张文学.预应力混凝土连续箱梁局部应力分析及拉-压杆设计 [D] 上海:同济大学,2007.ZHANG Wenxue.Analysis of Partial Stress in Continuous PC Box Girder and Strut-and-Tie Design Methods [J] Shanghai:Tongji University,2007.
[3]
张文学,龙佩恒,王丽群.预应力混凝土连续箱梁不 同布索方式对比分析 [J] 公路交通科技,2009,26 (9):80-84.ZHANG Wenxue,LONG Peiheng,WANG Liqun.Analysis of Different Tendon Layout Types for PC Continuous Box Girder [J] Journal of Highway and Transportation Research and Development,2009,26 (9):80-84.
[4]
JTG D62—2004,公路钢筋混凝土及预应力混凝土桥涵设计规范 [S] JTG D62—2004,Code for Design of Highway Reinforced Concrete and Prsetressed Concrete Bridges and Culverts [S]
[5]
白海锋.大跨度预应力混凝土连续箱梁施工监测控制 研究 [J] 铁道工程学报,2008,25 (3):38-41.BAI Haifeng.Study on Construction Control of Large Span Prestressed Concrete Curved Continuous Box Beam [J] Journal of Railway Engineering Society,2008,25 (3):38-41.
[6]
雷宇,黎曦.大跨度组合梁斜拉桥全过程稳定性研究 [J] 公路交通科技,2009,26 (10):71-75.LEI Yu,LI Xi.Study of Stability of Long-span Composite Deck Cable-stayed Bridge during Construction Process [J] Journal of Highway and Transportation Research and Development,2009,26 (10):71-75.
[7]
张文学,吴海军,王景景.预应力混凝土连续箱梁顶底板搭接索拉-压杆分析 [J] 公路交通科技,2012,29 (3):70-73.ZHANG Wenxue,WU Haijun,WANG Jingjing.Analysis of PC Continuous Box Girder Top and Bottom Overlap Tendon with Strut-and-tie Method [J] Journal of Highway and Transportation Research and Development,2012,29 (3):70-73.
[8]
向木生,陆伟,朱红明,等.大跨径PC连续梁桥悬臂施工中的工艺控制 [J] 公路交通科技,2004,21 (1):71-73.XIANG Musheng,LU Wei,ZHU Hongming,et al.Process Control Technology during Cast-in-place Cantilever Construction in Long Span Prestressed Concrete Continuous Beam Bridge [J] Journal of Highway and Transportation Research and Development,2004,21 (1):71-73.
[9]
周瑞泽.预应力连续箱梁悬臂浇注施工技术 [J] 铁道标准设计,2007 (8):68-70.ZHOU Ruize.Construction Technology of Prestressed Continuous Box Beam Cantilever [J] Railway Standard Design,2007 (8):68-70.
[10]
任翔,姜智英,黄平明.斜拉桁架桥悬拼施工过程的力学行为分析 [J] 公路交通科技,2009 ,26 (2):90-102.REN Xiang,JIANG Zhiying,HUANG Pingming.Analysis of Mechanical Behavior in Construction of Oblique-pulling Truss Bridge [J] Journal of Highway and Transportation Research and Development,2009 ,26 (2):90-102.