全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

基于损益云模型的制造车间重调度决策方法

DOI: 10.13195/j.kzyjc.2013.0842, PP. 1458-1464

Keywords: 重调度驱动机制,云理论,损益云模型,损益比

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对制造车间重调度触发机制问题,建立了制造车间重调度损益函数,揭示了生产车间重调度过程损失及增益的变化规律.引入云理论测度重调度损益的不确定性,使用逆向云算法计算重调度增益云和损失云的数字特征,根据云形态预测重调度损益变化趋势.提出一种基于损益云模型的重调度决策方法以判断是否需要重调度,并利用最佳损益比甄选预调度方案以兼顾生产系统的稳定性和有效性.最后,通过实例验证了该方法的合理性和实用性.

References

[1]  刘琳, 谷寒雨, 席裕庚. 工件到达时间未知的动态车间滚动重调度[J]. 机械工程学报, 2008, 44(5): 68-75.
[2]  (Li L, Gu H Y, Xi Y G. Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time[J]. Chinese J of Mechanical Engineering, 2008, 44(5): 68-75.)
[3]  Qiao F, Wu Q D, Li L, et al. A fuzzy Petri net-based reasoning method for rescheduling[J]. Trans of the Institute of Measurement and Control, 2011, 33(3/4): 435-455.
[4]  Snoo C de, Wezel W V, Wortmann J C, et al. Coordination activities of human planners during rescheduling: Case analysis and event handling procedure[J]. Int J of Production Research, 2011, 49(7): 2101-2122.
[5]  Palombarini J, Martinez E. SmartGantt—An intelligent system for real time rescheduling based on relational reinforcement learning[J]. Expert Systems with Applications, 2012, 39(11): 10251-10268.
[6]  刘明周, 单晖, 蒋增强, 等. 不确定条件下车间动态重调度优化方法[J]. 机械工程学报, 2009, 45(10): 137-142.
[7]  (Lin M Z, Shan H, Jiang Z Q, et al. Dynamic rescheduling optimization of job shop under uncertain conditions[J]. Chinese J of Mechanical Engineering, 2009, 45(10): 137-142.)
[8]  李德毅. 知识表示中的不确定性[J]. 中国工程科学, 2000, 2(10): 73-79.
[9]  (Li D Y. Uncertainty in knowledge representation[J]. Engineering Science, 2000, 2(10): 73-79.)
[10]  Vieira G E, Herrmann J W, Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods[J]. J of Scheduling, 2003, 6(1): 39-62.
[11]  李莉, 乔非, 许潇红, 等. 半导体生产线全局修正式重调度方法研究[J]. 计算机集成制造系统, 2006, 12(7): 1022-1027.
[12]  (Li L, Qiao F, Xu X H, et al. Completing modification rescheduling method for semiconductor wafer fabs[J]. Computer Integrated Manufacturing Systems, 2006, 12(7): 1022-1027.)
[13]  乔非, 李莉, 王遵彤, 等. 面向半导体生产的改进的混合重调度策略研究[J]. 计算机集成制造系统, 2007, 13(3): 558-562.
[14]  (Qiao F, Li L, Wang Z T, et al. Improved rescheduling strategy for semiconductor manufacturing[J]. Computer Integrated Manufacturing Systems, 2007, 13(3): 558-562.)
[15]  张洁, 翟文彬, 严隽琪, 等. 基于模糊神经网络的半导体生产线重调度策略优化[J]. 机械工程学报, 2005, 41(10): 75-79.
[16]  (Zhang J, Zhai W B, Yan J Q, et al. Fuzzy neural networks based rescheduling strategies optimization of semiconductor fabrication line[J]. Chinese J of Mechanical Engineering, 2005, 41(10): 75-79.)
[17]  Haruhiko S. A new when-to-schedule policy in online scheduling based on cumulative task delays[J]. Int J of Production Economics, 2007, 110(1/2): 175-186.
[18]  Ouelhadj D, Petrovic S. A survey of dynamic scheduling in manufacturing systems[J]. J of Scheduling, 2009, 12(4): 417-431.
[19]  Petrovic D, Duenas A. A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions[J]. Fuzzy Sets and Systems, 2006, 157(16): 2273-2285.
[20]  刘常昱, 冯芒, 戴晓军, 等. 基于云?? 信息的逆向云新算法[J]. 系统仿真学报, 2004, 16(11): 2417-2420.
[21]  (Liu C Y, Feng M, Dai X J, et al. A new algorithm of backward cloud[J]. J of System Simulation, 2004, 16(11): 2417-2420.)
[22]  葛茂根, 刘明周, 张明伟, 等. 计及机器调整和物料运送时间的Job-Shop 调度算法[J]. 农业机械学报, 2008, 39(11): 127-131.
[23]  (GeMG, LiuMZ, ZhangMW, et al. Job-Shop scheduling algorithm considering machine set-up and material transit time[J]. Trans of the Chinese Society for Agricultural Machinery, 2008, 39(11): 127-131.)
[24]  Beasley J E. OR-Library: Distributing test problems by electronic mail[J]. J of the Operational Research Society, 1990, 41(11): 1069-1072.
[25]  吕辉军, 王晔, 李德毅, 等. 逆向云在定性评价中的应用[J]. 计算机学报, 2003, 26(8): 1009-1014.
[26]  (Lv H J,Wang Y, Li D Y, et al. The application of backward cloud in qualitative evaluation[J]. Chinese J of Computers, 2003, 26(8): 1009-1014.)

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133