全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
环境科学  2012 

Research of Controlling Condition for Aeration Stabilization Pond Dealing with Sanitary Waste of Countryside
曝气稳定塘处理农村生活污水曝气控制条件研究

Keywords: aeration stabilization pond,sanitary waste of countryside,discontinuous running aeration,detention time,pollutant
曝气稳定塘
,农村生活污水,间歇曝气,停留时间,污染物

Full-Text   Cite this paper   Add to My Lib

Abstract:

According to research of some problems, such as the hydraulic detention time that aeration stabilization pond deals with sanitary waste of countryside, dissolved oxygen in pond during the process of aeration, the concentration distribution of sludge and different aeration periods affecting on the treatment efficiency, we can acquire good treatment efficiency and energy consumption of economy. The results indicate that under the aeration stabilization pond of this experiment, 4 d is the best hydraulic detention time with this aeration stabilization pond. Time of the discontinuous running aeration should be greater than 15 min. The concentration distribution of sludge can reach equilibrium at each point of aeration stabilization pond between 2 min and 10 min. The best aeration period of dislodging the pollutant is 0.5 h aeration/1.0 h cut-off.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133