Pereira M V F,Balu N J.Composite generation/ transmission reliability evaluation[J].Proceedings of the IEEE,1992,80(4):470-491.
[2]
Subcommittee P M.IEEe reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,PAS-98(6):2047-2054.
[3]
Li S,Dai C,Zhu Y.Short-term reliability equivalence algorithm for flexible transmission equipment[J].International Journal of Electrical Power and Energy Systems,2012,43(1):427-432.
[4]
冯永青,吴文传,孙宏斌,等.现代能量控制中心的运行风险评估研究初探[J].中国电机工程学报,2005,25(13):73-79.Feng Yongqing,Wu Wenchuan,Sun Hongbin,et al.A preliminary investigation on power system operational risk evaluation in the modern eenergy control center[J].Proceedings of the CSEE,2005,25(13):73-79(in Chinese).
[5]
Ubeda J R,Allan R N.Sequential simulation applied to composite system reliability evaluation[J].Generation,Transmission and Distribution,IEE Proceedings C,1992,139(2):81-86.
[6]
孙荣富,Singh C,程林,等.瞬时状态概率和方差减少技术在短期可靠性评估中的应用[J].中国电机工程学报,2009,29(28):47-54.Sun Rongfu,Singh C,Chenglin,et al.Application of the transient state probability and variance reduction method in the short-term reliability assessment[J].Proceedings of the CSEE,2009,29(28):47-54(in Chinese).
[7]
Sun Rongfu,Singh Chanan,Chenglin,et al.Short-term reliability evaluation using control variable based dagger sampling method[J].Electric Power Systems Research,2010,80(6):682-689.
[8]
He J,Sun Y,Kirschen D S,et al.State-space partitioning method for composite power system reliability assessment[J].Generation,Transmission Distribution,IET,2010,4(7):780-792.
[9]
Liu H,Sun Y,Wang P,et al.A novel state selection technique for power system reliability evaluation[J].Electric Power Systems Research,2008,78(6):1019-1027.
[10]
Bie Z,Wang X.Studies on variance reduction technique of Monte Carlo simulation in composite system reliability evaluation[J].Electric Power Systems Research,2002,63(1):59-64.
[11]
Pindoriya N M,Jirutitijaroen P,Srinivasan D,et al.Composite reliability evaluation using Monte Carlo simulation and least squares support vector classifier[J].IEEE Transactions on Power Systems,2011,26(4):2483-2490.
[12]
Da Silva A M L,Fernandez R A G.,Singh C.Generating capacity reliability evaluation based on Monte Carlo simulation and cross-entropy methods[J].IEEE Transactions on Power Systems,2010,25(1):129-137.
[13]
De Boer P T,Kroese D P,Mannor S,et al.A tutorial on the cross-entropy method[J].Annals of Operations Research,2005,134(1):19-67.
[14]
Ubeda J R,Allan R N.Sequential simulation applied to composite system reliability evaluation[J].Generation,Transmission and Distribution,IEE Proceedings C,1992,139(2):81-86.
[15]
Hua Bowen,Bie Zhaohong,Liu Cong,et al.Eliminating redundant line flow constraints in composite system reliability evaluation[J].IEEE Transacrions on Power Systems,2013,28(3):3490-3498.
[16]
Leite Da Silva A M,Da Fonseca Manso L A,De Oliveira Mello J C,et al.Pseudo-chronological simulation for composite reliability analysis with time varying loads[J].IEEE Transactions on Power Systems,2000,15(1):73-80.
[17]
GE H F,Asgarpoor S.Parallel Monte Carlo simulation for reliability and cost evaluation of equipment and systems[J].Electric Power Systems Research,2011,81(2):347-356.
[18]
Gonzalez-Fernandez R A,Da Silva A M L.Reliability assessment of time-dependent systems via sequential cross-entropy Monte Carlo simulation[J].IEEE Transactions on Power Systems,2011,26(4):2381-2389.
[19]
De Boer P-T,Ecuyer P L,Rubino G,et al.Estimating the probability of a rare event over a finite time horizon[C]//Proceedings of the 39th Conference on Winter Simulation.Washington D.C.:IEEE Press,2007:403-411.
[20]
Rubino G,Tuffin B.Rare event simulation using Monte Carlo methods[M].United Kingdom:John Wiley Sons Ltd.,2009:28-30.