全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
电网技术  2014 

一种扩展黑启动方案恢复效果的评估方法

DOI: 10.13335/j.1000-3673.pst.2014.12.014, PP. 3360-3365

Keywords: extended,black-start,restoration,effect,comprehensive,assessment,index,system,gray,correlation

Full-Text   Cite this paper   Add to My Lib

Abstract:

扩展黑启动恢复策略对于加快大停电后的恢复过程具有重要意义,针对扩展黑启动方案的恢复效果研究,提出了一种基于综合权重的灰色关联评估方法。首先构建了一套较完整的评估指标体系,包括机组恢复、网络结构、运行状态等方面;其次采用模糊赋权法和熵权法分别计算各指标的主、客观权重,通过基于博弈论的组合赋权法优化得到指标的综合权重,克服了单一赋权法的不足;然后以改进的灰色关联分析法对扩展黑启动方案的恢复效果进行综合评估。10机39节点系统的算例结果验证了所提评估方法的有效性与合理性。

References

[1]  薛禹胜,肖世杰.综合防御高风险的小概率事件[J].电力系统自动化,2011,35(8):1-11. Xue Yusheng,Xiao Shijie.Comprehensively defending high risk events with low probability[J].Automation of Electric Power Systems,2011,35(8):1-11(in Chinese).
[2]  汤涌,卜广全,易俊.印度“7.30”、“7.31”大停电事故分析及启示[J].中国电机工程学报,2012,32(25):167-174. Tang Yong,Bu Guangquan,Yi Jun.Analysis and lessons of the blackout in Indian Power Grid on July 30 and 31,2012[J].Proceedings of the CSEE,2012,32(25):167-174(in Chinese).
[3]  刘艳,张凡,顾雪平.大停电后的机组投运风险评估[J].中国电机工程学报,2013,33(31):106-113. Liu Yan,Zhang Fan,Gu Xueping.Risk assessment for restoring units following large-scale blackout[J].Proceedings of the CSEE,2013,33(31):106-113(in Chinese).
[4]  赵达维,刘天琪,李兴源.电力系统恢复控制在线决策方法[J].电网技术,2013,37(10):2762-2770. Zhao Dawei,Liu Tianqi,Li Xingyuan.An on-line decision-making method applicable to power system restoration control[J].Power System Technology,2013,37(10):2762-2770(in Chinese).
[5]  Jerry J A.A framework for power system restoration following a major power failure[J].IEEE Trans on Power Systems,1995,9(3):1480-1485.
[6]  Gomes R,Carlos A,Guarini A.Guidelines for power system restoration in the Brazilian system[J].IEEE Trans on Power Systems,2004,19(2):1159-1164.
[7]  Delfino B,Denegri G B,Invernizzi M,et al.Black-start and restoration of a part of the Italian HV network:modeling and simulation of a field test[J].IEEE Trans on Power Systems,1996,11(3):1371-1379.
[8]  李膨源,马静.基于反相传播神经网络的黑启动三相合闸统计过电压快速预测[J].华北电力大学学报,2012,39(5):6-11. Li Pengyuan,Ma Jing.Fast forcasting of statistical no-load switching overvoltages in black start process based on back propagation artificial neural networks[J].Journal of North China Electric Power University,2012,39(5):6-11(in Chinese).
[9]  程改红,徐政.电力系统故障恢复过程中的过电压控制[J].电网技术,2004,28(11):29-33. Cheng Gaihong,Xu Zheng.A method to control sustained over voltage during power system restoration[J].Power System Technology,2004,28(11):29-33(in Chinese).
[10]  李如琦,唐林权,凌武能,等.基于前景理论和灰关联分析法的黑启动方案优选[J].电力系统保护与控制,2013,41(5):103-107. Li Ruqi,Tang Linquan,Ling Wuneng,et al.Optimization of black-start based on prospect theory and grey relational analysis[J].Power System Protection and Control,2013,41(5):103-107(in Chinese).
[11]  王宏,林振智,文福拴,等.基于区间数的黑启动决策方法[J].电力系统自动化,2013,37(11):26-32. Wang Hong,Lin Zhenzhi,Wen Fushuan,et al.A black-start decision-making method based on interval values[J].Automation of Electric Power Systems,2013,37(11):26-32(in Chinese).
[12]  Weijia Liu,Zhenzhi Lin,Fushuan Wen,et al.Analysis and optimization of the preferences of decision makers in black-start group decision makering[J].IET Generation,Transmission& Distribution,2013,7(1):14-23.
[13]  林济铿,李童飞,赵子明,等.基于熵权模糊综合评价模型的电力系统黑启动方案评估[J].电网技术,2012,36(2):115-120. Lin Jikeng,Li Tongfei,Zhao Ziming,et al.Assessment on power system black-start schemes based onentropy-weighted fuzzy comprehensive evaluation model[J].Power System Technology,2012,36(2):115-120(in Chinese).
[14]  顾雪平,赵书强,刘艳,等.一个实用的电力系统黑启动决策支持系统[J].电网技术,2004,28(9):54-58. Gu Xueping,Zhao Shuqiang,Liu Yan,et al.A practical decision support system for power system black start[J].Power System Technology,2004,28(9):54-58(in Chinese).
[15]  赵子明,幺莉,林济铿,等.黑启动辅助决策支持系统[J].中国电力,2012,45(5):81-86. Zhao Ziming,Yao Li,Lin Jikeng,et al.Black start decision support system[J].Electric Power,2012,45(5):81-86(in Chinese).
[16]  Hou Yunhe,Liu Chenching,Sun Kai,et al.Computation of milestones for decision support during system restoration[J].IEEE Trans on Power Systems,2011,26(3):1399-1408.
[17]  Chou Yiting,Liu Chihwen,Wang Yijen,et al.Development of a black start decision supporting system for isolated power systems[J].IEEE Trans on Power Systems,2013,28(3):2202-2210.
[18]  吴涛,郭嘉阳,李华伟.华北电网利用十三陵 抽水蓄能电厂水电机组进行黑启动的试验研究[J].电网技术,2001,25(3):56-58. Wu Tao,Guo Jiayang,Li Huawei.Investigation of black start for North China power system by Shisanling hydroelectric generating sets[J].Power System Technology,2001,25(3):56-58(in Chinese).
[19]  林济铿,么莉,孟宪朋,等.天津电网黑启动试验研究[J].电网技术,2008,32(5):55-58. Lin Jikeng,Yao Li,Meng Xianpeng,et al.Test research of black start of Tianjin power grid[J].Power System Technology,2008,32(5):55-58(in Chinese).
[20]  阮前途,王伟,黄玉,等.基于燃机机组的上海电网黑启动系列试验[J].电网技术,2006,30(2):19-22. Ruan Qiantu,Wang Wei,Huang Yu,et al.A series of black start tests based on gas turbine generators in Shanghai power grid[J].Power System Technology,2006,30(2):19-22(in Chinese).
[21]  逯怀东,郭志红,王辉,等.基于500kV网架的电网黑启动试验分析[J].电网技术,2013,37(7):1895-1901. Lu Huaidong,Guo Zhihong,Wang Hui,et al.Power system black start analysis based on 500kV power grid[J].Power System Technology,2013,37(7):1895-1901(in Chinese).
[22]  顾雪平,钟慧荣,贾京华,等.电力系统扩展黑启动方案的研究[J].中国电机工程学报,2011,31(28):25-32.
[23]  Gu Xueping,Zhong Huirong,Jia Jinghua,et al.Extended black-start schemes of power systems[J].Proceedings of the CSEE,2011,31(28):25-32(in Chinese).
[24]  王亮,刘艳,顾雪平,等.综合考虑节点重要度和线路介数的络重构[J].电力系统自动化,2010,34(12):29-33. Wang Liang,Liu Yan,Gu Xueping,et al.Skeleton network reconfiguration based on node importance and line betweenness[J].Automation of Electric Power Systems,2010,34(12):29-33(in Chinese).
[25]  刘思峰,郭天榜,党耀国,等.灰色系统理论及其应用[M].北京:科学出版社,2000:49-55.
[26]  黄振芳,刘昌明.基于博弈论综合权重模糊优选模型在地下水环境风险评价中的应用[J].水文,2010,30(4):13-17. Huang Zhenfang,Liu Changming.A fuzzy optimization model based on comprehensive weight calculated with game theory and its application in environment risk assessment of groundwater system[J].Journal of China Hydrology,2010,30(4):13-17(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133