周沛洪,赵杰,吕金壮,等. ±800 kV云广DC换流站避雷器布置和参数选择[J]. 高电压技术,2009,35(11):2603-2611. ZHOU Pei-hong,ZHAO Jie,LU Jin-zhuang,et al. Arrester protection scheme and arrester parameters selectionfor±800kV YunGuang UHVDC converter station[J]. High Voltage Engineering,2009,35(11):2603-2611.
[2]
徐近龙. 金属氧化物避雷器现场直流试验的有关问题[J].电气技术,2010(2):95-97. XU Jin-long. The problems of MOA DC test on the field[J]. Electrical Technology,2010(2):95-97.
[3]
吴德贯,梁华洋,刘凡栋,等. 不同安装位置金属氧化物避雷器试验方法[J]. 电瓷避雷器,2012(2):46-50. WU De-guan,LIANG Hua-yang,LIU Fan-dong,et al.Testing Methods of MOA at Different Installed Location [J].Insulators and Surge Arresters,2012(2):46-50.
[4]
秦锟. 金属氧化物避雷器试验综述[J]. 科技资讯,2008(26):212. QIN Kun. The review of MOA test[J]. Science & Technology Information,2008(26):212.
[5]
杨殿成. 金属氧化物避雷器带电测试干扰分析[J]. 高压电器,2009,45(5):130-132. YANG Dian-cheng. Study on interphase interference to on-line measurement of metal oxide arrester[J]. High Voltage Apparatus,2009,45(5):130-132.
[6]
康晓彤. 银川东750 kV变电站避雷器不拆引线直流试验方法[J]. 宁夏电力,2009(4):9-11. KANG Xiao-tong. The DC test method of zinc oxide Lightning arrester without dismantling lead wire in Yinchuan East 750 kV Substation[J]. Ningxia Electric Power,2009(4):9-11.
[7]
孙恒峰,张扬,胥云. 220 kV金属氧化物避雷器不拆高压引线的试验方法[J]. 电瓷避雷器,2009(4):40-42. SUN Heng-feng,ZHANGYang,XU Yun. Method for testing 220 kV MOA without removing the HV lead conductor[J]. Insulators and Surge Arresters,2009(4):40-42.
[8]
周多军. 浅议无间隙金属氧化物避雷器不拆引线的测试方法[J]. 电瓷避雷器,2008(3):42-46. ZHOU Duo-jun. Method of gapless MOA test without removing connecting lead[J]. Insulators and Surge Arresters,2008(3):42-46.
[9]
万四维,李顺尧. 220 kV金属氧化物避雷器不拆线试验方法及误差分析[J]. 电瓷避雷器,2006(6):42-44. WAN Si-wei,LI Shun-yao. Test on 220 kV metal oxide arrestor without removing connecting lead and its error evaluation[J]. Insulators and Surge Arrestors,2006(6):42-44.