钟定珠.500 kV惠汕线路采用复合绝缘外套避雷器的研究[J].高电压技术,1999,25(1):53-55. Zhong Dingzhu.Study on using the polymetic insulating overcoat arresters on 500 kV lines[J].High Voltage Engineering,1999,25(1):53-55(in Chinese).
[2]
邓军波,李琥,施围.110 kV线路型金属氧化物避雷器的参数优化[J].高电压技术,2002,28(2):13-14. Deng Junbo,Li Hu,Shi Wei.Optimization of MOA's parameters used in 110 kV transmission lines[J].High Voltage Engineering,2002,28(2):13-14(in Chinese).
[3]
沈海滨,陈维江,张少军,等.一种防止10 kV架空绝缘导线雷击断线用新型串联间隙金属氧化物避雷器[J].电网技术,2007,31(3):64-67. Shen Haibin,Chen Weijiang,Zhang Shaojun,et al.A new metal oxide surge arrester with series gap for preventing breakage of 10 kV overhead insulated conductors caused by lightning stroke[J].Power System Technology,2007,31(3):64-67(in Chinese).
[4]
沈海滨,陈维江,王立天,等.城市轨道交通接触网带间隙避雷器的应用[J].电气化铁道,2010(5):42-45. Shen Haibin,Chen Weijiang,Wang Litian,et al.Application of metal oxide surge arrester with series gap on overhead contact system in urban mass transit [J].Electric Railway,2010(5):42-45(in Chinese).
[5]
陈维江,孙昭英,李国富,等.110kV和220kV架空线路并联间隙防雷保护研究[J].电网技术,2006,30(13):70-75. Chen Weijiang,Sun Zhaoying,Li Guofu,et al.Development of parallel gap lightning protection device for 110 kV and 220 kV overhead lines[J].Power System Technology,2006,30(13):70-75(in Chinese).
[6]
罗真海,陈勉,陈维江,等.110、220 kV架空输电线路复合绝缘子并联间隙防雷保护研究[J].电网技术,2002,26(10):41-47. Luo Zhenhai,Chen Mian,Chen Weijiang,et al.Study on shunt gap lightning protection for 110 kV and 220 kV composite insulators[J].Power System Technology,2002,26(10):41-47(in Chinese).
张慎.沪宁区间接触网雷害分析及防雷措施改进建议[J].上海铁道科技,2011(4):103-104. Zhang Shen.Analysis on lightning accidents and suggessions for improvement of lightning protection measures of overhead contact system in Shanghai-Nanjing railway[J].Shanghai Railway Science & Technology,2011(4):103-104(in Chinese).
[9]
苏冬冬.京沪高铁接触网防雷问题的探讨[J].上海铁道科技,2011(4):52-53. Su Dongdong.Discussions on lightning protection of overhead contact system in Beijing-Shanghai high-speed railway[J].Shanghai Railway Science & Technology,2011(4):52-53(in Chinese).
[10]
铁道部.TB 10009-2005 铁路电力牵引供电设计规范[S].北京:中国铁道出版社,2005. The ministry of railways of the People?s Republic of China.TB 10009-2005 Design code of electric traction feeding[S].Beijing:China Railway Publishing House,2005(in Chinese).
[11]
铁道部.铁建设
[12]
39号 铁路防雷、电磁兼容及接地工程技术暂行规定[S].北京:中国铁道出版社,2007. The ministry of railways of the People?s Republic of China.Railway construction
[13]
Document No 39 Provisional rules of railway lightning protection, EMC and grounding engineering [S].Beijing:China Railway Publishing House,2007(in Chinese).
[14]
沈海滨,边凯.接触网雷电过电压分布和闪络概率研究[R].北京:中国电力科学研究院,2012. Shen Haibin,Bian Kai.Study on lightning overvoltage distribution and flashover rate of catenary[R].Beijing:China Electric Power Research Institute,2012.
[15]
车文俊.有串联间隙及并联电阻的金属氧化物避雷器设计中的几个问题[J].电瓷避雷器,1997(2):33-35. Che Wenjun.Several problems in design of metal oxide arrester with series gap and parallel resistor[J].Insulators and Surge Arresters,1997(2):33-35(in Chinese).
[16]
刘青花,章福林.500 kV带串联间隙复合绝缘子避雷器的研制[J].华北电力技术,2001(10):37-38,41. Liu Qinghua,Zhang Fulin.Development of 500 kV compound insulating series gap arrester[J].North China Electric Power,2001(10):37-38,41(in Chinese).