Herroelen W, Leus R. Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 2005, 165(2): 289-306
[2]
Kobylański P, Kuchta D. A note on the paper by M. A. Al-Fawzan and M. Haouari about a bi-objective problem for robust resource-constrained project scheduling. International Journal of Production Economics, 2007, 107(2): 496-501
[3]
Tavares L V, Ferreira J A A, Coelho J S. On the optimal management of project risk. European Journal of Operational Research, 1998, 107(2): 451-469
[4]
Vonder S, Demeulemeester E, Herroelen W, Leus R. The use of buffers in project management: the trade-off between stability and makespan. International Journal of Production Economics, 2005, 97(2): 227-240
[5]
Liu Shi-Xin, Song Jian-Hai, Tang Jia-Fu. Approach for setting time buffers in resources-constrained project scheduling. Journal of Systems Engineering, 2006, 21(4): 381-386(刘士新, 宋健海, 唐加福. 资源受限项目调度中缓冲区的设定方法. 系统工程学报, 2006, 21(4): 381-386)
[6]
Vonder S, Demeulemeester E, Herroelen W. Proactive heuristic procedures for robust project scheduling: an experimental analysis. European Journal of Operational Research, 2008, 189(3): 723-733
[7]
Leus R, Herroelen W. The complexity of machine scheduling for stability with a single disrupted Job. Operations Research Letters, 2005, 33(2): 151-156
[8]
Kolisch R, Sprecher A. PSPLIB ——a project scheduling problem library: OR software ——ORSEP operations research software exchange program. European Journal of Operational Research, 1997, 96(1): 205-216
[9]
Brucker P, Drexl A, M?hring A, Neumann K, Pesch E. Resource-constrained project scheduling: notation, classification, models, and methods. European Journal of Operational Research, 1999, 112(1): 3-41
[10]
Al-Fawzan M A, Haouari M. A bi-objective model for robust resource-constrained project scheduling. International Journal of Production Economics, 2005, 96(2): 175-187
[11]
Lambrechts O, Demeulemeester E, Herroelen W. A tabu search procedure for developing robust predictive project schedules. International Journal of Production Economics, 2008, 111(2): 493-508
[12]
Herroelen W, Leus R. The construction of stable project baseline schedules. European Journal of Operational Research, 2004, 156(3): 550-565
[13]
Vonder S, Demeulemeester E, Hemeulemeester W, Leus R. The trade-off between stability and makespan in resource-constrained project scheduling. International Journal of Production Research, 2006, 44(2): 215-236
[14]
Liu Shi-Xin, Song Jian-Hai, Tang Jia-Fu. Critical chain based approach for resource-constrained project scheduling. Acta Automatica Sinica, 2006, 32(1): 60-66(刘士新, 宋健海, 唐加福. 基于关键链的资源受限项目调度新方法. 自动化学报, 2006, 32(1): 60-66)
[15]
Lambrechts O, Demeulemeester E, Herroelen W. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. Journal of Scheduling, 2008, 11(2): 121-136
[16]
Wang Xiao-Qing, Tang Jia-Fu, Han Yi. Advances in SCAtter search. Journal of System Simulation, 2009, 21(11): 3155-3160(王晓晴, 唐加福, 韩毅. 分散搜索算法研究进展. 系统仿真学报, 21(11): 3155-3160)
[17]
Herroelen W, Leus R. Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 2004, 42(8): 1599-1620