电网技术  2014 

配网故障情况下电动汽车换电站V2G运行的主动控制策略

DOI: 10.13335/j.1000-3673.pst.2014.04.016, PP. 925-932

Keywords: 电动汽车换电站,V2G,短路故障,馈线自动化,主动控制策略

Full-Text   Cite this paper   Add to My Lib

Abstract:

为减小电动汽车换电站V2G运行给配电网保护和自动化配置带来的影响,首先分析了换电站V2G运行对基于馈线终端单元(feederterminalunit,FTU)的馈线自动化和重合器-熔断器配合的馈线自动化故障处理过程的影响,然后根据造成影响的根本原因提出了换电站主动控制策略。该策略由2部分组成,一为换电站在架空线路和电缆线路配电网中的故障判别与应对策略,二为配电网故障情况下换电站中所有充放电机的协调控制策略。基于PSCAD软件搭建了馈线自动化仿真模型,并仿真分析了换电站采用主动控制策略时对馈线自动化的影响。结果表明,换电站主动控制策略有效减小了配电网故障期间换电站的输出电流,解决了基于FTU的馈线自动化系统中重合器重合闸失败和故障区域判断错误问题,以及重合器-熔断器配合的馈线自动化系统中配合失效的问题,且在各种故障情况下控制特性较好。

References

[1]  张文亮,武斌,李武峰,等.我国纯电动汽车的发展方向及能源供给模式的探讨[J].电网技术,2009,33(4):1-5.Zhang Wenliang,Wu Bin,Li Wufeng,et al.Discussion on development trend of battery electric vehicles in China and its energy supply mode[J].Power System Technology,2009,33(4):1-5(in Chinese).
[2]  田文奇,和敬涵,姜久春,等.基于自适应变异粒子群算法的电动汽车换电池站充电调度多目标优化[J].电网技术,2012,36(11):25-29.Tian Wenqi,He Jinghan,Jiang Jiuchun,et al.Multi-objective optimization of charging dispatching for electric vehicle battery swapping station based on adaptive mutation particle swarm optimization[J].Power System Technology,2012,36(11):25-29(in Chinese).
[3]  刘晓飞,张千帆,崔淑梅.电动汽车V2G技术综述[J].电工技术学报,2012,27(2):121-127.Liu Xiaofei,Zhang Qianfan,Cui Shumei.Review of electric vehicle V2G technology[J].Transactions of China Electrotechnical Society,2012,27(2):121-127(in Chinese).
[4]  樊英,张丽,薛钟兵,等.基于V2G的无功功率补偿技术[J].电网技术,2013,37(2):307-311.Fan Ying,Zhang Li,Xue Zhongbing,et al.Reactive compensation technology based on vehicle to grid[J].Power System Technology,2013,37(2):307-311(in Chinese).
[5]  Funmilayo H B,Buyler-Purry K.L.An approach to mitigate the impact of distributed generation on the overcurrent protection scheme for radial feeders[C]//IEEE Power Systems Conference and Exposition.Seattle:IEEE,2009:1-11.
[6]  Uthitsunthorn D,Kulworawanichpong T.Distance protection of a renewable energy plant in electric power distribution systems[C]// International Conference on Power System Technology.Hangzhou:IEEE,2010:1-6.
[7]  孙景钌,李永丽,李盛伟,等.含分布式电源配电网保护方案[J].电力系统自动化,2009,33(1):81-89.Sun Jingliao,Li Yongli,Li Shengwei,et al.Optimal deployment of distributed generation as backup generators[J].Automation of Electric Power Systems,2009,33(1):81-89(Chinese).
[8]  Wan H,Li K K,Wong K P.An adaptive multiagent approach to protection relay coordination with distributed generators in industrial power distribution system[J].IEEE Transactions on Industry Applications,2010,46(5):2118-2124.
[9]  Javadian S A M,Tamizkar R,Haghifam M R.A protection and reconfiguration scheme for distribution networks with DG[C]// Power Tech.Bucharest:IEEE,2009:1-8.
[10]  马静,王希,米超,等.含分布式电源的配电网自适应保护新方法[J].电网技术,2011,35(10):204-208.Ma Jing,Wang Xi,Mi Chao,et al.A new adaptive protection approach for distribution network containing distributed generation[J].Power System Technology,2011,35(10):204-208(in Chinese).
[11]  El-Khattam W,Sidhu T S.Restoration of directional overcurrent relay coordination in distributed generation systems utilizing fault current limiter[J].IEEE Transactions on Power Delivery,2008,23(2):576-585.
[12]  Yamaguchi H,Kataoka T.Current limiting characteristics of transformer type superconducting fault current limiter with shunt impedance and inductive load[J].IEEE Transactions on Applied Superconductivity,2008,18(2):668-671.
[13]  Zhang Y,Dougal R A.Novel dual-FCL connection for adding distributed generation to a power distribution utility[J].IEEE Transactions on Applied Superconductivity,2011,21(3):2179-2183.
[14]  Chaitusaney S,Yokoyama A.Prevention of reliability degradation from recloser-fuse miscoordination due to distributed generation[J].IEEE Transactions on Power Delivery,2008,23(4):2545-2554.
[15]  陶顺,郭静,肖湘宁.基于电流保护原理的DG准入容量与并网位置分析[J].电网技术,2012,36(1):265-270.Tao Shun,Guo Jing,Xiao Xiangning.Analysis on allowed penetration level of distributed generation and its grid-connected position based on principles of current protection[J].Power System Technology,2012,36(1):265-270(in Chinese).
[16]  夏成军,崔弘,王强,等.考虑静态安全约束的分布式电源准入容量计算[J].电网技术,2009,33(16):96-100.Xia Chengjun,Cui Hong,Wang Qiang,et al.Penetration capacity calculation for distributed generation considering static security constraints[J].Power System Technology,2009,33(16):96-100(in Chinese).
[17]  苏小玲,韩民晓,赵正奎,等.配电网中分布式电源最大准入容量分析[J].电网技术,2012,36(10):87-92.Su Xiaoling,Han Minxiao,Zhao Zhengkui,et al.Research on maximum capacity of grid-connected distributed generation in distribution network[J].Power System Technology,2012,36(10):87-92(in Chinese).
[18]  Brahma S M,Girgis A A.Development of adaptive protection scheme for distribution systems with high penetration of distributed generation[J].IEEE Transactions on Power Delivery,2004,19(1):56-63.
[19]  IEEE 1547-2003,IEEE standard for interconnecting distributed resources with electric power system[S].2003.
[20]  沈阳武,彭晓涛,孙元章.背靠背双PWM变流器的协调控制策略[J].电网技术,2012,36(1):146-152.Shen Yangwu,Peng Xiaotao,Sun Yuanzhang.Study on cooperative control strategies of back-to-back dual-PWM converter[J].Power System Technology,2012,36(1):146-152(in Chinese).
[21]  郭文杰,林飞,郑琼林.三相电压型PWM整流器的级联式非线性PI控制[J].中国电机工程学报,2006,26(2):138-142.Guo Wenjie,Lin Fei,Zheng Qionglin.The cascaded nonlinear PI control for three-phase voltage source PWM rectifier[J].Proceedings of the CSEE,2006,26(2):138-142(in Chinese).
[22]  谭甜源,姜齐荣,李刚,等.基于电流跟踪控制的三电平DSTATCOM 装置的控制方法[J].电力系统自动化,2007,31(4):61-65.Tan Tianyuan,Jiang Qirong,Li Gang,et al.Industry application of three-level DSTATCOM based on direct current control strategy[J].Automation of Electric Power Systems,2007,31(4):61-65(in Chinese).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133