(Li L, Gu H Y, Xi Y G. Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time[J]. Chinese J of Mechanical Engineering, 2008, 44(5): 68-75.)
[3]
Qiao F, Wu Q D, Li L, et al. A fuzzy Petri net-based reasoning method for rescheduling[J]. Trans of the Institute of Measurement and Control, 2011, 33(3/4): 435-455.
[4]
Snoo C de, Wezel W V, Wortmann J C, et al. Coordination activities of human planners during rescheduling: Case analysis and event handling procedure[J]. Int J of Production Research, 2011, 49(7): 2101-2122.
[5]
Palombarini J, Martinez E. SmartGantt—An intelligent system for real time rescheduling based on relational reinforcement learning[J]. Expert Systems with Applications, 2012, 39(11): 10251-10268.
(Lin M Z, Shan H, Jiang Z Q, et al. Dynamic rescheduling optimization of job shop under uncertain conditions[J]. Chinese J of Mechanical Engineering, 2009, 45(10): 137-142.)
[8]
李德毅. 知识表示中的不确定性[J]. 中国工程科学, 2000, 2(10): 73-79.
[9]
(Li D Y. Uncertainty in knowledge representation[J]. Engineering Science, 2000, 2(10): 73-79.)
[10]
Vieira G E, Herrmann J W, Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods[J]. J of Scheduling, 2003, 6(1): 39-62.
(Qiao F, Li L, Wang Z T, et al. Improved rescheduling strategy for semiconductor manufacturing[J]. Computer Integrated Manufacturing Systems, 2007, 13(3): 558-562.)
(Zhang J, Zhai W B, Yan J Q, et al. Fuzzy neural networks based rescheduling strategies optimization of semiconductor fabrication line[J]. Chinese J of Mechanical Engineering, 2005, 41(10): 75-79.)
[17]
Haruhiko S. A new when-to-schedule policy in online scheduling based on cumulative task delays[J]. Int J of Production Economics, 2007, 110(1/2): 175-186.
[18]
Ouelhadj D, Petrovic S. A survey of dynamic scheduling in manufacturing systems[J]. J of Scheduling, 2009, 12(4): 417-431.
[19]
Petrovic D, Duenas A. A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions[J]. Fuzzy Sets and Systems, 2006, 157(16): 2273-2285.
(GeMG, LiuMZ, ZhangMW, et al. Job-Shop scheduling algorithm considering machine set-up and material transit time[J]. Trans of the Chinese Society for Agricultural Machinery, 2008, 39(11): 127-131.)
[24]
Beasley J E. OR-Library: Distributing test problems by electronic mail[J]. J of the Operational Research Society, 1990, 41(11): 1069-1072.