邵旭东,程翔云. 桥梁理论与计算 [M]. 北京: 人民交通出版社,2007.SHAO Xu-dong,CHENG Xiang-yun. Bridge Theory &Computation [M]. Beijing: China CommunicationsPress,2007.
[9]
曹三鹏,刘钊,岳力强. 移动模架施工 PC 连续梁桥悬臂段箱梁空间效应不利影响及其防治措施 [J]. 公路交通科技,2006,23 (12): 86-90.CAO San-peng, LIU Zhao, YUE Li-qiang. ImpactAnalysis and Crack Prevention for PC Continuous BoxGirder Arising from Movable Scaffolding System [J].Journal of Highway and Transportation Research andDevelopment, 2006,23 (12): 86-90.
[10]
曹海顺,洪国治. 宽箱梁荷载横向分布的探讨 [J].结构工程师,2005, 21 (4): 39-42.CAO Hai-shun,HONG Guo-zhi. Research on TransverseLoad Distribution for Broad Box Girder [J]. StructuresEngineers, 2005, 21 (4): 39-42.
[11]
宋少云,尹芳. 有限元网格划分中的圣维南原理及其应用[J]. 机械设计与制造 ,2012 (8): 63-65.SONG Shao-yun,YIN Fang. Sain Vaint Principle ofMeshing in Finite Element Method and Its Application [J].Machinery Design & Manufacture,2012 (8): 63-65.
[12]
王岚,李长凤,邢永明. 曲线箱梁剪力滞效应的弹性分析 [J]. 公路交通科技,2008, 25 (7): 65-69.WANG Lan,LI Chang-feng,XING Yong-ming. Analysisof Elastic Behaviors of Share Lag Effect in Curved BoxGirders [J]. Journal of Highway and TransportationResearch and Development, 2008, 25 (7): 65-69.