汤涌, 卜广全, 易俊.印度“7.30”、“7.31”大停电事故分析及启示[J].中国电机工程学报, 2012, 32(25):167-174.Tang Yong, Bu Guangquan, Yi Jun.Analysis and lessons of the blackout in Indian Power Grid on July 30 and 31, 2012[J].Proceedings of the CSEE, 2012, 32(25):167-174(in Chinese).
[2]
Chen Qiming, McCalley J D.Identifying high risk N-k contingencies for online security assessment[J].IEEE Transactions on Power Systems, 2005, 20(2):823-834.
[3]
赵峰, 孙宏斌, 张伯明.基于电气分区的输电断面及其自动发现[J].电力系统自动化, 2011, 35(5):42-46.Zhao Feng, Sun Hongbin, Zhang Boming.Electrical zone division based automatic discovery of flowgates[J].Automation of Electric Power Systems, 2011, 35(5):42-46(in Chinese).
[4]
Li Gang, Wang Zengping, Ren Jianwen, et al.Power system transmission section security protection control program[C]//2010 International Conference on Machine Learning and Cybernetics.Qingdao, China:IEEE, 2010:951-955.
[5]
Zhang Baohui, Cheng Linyan, Hao Zhiguo, et al.Study on security protection of transmission section to prevent cascading tripping and its key technologies[C]//2008 IEEE/PES Transmission & Distribution Conference & Exposition:Latin America.Bogota, Colombia:IEEE, 2008:1-13.
[6]
Cheng Linyan, Zhang Baohui, Li Guanghui, et al.Fast search for transmission section based on power component of line[C]//2011 2nd IEEE PES International Conference and Exhibition on Innovative Smart Grid Technologies.Manchester, United Kingdom:IEEE, 2011:1-5.
[7]
方竹, 白晓民, 丁剑, 等.电力系统关键输电断面的动态搜索算法[C]//第十一届全国电工数学学术年会论文集.中国福州:中国电机工程学会电工数学专业委员会, 2007:223-231.Fang Zhu, Bai Xiaoming, Ding Jian, et al.Dynamic search arithmetic for key transmission section of power system[C]//The 11th National Electrical Mathematics Conference Proceedings.Fuzhou:Chinese Society for Electrical Engineering Mathematics, 2007:223-231(in Chinese).
[8]
周德才, 张保会, 姚峰, 等.基于图论的输电断面快速搜索[J].中国电机工程学报, 2006, 26(12):32-38.Zhou Decai, Zhang Baohui, Yao Feng, et al.Fast search for transmission section based on graph theory[J].Proceedings of the CSEE, 2006, 26(12):32-38(in Chinese).
[9]
童星, 康重庆, 陈启鑫, 等.虚拟母线技术及其应用(I):虚拟母线辨识算法[J].中国电机工程学报, 2014, 34(4):596-604.Tong Xing, Kang Chongqing, Chen Qixin, et al.Virtual bus technique and its application (I): virtual bus identifying algorithm[J].Proceedings of the CSEE, 2014, 34(4):596-604(in Chinese).
[10]
中华人民共和国水利电力部.SD 131-84电力系统技术导则(试行)[S].北京:水利电力出版社, 1984.China Ministry of Water Resource & Power Industry.SD 131-84 Power Ssytem Technical Guildlines (Trial)[S].Beijing:Hydraulic and Electric Power Press, 1984(in Chinese).
[11]
汪洋, 夏清, 康重庆.考虑电网N - 1闭环安全校核的最优安全发电计划[J].中国电机工程学报, 2011, 31(10):39-45.Wang Yang, Xia Qing, Kang Chongqing.Optimal security constrained generation scheduling considering closed-loop N - 1 security correction[J].Proceedings of the CSEE, 2011, 31(10):39-45(in Chinese).
[12]
夏叶, 康重庆, 宁波, 等.用户侧互动模式下发用电一体化静态安全校核[J].电力系统自动化, 2012, 36(9):35-41.Xia Ye, Kang Chongqing, Ning Bo, et al.Static security assessment integrating generation and consumption with demand response[J].Automation of Electric Power Systems, 2012, 36(9):35-41(in Chinese).
[13]
Chen Qiming, Jiang Chuanwen, QiuWenzheng, et al.Probability models for estimating the probabilities of cascading outages in high-voltage transmission network[J].IEEE Transactions on Power Systems, 2006, 21(3):1423-1431.
[14]
U.S.-Canada Power System Outage Task Force.Final report on the August 14, 2003 blackout in the United States and Canada:causes and recommendations[R].Washington, D.C.:U.S.-Canada Power System Outage Task Force, 2004.
[15]
刘永奇, 谢开.从调度角度分析8.14美加大停电[J].电网技术, 2004, 28(08):10-15.Liu Yongqi, Xie Kai.Analysis on blackout of interconnected north America power grid occurred on Aug. 14, 2003 from the viewpoint of power system dispatching[J].Power System Technology, 2004, 28(08):10-15(in Chinese).
[16]
印永华, 郭剑波, 赵建军, 等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术, 2003, 27(10):8-11.Ying Yonghua, Guo Jianbo, Zhao Jianjun, et al.Preliminary analysis of large scale blackout in interconnected north America power grid on august 14 and lessons to be drawn[J].Power System Technology, 2003, 27(10):8-11(in Chinese).
[17]
Sung-Kwan J, Jang-Chul K, Chen-Ching L.Empirical analysis of the impact of 2003 blackout on security values of U.S. utilities and electrical equipment manufacturing firms[J].IEEE Transactions on Power Systems, 2007, 22(3):1012-1018.
[18]
李再华, 白晓民, 丁剑, 等.西欧大停电事故分析[J].电力系统自动化, 2007, 31(1):1-3.Li Zaihua, Bai Xiaomin, Ding Jian, et al.An analysis of the western Europe blackout[J].Automation of Electric Power Systems, 2007, 31(1):1-3(in Chinese).
[19]
李春艳, 孙元章, 陈向宜, 等.西欧“11.4”大停电事故的初步分析及防止我国大面积停电事故的措施[J].电网技术, 2006, 30(24):16-21.Li Chunyan, Sun Yuanzhang, Chen Xiangyi, et al.Preliminary analysis of large scale blackout in western Europe power grid on November 4 and measures to prevent large scale blackout in China[J].Power System Technology, 2006, 30(24):16-21(in Chinese).
[20]
Li Chunyan, Sun Yuanzhang, Chen Xiangyi.Analysis of the blackout in Europe on November 4, 2006[C]//The 8th International Power Engineering Conference.Meritus Mandarin, Singapore:IEEE, 2007:939-944.
[21]
Chen Xiangyi, Deng Changhong, Chen Yunping, et al.Blackout prevention:anatomy of the blackout in Europe[C]//The 8th International Power Engineering Conference.Meritus Mandarin, Singapore:IEEE, 2007:928-932.