优化计算在拱桥液压同步提升转体施工控制中的应用

, PP. 74-78

Keywords: 桥梁工程,拱桥,一阶最优化计算理论,液压同步提升,转体施工,索力

Full-Text   Cite this paper   Add to My Lib

Abstract:

?根据一阶最优化计算理论,构建了采用液压同步提升技术进行转体施工拱桥的优化有限元模型。指定各吊点提升索力大小为设计变量,将结构物特定点的空间坐标设为目标函数,液压同步提升技术的控制要求则设为约束条件,通过对目标函数的优化处理,求解各竖转角度下的结构受力,并通过算例和现场试验予以验证。结果表明:该方法能有效节省计算工作量,在采用转体技术施工的桥梁施工控制中有着广泛的工程应用前景。

References

[1]  LI Xin-qing, WU Jian-zhong.Engineering Application of Hydraulic Synchronous Lifting Technique[J].Construction Machinery and Equipment, 1997, 34(9):22-24.
[2]  WU Jian-zhong, XU Ming-qian.Review and Prospect of Hydraulic Sync Elevation Technology[J]. Journal of Tongji University:Natural Science, 1997, 25(2):230-233.
[3]  卞永明, 乌建中.液压同步提升中的同一提升器中钢绞线负载均衡分析[J].建筑机械, 1997, 17(8):20-22.
[4]  张治成, 叶贵如, 王云峰.大跨度拱桥钢管拱肋悬拼中的扣索索力优化计算[J].中国市政工程, 2003, 20(4):25-27.
[5]  张建民, 肖汝诚.千米级斜拉桥施工过程中的索力优化与线形控制研究[J].土木工程学报, 2005, 38(7):54-60.
[6]  沈蒲生, 方 辉, 夏心红, 等.考虑施工过程和收缩徐变的框架结构简化分析[J].建筑科学与工程学报, 2006, 23(2):41-45.
[7]  高 剑, 裴岷山.大跨度斜拉桥索梁锚箱空间受力分析[J].建筑科学与工程学报, 2006, 23(3):66-70.
[8]  方 建, 王箭明, 陈晓辉.青干河大桥主拱空管吊装过程的索力逆分析和优化[J].钢结构, 2003, 18(6):40-42.
[9]  汪劲丰, 施笃铮, 徐 兴.确定斜拉桥最优恒载索力方法的探索[J].浙江大学学报:工学版, 2002, 36(2):152-155.
[10]  郭彦林, 郭宇飞, 刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报, 2007, 24(1):52-58.
[11]  张联燕, 程懋方, 谭邦明, 等.桥梁转体施工[M].北京:人民交通出版社, 2003.
[12]  李欣青, 乌建中.液压同步提升技术的工程应用[J].工程机械, 1997, 34(9):22-24.
[13]  乌建中, 徐鸣谦.液压同步提升技术回顾与展望[J].同济大学学报:自然科学版, 1997, 25(2):230-233.
[14]  BIAN Yong-ming, WU Jian-zhong.The Load Balancing Analysis of Steel Stranded Wires in the Same Lifting Device in Hydraulic Synchronous Lifting[J].Construction Machinery, 1997, 17(8):20-22.
[15]  ZHANG Zhi-cheng, YE Gui-ru, WANG Yun-feng.Optimal Computation on Cable Force in Suspension Erection of Arch Ribs Made of Steel Tube for Large Spanned Arch Bridge[J]. China Municipal Engineering, 2003, 20(4):25-27.
[16]  ZHANG Jian-min, XIAO Ru-cheng.Cable Force Optimization and Linetype Control for the Construction of a Thousandmeter Scale Cablestayed Bridge[J]. China Civil Engineering Journal, 2005, 38(7):54-60.
[17]  SHEN Pu-sheng, FANG Hui, XIA Xin-hong, et al.Simplified Analysis for Frame Structure Considering Construction Process, Shrinkage and Creep[J].Journal of Architecture and Civil Engineering, 2006, 23(2):41-45.
[18]  GAO Jian, PEI Min-shan.Analysis of Space Stress in Anchoring Box Between Cable and Beam of Long-span Cable-stayed Bridge[J].Journal of Architecture and Civil Engineering, 2006, 23(3):66-70.
[19]  FANG Jian, WANG Jian-ming, CHEN Xiao-hui.The Static Inverse Analysis and Optimization During Hoisting Hollow Pipes of Main Arch for the Qinggan River Bridge[J]. Steel Construction, 2003, 18(6):40-42.
[20]  WANG Jing-feng, SHI Du-zheng, XU Xing.Exploration of the Optimal Cable Tension of Cable-stayed Bridge Under Permanentloads[J]. Journal of Zhejiang University:Engineering Science, 2002, 36(2):152-155.
[21]  GUO Yan-lin, GUO Yu-fei, LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering, 2007, 24(1):52-58.
[22]  ZHANG Lian-yan, CHENG Mao-fang, TAN Bang-ming, et al.Bridge Rotation Construction Technique[M].Beijing:China Communications Press, 2003.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133