交通运输部,国家公路网规划研究[R].北京:交通 运输部,2010. Ministry of Transport, Research on National Road Network Planning[R]. Beijing: Ministry of Transport,2010.
[2]
王秉纲,周伟.公路建设项日的模糊排序和投资决策 优化[J].中国管理科学,1997, 5 (2) : 28 -31. WANG Bing-gang, ZHOU Wei. Optimizing the Fuzzy Sequencing and Investment Decision on Projects of Highway Construction[J].Chinese Journal of Management Science, 1997,5 (2):28一31.
[3]
曲大义,王炜,邓卫,等.层次分析法在公路网规划 建设项日排序中的应用[J].公路交通科技,2000, 17 (5):102一106. QU Da-yi,WANG Wei,DENG Wei,et al. AHP Applied in Priority Order Decision Highway Network Planning [J]. Journal of Highway and Transportation Research and Development, 2000,17 (5):102一106.
[4]
崔洪军,陆建,王炜.基于多目标灰关联投影法的道 路建设项日排序模型[J].交通运输工程与信息学 报,2004, 2 (3):83一87. CUI Honk-jun, LU Jian,WANG Wei. Priority Decision Model of Road Construction Project Based on Grey Relation Projection Multi一Criteria Decision Method[J] . Journal of Transportation Engineering and Information, 2004,2 (3):83一87.
[5]
梁颖,陈艳艳,任福田.基于单元重要度分析的公路 网规划项目建设序列论证[J].北京工业大学学报, 2005,31(3):284一287. LIANG Ying, CHEN Yan-yan, REN Fu-tian. Project Order Decision of Road Network Planning Based on the Component Importance Analysis[J].Journal of Beijing University of Technology, 2005,31(3):284一287.
[6]
曹守华,袁振洲,沙滨,等.基于动态理论的公路建 设项目序列安排[J].交通与计算机,2005 , 23 (4):39一43. CAO Shou-hua, YUAN Zhen-zhou, SHA Bin, et al. Highway Constructive Project Sequencing Based on Dynamic Theory[J].Computer and Communications, 2005,23 (4):39一43.
[7]
罗君君.基于熵权的公路建设项目排序多目标决策分 析[J].华中科技大学学报:城市科学版,2006, 23 (3):62一64. LUO Jun-jun. Multi-objective Decision Analysis of Highway Construction Projects Priority Based on Entropy Weight[J].Journal of Huazhong University of Science and Technology:Urban Science Edition, 2006,23(3): 62一64.
[8]
李晓伟,陈红,马娟,等.基于TOPSIS的公路建设 项目排序方法及应用[J].长安大学学报:自然科 学版,2012, 32 (3):49一52. LI Xiao-wei,CHEN Hong, MA Juan, et al. Priority Method and Its Application in Highway Construction Projects Based on TOPSIS[J]Journal of Chang'an University:Natural Science Edition, 2012,32(3): 49一52.
[9]
李晓伟,陈红,邵海鹏,等.基于累积前景理论的公 路建设项目灰关联排序模型[J].公路交通科技, 2011,28 (10):130一135. LI Xiao-wei,CHEN Hong, SHAO Hai-peng, et al. Grey Construction Project Based on Cumulative Prospect Theory [J] . Journal of Highway and Transportation Research and Development, 2011,28 (10):130一135.
[10]
SIENKIEWICZ J, HOIYST J A. Statistical Analysis of 22 Public Transport Networks in Poland[J].Physical Review E,2005,72 (4):104一127.
[11]
刘昕,吴永平,付鑫.京津都市圈空间运输联系的分 布特征研究[J].公路交通科技,2006, 23 (10): 155一158. LIU Xin,WU Yong-ping, FU Xin. Study on Distribution Character of Spatial Transport Linkage in Beijing-Tianjin Metropolis[J].Journal of Highway and Transportation Research and Development, 2006,23(10): 155一158.
[12]
虎啸,吴群琪.基于运输需求的基础路网规划理论与 方法研究[J].公路交通科技,2010, 27 (5): 121一127. HU Xiao,WU Qun-qi. Study on Theory and Method of Basic Road Network Planning Based on Transport Demand[J]. Journal of Highway and Transportation Research and Development, 2010,27 (5):121一127.
[13]
陈彦光.空间相互作用模型的形式、量纲和局域性问 题探讨[J].北京大学学报:自然科学版,2009, 45 (2):333一338. CHEN Yan-guang. On the Mathematical Form, Dimension, and Locality of the Spatial Interaction Model [J].Acta Scientiarum Naturalium Universitatis Pekinensis,2009,45 (2):333一338.
[14]
LATORA V, MARCHIORI M. Economic Small-World Behavior In Weighted Networks[J].The European Physical Journal B,2003,32 (2): 249一263.
[15]
赵佳虹.时变条件下应急物流多目标LRP研究[J]. 公路交通科技,2012, 29 (4):137一142. ZHAO Jia-hong, Multi-objective Location-routing Problem in Emergency Logistics as Time Varies[J].Journal of Highway and Transportation Research and Development, 2012,29 (4):137一142.