U.S.-Canada Power Force.Final report on the August 14th blackout in the United States and Canada:causes and recommendations[R].Washington D.C.:U.S.-Canada Power Force,2004.
[2]
Union for the Coordination of the Transmission of Electricity.Final report of the Investigation Committee on the 28 September 2003 Blackout in Italy[R].Brussels:UCTE,2004.
[3]
华中电网.华中电网“7.1”事故调查报告技术报告[R].武汉:华中电网事故调查组技术组,2007.Central China Power Grids.Report on the July 1st Central China Power Grids[R].Wuhan:Fault investigation Group of Central China Power Grids,2007(in Chinese).
[4]
Union for the Coordination of the Transmission of Electricity.Final report on system disturbance on 4 November 2006[R].Brussels:UCTE,2007.
[5]
汤涌,卜广全,易俊.印度“7.30”、“7.31”大停电事故分析及启示[J].中国电机工程学报,2012,32(25):167-174.Tang Yong,Bu Guangquan,Yi Jun.Analysis and lessons of the blackout in indian power grid on July 30 and 31,2012[J].Proceedings of the CSEE,2012,32(25):167-174(in Chinese).
[6]
Horowitz S H,Phadke A G.Third zone revisited[J].IEEE Transactions on Power Delivery,2006,21(1):23-29.
[7]
董新洲,丁磊,刘琨,等.基于本地信息的系统保护[J].中国电机工程学报,2010,30(22):7-13.Dong Xinzhou,Ding Lei,Liu Kun,et al.System protection based on local information[J].Proceedings of the CSEE,2010,30(22):7-13(in Chinese).
[8]
Novosel D,Bartok G,Henneberg G,et al.IEEE PSRC report on performance of relaying during wide-area stressed conditions[J].IEEE Transactions on Power Delivery,2010,25(1):3-16.
[9]
周泽昕,王兴国,杜丁香,等.过负荷状态下保护与稳定控制协调策略[J].中国电机工程学报,2013,33(28):146-153.Zhou Zexing,Wang Xingguo,Du Dingxiang,et al.A coordination strategy between relay protection and stability control in over load condition[J].Proceedings of CSEE.2013,33(28):146-153(in Chinese).
[10]
徐慧明,毕天妹.基于广域同步测量系统的预防连锁跳闸控制策略[J].中国电机工程学报,2007,27(19):32-38.Xu Huiming,Bi Tianshu.Study on wide area measurement system based control strategy to prevent cascading trips[J].Proceedings of the CSEE,2007,27(19):32-38(in Chinese).
[11]
杨文辉.预防连锁跳闸的关键线路后备保护与紧急控制策略研究[D].北京:华北电力大学,2012.Yang Wenhui.A study on backup protection and control strategy for critical lines against cascading trips[D].Beijing:North China Electric Power University,2012(in Chinese).
[12]
曾凯文,文劲宇,程时杰,等.复杂电网连锁故障下的关键线路辨识[J].中国电机工程学报,2014,34(7):1103-1112.Zeng Kaiwen,Wen Jinyu,Cheng Shijie,et al.Critical line identification of complex power system in cascading failure[J].Proceedings of the CSEE,2014,34(7):1103-1112(in Chinese).
[13]
林湘宁,夏文龙,熊玮,等.不受潮流转移影响的距离后备保护动作特性自适应调节研究[J].中国电机工程学报,2011,31(s):83-87.Lin Xiangning,Xia Wenlong,Xiong Wei,et al.Study of adaptive adjustment of operation characteristics of distance backup protection immune to the impact of power flow transferring[J].Proceedings of the CSEE,2011,31(s):83-87(in Chinese).
[14]
谷松林,王增平,马静.基于保护关联域的防连锁跳闸策略[J].中国电机工程学报,2013,33(31):155-161.Gu Songlin,Wang Zengping,Ma Jing.Control strategy to prevent cascading trips based on related protection area[J].Proceedings of the CSEE,2013,33(31):155-161(in Chinese).
[15]
朱晓彤,赵青春.防止过负荷时相间距III段保护误动的新方法[J].电力系统保护与控制,2011,39(9):7-11.Zhu Xiaotong,Zhao Qingchun.A new method to prevent maloperation of phase-to-phase zone III relays due to overload[J].Power System Protection and Control,2011,39(9):7-11(in Chinese).
[16]
柳焕章,周泽昕.线路距离保护应对事故过负荷的策略[J].中国电机工程学报,2011,31(25):112-117.Liu Huanzhang,Zhou Zexin.Post-fault overload mal-operation countermeasure of transmission line distance protection[J].Proceedings of the CSEE,2011,31(25):112-117(in Chinese).
[17]
徐岩,吕彬,王增平.基于广域测量系统的潮流转移识别方法[J].中国电机工程学报,2013,33(28):154-160.Xu Yan,Lü Bin,Wang Zengping.A power flow transfer identification scheme based on WAMS[J].Proceedings of the CSEE,2013,33(28):154-160(in Chinese).
[18]
刘琨,董新洲,王宾,等.故障动态过程对潮流转移识别的影响分析[J].电力系统自动化,2011,35(13):31-36.Liu Kun,Dong Xinzhou,Wang Bin,et al.Analysis for impact of fault dynamic process on flow transferring identification[J].Automation of Electric Power Systems,2011(13),31-36(in Chinese).
[19]
刘琨,董新洲,王宾,等.基于本地信息的潮流转移识别[J].电力系统自动化,2011,35(14):80-86.Liu Kun,Dong Xinzhou,Wang Bin,et al.Flow transferring identification based on local information[J].Automation of Electric Power Systems,2011,35(14):80-86(in Chinese).
[20]
Vu K,Begovic M M.Use of local measurements to estimate voltage-stability margin[J].IEEE Transactions on Power Systems,1997,14(3):1029-1035.