Hao Shuliang. Analysis of the collapse risk in highway tunnel based on analytic hierarchy process [J]. Low Temperature Architecture Technology,2012(7):152-154.
Cao Wengui, Zhai Youcheng, Wang Jiangying, et al. Method of set pair analysis for collapse risk during construction of mountain tunnel [J]. China Journal of Highway and Transport,2012,25(2):90-99.
Peng Limin, An Yonglin, Zhang Yunliang, et al. Identification of gas burst in tunnel at the prospecting stage by using extension theory: a case study [J]. China Civil Engineering Journal 2008,41(4):81-85.
Wang Jiayuan,Wang Hongtao.Fuzzy comprehensive evaluation for construction project risks based on uncertainty AHP [J]. Journal of Shenzhen University: Science & Engineering, 2006, 23(1): 48-53.
[11]
[12]李德顺.基于广义集对分析的系统危险性评价研究[D]. 沈阳:东北大学,2010.
[12]
Li Deshun. Research on System Risk Assessment Based on General Set Pair Analysis [D]. Shenyang: Northeastern University,2010.
Chen Jiejin, Zhou Feng, Yang Junsheng, et al. Fuzzy analytic hierarchy process for risk evaluation of collapse during construction of mountain tunnel [J]. Rock and Soil Mechanics,2009,30(8):2365-2370.
Zhou Jiankun, Wu Jian. Fault tree analysis of the collapse risk in rock highway tunnel [J]. Chinese Journal of Underground Space and Engineering,2008,4(6):991-998.
Zhang Sheng, Chen Xiuhe, Wang Bo, et al. Collapse risk evaluation and its control measures for Mingtangshan tunnel [J]. Chinese Journal of Underground Space and Engineering,2012,8(S1):1567-1570,1620.
Ministry of Transport of the People’s Republic of China. The notification about implementing security risk assessment system of highway bridge and tunnel engineering in preliminary design stage (Highway Administration Bureau of Ministry of Transport, No. 175 [Z]. [EB/OL].[2010-12-04]. http://xxgk.ganxian.gov.cn/bmgkxx/jtj/fgwj/gfxwj/201012/t20101204_56342.htm.
[22]
Zhao Keqin.Set Pair Analysis and Its Preliminary Application [M].Hangzhou: Zhejiang Science and Technology Press,2000.