,2012,36(21):24-28.Wang Danping,Chen Zhixu,Tu Mengfu,et al. Reserve capacity calculation considering large-scale wind power integration[J].Automation of Electric Power Systems,2012,36(21):24-28(in Chinese).
[7]
张昭遂,孙元章,李国杰,等.计及风电功率不确定性的经济调度问题求解方法[J].电力系统自动化,2011,35(22):125-130.Zhang Zhaosui,Sun Yuanzhang,Li Guojie,et al.A solution of economic dispatch problem considering wind power uncertainty[J].Automation of Electric Power Systems,2011,35(22):125-130(in Chinese).
[8]
王旭,蒋传文,刘玉娇,等.含大规模风电场的电力系统旋转备用风险决策模型和方法[J].电力系统自动化,2014,28(13):64-70.Wang Xu,Jiang Chuanwen,Liu Yujiao,et al. Decision-making model and method for spinning reserve and risk of power system integrated with large-scale wind farms[J].Automation of Electric Power Systems,2014,28(13):64-70(in Chinese).
[9]
艾欣,韩晓男,孙英云.大型光伏电站并网特性及其低碳运行与控制技术[J].电网技术,2013,37(1):15-23.Ai Xin,Han Xiaonan,Sun Yingyun.Grid-connection characteristics of large-scale photovoltaic power station and its low-carbon operation and control technology[J].Power System Technology,2013,37(1):15-23(in Chinese).
[10]
董伟杰,白晓民,朱宁辉,等.间歇式电源并网环境下电能质量问题研究[J].电网技术,2013,37(5):1265-1271.Dong Weijie,Bai Xiaomin,Zhu Ninghui,et al.Discussion on the power quality under grid-connection of intermittent power sources[J].Power System Technology,2013,37(5):1265-1271(in Chinese).
[11]
何俊,邓长虹,徐秋实,等.基于等可信容量的风光储电源优化配置方法[J].电网技术,2013, 37(12):3317-3324.He Jun,Deng Changhong,Xu Qiushi,et al.Optimal configuration of distributed generation system containing wind PV battery power sources based on equivalent credible capacity theory[J].Power System Technology,2013,37(12):3317-3324(in Chinese).
[12]
顾宇桂,罗智,单葆国.2013年中国电力供需形势展望[J].中国电力,2013,48(1):7-10.Gu Yugui,Luo Zhi,Shan Baoguo.Outlook 2013 of power supply and demand and related suggestions[J].Electric Power,2013,48(1): 7-10(in Chinese).
[13]
单葆国,谭显东,温权,等.2013年中国电力供需形势分析预测[J].中国电力,2013,46(8):7-10.Shan Baoguo,Tan Xiandong,Wen Quan,et al.Analysis and prediction of China's electricity demand and supply in 2013[J].Electric Power,2013,46(8):7-10(in Chinese).
[14]
梁志飞,夏清,许洪强,等.基于多目标优化模型的省级电网月度发电计划[J].电网技术,2009,33(13):90-95. Liang Zhifei,Xia Qing,Xu Hongqiang,et al.Monthly generation scheduling method based on multi-objective optimization model for provincial power grid[J].Power System Technology,2009,33(13): 90-95(in Chinese).
[15]
李翔.电力系统月度发购电计划的优化方法研究[D].重庆:重庆大学,2013.
[16]
夏清,陈雨果,陈亮.考虑月度机组组合的节能发电调度模式与方法[J].电网技术,2011,35(6):27-33.Xia Qing,Chen Yuguo,Chen Liang.Establishment of mode and method for energy-conservation monthly unit commitment consideration dispatching[J].Power System Technology,2011, 35(6): 27-33(in Chinese).