%0 Journal Article %T A Case Study of the Landslide in Ciftlikkoy District Genclik Street %A Burak Evirgen %J - %D 2019 %X In this study, the stability problem of the landslide occurred at 0.65th km of road that has a 20.00 m width and 4 lanes, which is located at Ciftlikkoy district of Yalova province, was investigated with two different finite element software. Physical and mechanical properties obtained from the in-situ samples were used during the modelling processes. The circle of failure, factor of safety and failure possibilities of slope were observed in the case of external static and dynamic load conditions within the stability analysis performed by Slide program. In the event that the factor of safety value reached the level around 0.80, the current failure behavior was occurred. Besides, axial force, shear force, bending moment and deformation values of piles were calculated by Plaxis. An adjacent bored pile application formed a single row has a 60.00 cm in diameter and 8.00 m in length was chosen with respect to the internal force and displacement results of 6.00, 8.00, 10.00, 12.00 and 14.00 m pile lengths as well as constant diameter. Therefore, the stability problem of slope was solved by the precaution of piled wall In this study, the stability problem of the landslide occurred at 0.65th km of road that has a 20.00 m width and 4 lanes, which is located at Ciftlikkoy district of Yalova province, was investigated with two different finite element software. Physical and mechanical properties obtained from the in-situ samples were used during the modelling processes. The circle of failure, factor of safety and failure possibilities of slope were observed in the case of external static and dynamic load conditions within the stability analysis performed by Slide program. In the event that the factor of safety value reached the level around 0.80, the current failure behavior was occurred. Besides, axial force, shear force, bending moment and deformation values of piles were calculated by Plaxis. An adjacent bored pile application formed a single row has a 60.00 cm in diameter and 8.00 m in length was chosen with respect to the internal force and displacement results of 6.00, 8.00, 10.00, 12.00 and 14.00 m pile lengths as well as constant diameter. Therefore, the stability problem of slope was solved by the precaution of piled wall that put into service the road safely within 4.90 factor of safety and 65.00 mm top displacement of pile %K £¿ev stabilitesi %K Kaz£¿kl£¿ duvar %K Heyelan %K Plaxis %K slide %U http://dergipark.org.tr/dubited/issue/43004/483532