Transportation Bureau of Hunan Province.Hunan Province Inland Waterway Transportation Development Planning[R].Changsha:Transportation Bureau of Hunan Province,2011.
Transportation Planning Survey and Design Institute of Hunan Province.Xiangjiang Dayuandu Avionics Construction Drawing Design Project[R].Changsha:Transportation Planning Survey and Design Institute of Hunan Province,1999.
Transportation Planning Survey and Design Institute of Hunan Province.Xiangjiang Zhuzhou Navigation-Power Junction Project in Two Phases Construction Drawing Design[R].Changsha:Transportation Planning Survey and Design Institute of Hunan Province,2003.
Transportation Planning Survey and Design Institute of Hunan Province.Xiangjiang Changsha Comprehensive Hub Two Stage Construction Design[R].Changsha:Transportation Planning Survey and Design Institute of Hunan Province,2010.
[8]
[6]廖鹏.船闸通过能力研究[D].南京.河海大学,2007.
[9]
Liao Peng.Research on Lock Capacity at Inland Waterway Locks[D].Nanjing:Hohai University,2007.
Liao Peng,Zhang Wei.Analytical model for average lockage tonnage of waterway lock[J].Journal of Southeast University :Natural Science,2010,40 (1):207-212.
Transportation Planning Survey and Design Institute of Hunan Province.The Two Phase Project of Xiangjiang 2000 DWT Channel Construction (Hengyang to Zhuzhou) Project Feasibility Study Report[R].Changsha:Transportation Planning Survey and Design Institute of Hunan Province,2013.