[1] | 孙元章,吴俊,李国杰. 风力发电对电力系统的影响[J]. 电网技术, 2007,31(20):55-62. Sun Yuanzhang,Wu Jun,Li Guojie.Influence research of wind power generation on power systems[J].Power System Technology,2007,31(20)
|
[2] | 雷亚洲. 与风电并网相关的研究课题[J]. 电力系统自动化, 2003,27(8):84-89. Lei Yazhou.Studies on wind farm integration into power system[J].Automation of Electric Power Systems,2003,27(8)
|
[3] | 国家电网公司. Q/GDW 392-2009 风电场接入电网技术规定[S]. 北京:中国电力出版社, 2009.State Grid Corporation of China.Q/GDW 392-2009 Technical rule for connecting wind farm into power grid[S].Beijing:ChinaElectric Power Press,2009(in Chinese).
|
[4] | 国家电网公司. Q/GDW 432-2010 风电调度运行管理规范[S]. 北京:中国电力出版社, 2010.State Grid Corporation of China.Q/GDW 432-2010 Specification of dispatching and operating management for wind power[S].Beijing:ChinaElectric Power Press,2010(in Chinese).
|
[5] | Anca D H,Poul S,Florin I,et al. Centralized power control of wind farm with doubly fed induction generators [J]. Renewable Energy, 2006,31(7):935-951.
|
[6] | 惠晶,顾鑫. 大型风电场的集中功率控制策略研究[J]. 华东电力, 2008,36(6):57-62. Hui Jing,Gu Xin.Research on centralized power control strategies for large wind farms[J].East China Electric Power,2008,36(6)
|
[7] | 黄崇鑫,张凯锋,戴先中,等. 考虑DFIG机组容量限制的风电场功率分配方法[J]. 电力系统保护与控制, 2010,38(21):202-207. Huang Chongxin,Zhang Kaifeng,Dai Xianzhong,et al.A power distribution method for a wind farm considering the limitations of rated capacity of DFIG units[J].Power System Protection and Control,2010,38(21)
|
[8] | 冯双磊,王伟胜,刘纯,等. 风电场功率预测物理方法研究[J]. 中国电机工程学报, 2010,30(2):1-6. Feng Shuanglei,Wang Weisheng,Liu Chun,et al.Study on the physical approach to wind power prediction [J].Proceedings of the CSEE,2010,30(2)
|
[9] | 杨秀媛,肖洋,陈树勇. 风电场风速和发电功率预测研究[J]. 中国电机工程学报, 2005,25(11):1-5. Yang Xiuyuan,Xiao Yang,Chen Shuyong.Wind speed and generated power forecasting in wind farm [J].Proceedings of the CSEE,2005,25(11)
|
[10] | Cameron W P,Negnevitsky M. Very short- term wind forecasting for tasmanian power generation[J]. IEEE Trans. on Power Systems, 2006,21(2):965-972.
|
[11] | 国家电网公司. Q/GDW 588-2011 风电功率预测功能规范[S]. 北京:中国电力出版社, 2011.State Grid Corporation of China.Q/GDW 588-2011 Function specification of wind power forecasting [S].Beijing:ChinaElectric Power Press,2011(in Chinese).
|
[12] | 陈宁,于继来. 基于电气剖分信息的风电系统有功调度与控制[J]. 中国电机工程学报, 2008,28(16):51-58. Chen Ning,Yu Jilai.Active power dispatch and regulation of wind power system based on electrical dissecting information of electric power network[J].Proceedings of the CSEE,2008,28(16)
|
[13] | Moyano C F,Lopes J A P. An optimization approach for wind turbine commitment and dispatch in a wind park[J]. Electric Power Systems Research, 2009,79(1):71-79.
|
[14] | 刘伟. 风电场集群优化调度研究[D]. 北京:北京交通大学, 2011.Liu Wei.Study on optimum dispatching of wind farm clusters[J].Beijing:BeijingJiaotong University,2011(in Chinese).
|
[15] | 谷峰. 基于双馈机组风电场的功率控制研究[D]. 济南:山东大学, 2009.Gu Feng.Power control of wind farm based on doubly-fed generators[D].Jinan:ShandongUniversity,2009(in Chinese).
|
[16] | 林成武,王凤翔,姚兴佳. 变速恒频双馈风力发电机励磁控制技术研究[J]. 中国电机工程学报, 2003,23(11):122-125. Lin Chengwu,Wang Fengxiang,Yao Xingjia.Study on excitation control of VSCF double fed wind power generator[J].Proceedings of the CSEE,2003,23(11)
|
[17] | 高宗和,滕贤亮. 适应大规模风电接入的互联电网有功调度与控制方案[J]. 电力系统自动化, 2010,34(17):37-41. Gao Zonghe,Teng Xianliang.Solution of active power dispatch and control scheme for interconnected power grids with large-scale wind power integration [J].Automation of Electric Power Systems,2010,34(17)
|
[18] | 米增强,苏勋文,杨奇逊. 风电场动态等值模型的多机表征方法[J]. 电工技术学报, 2010,25(5):162-169. Mi Zengqiang,Su Xunwen,Yang Qixun.Multi-machine representation method for dynamic equivalent model of wind farms[J].Transactions of China Electrotechnical Society,2010,25(5)
|